Environmental
Admin Record Search

Former Naval Shipyard Hunters Point

Type in a word or phrase that you want to search for. For example, "waste" or "site screening". You may also search through Author Affiliation (i.e. EPA CH2M Hill), and Site/AOR/UXO (i.e. type in the number of the Site, AOR, UXO, etc.). Then click the Search button.
From Date: To Date:
Filter By
Record Type:
  • Correspondence
  • Report
  • Minutes
  • Fact Sheet
  • Public Notice
  • Other
Attachment:
  • Available for Download
  • Request Document
3360 Records Found
  • TRANSMITTAL OF FINAL SVE SYSTEM OPERATION, MAINTENANCE AND MONITORING STATUS UPDATE FOR OCTOBER 2019- SEPTEMBER 2020 OPERATING PERIOD, IR-10 CARVEOUT, PARCEL B-1, DATED 1 FEBRUARY 2021 (PUBLIC DOCUMENT)
    Site(s): SITE 00010
    • BRAC PMO WEST
    • 02/18/2021
    • Correspondence
    • Record#: 006300
    • View Record
  • FINAL FEDERAL FACILITIES AGREEMENT SCHEDULE
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
  • TRANSMITTAL OF FINAL FEDERAL FACILITIES AGREEMENT SCHEDULE, DATED 22 JANUARY 2021
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
    • BRAC PMO WEST
    • 01/22/2021
    • Correspondence
    • Record#: 006298
    • View Record
  • DRAFT FINAL REMOVAL SITE EVALUATION WORK PLAN, RADIOLOGICAL CONFIRMATION SAMPLING AND SURVEY, PARCELS D-2, UC-1, UC-2, AND UC-3 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-2, PARCEL UC1, PARCEL UC2, PARCEL UC3
    • APTIM FEDERAL SERVICES, LLC
    • 01/01/2021
    • Report
    • Record#: 006290
    • View Record
  • FINAL SVE SYSTEM OPERATION, MAINTENANCE AND MONITORING STATUS UPDATE FOR OCTOBER 2019- SEPTEMBER 2020 OPERATING PERIOD, IR-10 CARVEOUT, PARCEL B-1 (PUBLIC DOCUMENT)
    Site(s): SITE 00010
    • INNOVEX - ERRG, JOINT VENTURE
    • 01/01/2021
    • Report
    • Record#: 006301
    • View Record
  • TRANSMITTAL OF FINAL WORK PLAN RADIOLOGICAL HEALTH AND SAFETY SURVEY OF AREAS, DATED 16 NOVEMBER 2020
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
    • BRAC PMO WEST
    • 11/16/2020
    • Correspondence
    • Record#: 006288
    • View Record
  • FINAL WORK PLAN RADIOLOGICAL HEALTH AND SAFETY SURVEY OF AREAS
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3, SITE 00035
  • FINAL WORK PLAN ADDENDUM, BASEWIDE RADIOLOGICAL SUPPORT
    Site(s): PARCEL E, SITE 00002, SITE 00003, SITE 00012
    • APTIM FEDERAL SERVICES, LLC
    • 11/03/2020
    • Report
    • Record#: 006287
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN, RADIOLOGICAL HEALTH AND SAFETY SURVEYS OF AREAS
    Site(s): PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3, SITE 00007, SITE 00028, SITE 00035, SITE 00036
  • FINAL REMOVAL ACTION COMPLETION SUMMARY REPORT, RADIOLOGICAL CHARACTERIZATION SURVEY OF SANITARY SEWERS AND STORM DRAINS, PARCEL C HISTORIC DISTRICT
    Site(s): PARCEL C
    • APTIM FEDERAL SERVICES, LLC
    • 06/24/2020
    • Report
    • Record#: 006286
    • View Record
  • TRANSMITTAL OF FINAL REMOVAL ACTION COMPLETION SUMMARY REPORT, RADIOLOGICAL CHARACTERIZATION SURVEY OF SANITARY SEWERS AND STORM DRAINS, PARCEL C HISTORIC DISTRICT, DATED 24 JUNE 2020
    Site(s): PARCEL C
    • BRAC PMO WEST
    • 06/24/2020
    • Correspondence
    • Record#: 006285
    • View Record
  • TRANSMITTAL OF FINAL BACKGROUND SOIL STUDY REPORT, DATED 11 JUNE 2020
    Site(s): PARCEL B, PARCEL C, PARCEL D-2, PARCEL E, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
  • FINAL BACKGROUND SOIL STUDY REPORT (MAIN REPORT, TABLES, FIGURES, AND APPENDICES A THROUGH F)
    Site(s): PARCEL B, PARCEL C, PARCEL D-2, PARCEL E, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
  • FINAL BACKGROUND SOIL STUDY REPORT (APPENDICES G THROUGH P)
    Site(s): PARCEL B, PARCEL C, PARCEL D-2, PARCEL E, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
  • FINAL 2019 ANNUAL GROUNDWATER MONITORING REPORT (APPENDIX E, PART 3 OF 4) [PUBLIC DOCUMENT]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC2, SITE 00018
    • TREVET - BAY WEST, JOINT VENTURE
    • 06/05/2020
    • Report
    • Record#: 006275
    • View Record
  • FINAL 2019 ANNUAL GROUNDWATER MONITORING REPORT (APPENDIX E, PART 4 OF 4) [PUBLIC DOCUMENT]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC2, SITE 00018
    • TREVET - BAY WEST, JOINT VENTURE
    • 06/05/2020
    • Report
    • Record#: 006276
    • View Record
  • FINAL 2019 ANNUAL GROUNDWATER MONITORING REPORT (APPENDIX E, PART 1 OF 4) [PUBLIC DOCUMENT]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC2, SITE 00018
    • TREVET - BAY WEST, JOINT VENTURE
    • 06/05/2020
    • Report
    • Record#: 006273
    • View Record
  • FINAL 2019 ANNUAL GROUNDWATER MONITORING REPORT (APPENDIX E, PART 2 OF 4) [PUBLIC DOCUMENT]
    Site(s): BASEWIDE
    • TREVET - BAY WEST, JOINT VENTURE
    • 06/05/2020
    • Report
    • Record#: 006274
    • View Record
  • TRANSMITTAL OF FINAL 2019 ANNUAL GROUNDWATER MONITORING REPORT, DATED 5 JUNE 2020 (PUBLIC DOCUMENT)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC2, SITE 00018
    • BRAC PMO WEST
    • 06/05/2020
    • Correspondence
    • Record#: 006271
    • View Record
  • FINAL 2019 ANNUAL GROUNDWATER MONITORING REPORT (MAIN REPORT, TABLES, FIGURES, AND APPENDICES A THROUGH D) [PUBLIC DOCUMENT]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC2, SITE 00018
    • TREVET - BAY WEST, JOINT VENTURE
    • 06/05/2020
    • Report
    • Record#: 006272
    • View Record
  • TRANSMITTAL OF ANNUAL OPERATION AND MAINTENANCE SUMMARY REPORT, DURABLE COVER, PARCEL D-1, DATED 1 APRIL 2020 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
    • BRAC PMO WEST
    • 04/01/2020
    • Correspondence
    • Record#: 006291
    • View Record
  • ANNUAL OPERATION AND MAINTENANCE SUMMARY REPORT, DURABLE COVER, PARCEL D-1 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
    • APTIM FEDERAL SERVICES, LLC
    • 04/01/2020
    • Report
    • Record#: 006292
    • View Record
  • TRANSMITTAL OF FINAL TECHNICAL MEMORANDUM OPTIMIZATION OF THE MANAGEMENT AND MONITORING APPROACH SAMPLING AND ANALYSIS PLAN FOR BASEWIDE GROUNDWATER MONITORING PROGRAM, DATED 1 MARCH 2020
    Site(s): BASEWIDE
    • BRAC PMO WEST
    • 03/12/2020
    • Correspondence
    • Record#: 006269
    • View Record
  • FINAL TECHNICAL MEMORANDUM OPTIMIZATION OF THE MANAGEMENT AND MONITORING APPROACH SAMPLING AND ANALYSIS PLAN FOR BASEWIDE GROUNDWATER MONITORING PROGRAM
    Site(s): BASEWIDE
    • TREVET - BAY WEST, JOINT VENTURE
    • 03/01/2020
    • Report
    • Record#: 006270
    • View Record
  • TRANSMITTAL OF FINAL FEDERAL FACILITIES AGREEMENT SCHEDULE, DATED 1 FEBRUARY 2020
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
    • BRAC PMO WEST
    • 02/14/2020
    • Correspondence
    • Record#: 006296
    • View Record
  • FINAL FEDERAL FACILITIES AGREEMENT SCHEDULE
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
  • FINAL ACCIDENT PREVENTION PLAN FOR FENCING INSTALLATION/REPAIR AND OPERATION AND MAINTENANCE OF SOIL VAPOR EXTRACTION SYSTEM AT SITE 10 (PUBLIC DOCUMENT)
    Site(s): SITE 00010
  • FINAL BASEWIDE SWALE MAINTENANCE PLAN (PUBLIC DOCUMENT)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, SITE 00007, SITE 00018
    • INNOVEX - ERRG, JOINT VENTURE
    • 01/29/2020
    • Report
    • Record#: 006099
    • View Record
  • TRANSMITTAL OF FINAL BASEWIDE SWALE MAINTENANCE PLAN, DATED 29 JANUARY 2020 (PUBLIC DOCUMENT)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, SITE 00007, SITE 00018
    • BRAC PMO WEST
    • 01/28/2020
    • Correspondence
    • Record#: 006098
    • View Record
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION COMPLETION REPORT, PARCEL E2 (PHASE 2), DATED 1 DECEMBER 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 12/17/2019
    • Correspondence
    • Record#: 006264
    • View Record
  • TRANSMITTAL OF LANDFILL FAS MONITORING REPORT, JULY-SEPTEMBER 2019, PARCEL E-2, DATED 1 NOVEMBER 2019
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 11/18/2019
    • Correspondence
    • Record#: 006265
    • View Record
  • TRANSMITTAL OF FINAL TECHNICAL MEMORANDUM FOR INSTALLATION, DESTRUCTION, REHABILITATION, AND REPAIR OF MONITORING WELLS, DATED 31 OCTOBER 2019
    Site(s): BASEWIDE
  • TRANSMITTAL OF DRAFT PHASE 2 REMEDIAL ACTION WORK PLAN, PARCEL C REMEDIAL UNITS C2, C4, AND C5, DATED 1 OCTOBER 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
    • BRAC PMO WEST
    • 10/28/2019
    • Correspondence
    • Record#: 006267
    • View Record
  • TRANSMITTAL OF DRAFT FINAL PARCEL G REMOVAL SITE EVALUATION WORK PLAN ADDENDUM, DATE 1 OCTOBER 2019
    Site(s): PARCEL G
  • TRANSMITTAL OF SOIL VAPOR EXTRACTION SYSTEM OPERATION AND MAINTENANCE SUMMARY REPORT, PARCEL B-1, DATED 1 OCTOBER 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL B
    • BRAC PMO WEST
    • 10/28/2019
    • Correspondence
    • Record#: 006266
    • View Record
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION MONITORING PLAN, PARCEL C REMEDIAL UNITS C1, C2, C4, AND C5, DATED 1 OCTOBER 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
    • BRAC PMO WEST
    • 10/09/2019
    • Correspondence
    • Record#: 006262
    • View Record
  • TRANSMITTAL OF FINAL REMEDIAL ACTION WORK PLAN, PARCEL E REMEDIAL ACTION, PHASE 2, DATED 1 OCTOBER 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
    • BRAC PMO WEST
    • 10/04/2019
    • Correspondence
    • Record#: 006261
    • View Record
  • TRANSMITTAL OF FINAL SUMMARY OF MARCH/APRIL 2019 SEMIANNUAL GROUNDWATER MONITORING DATED AND EXCEEDANCES IN GROUNDWATER, DATED 27 SEPTEMBER 2019 (PUBLIC DOCUMENT)
    Site(s): BASEWIDE
    • BRAC PMO WEST
    • 09/27/2019
    • Correspondence
    • Record#: 006259
    • View Record
  • TRANSMITTAL OF FINAL REMEDIAL ACTION WORK PLAN PARCEL E REMEDIAL ACTION-PHASE 1, DATED 19 SEPTEMBER 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
    • BRAC PMO WEST
    • 09/25/2019
    • Correspondence
    • Record#: 006062
    • View Record
  • TRANSMITTAL OF FINAL REMEDIAL ACTION WORK PLAN, PARCEL E REMEDIAL ACTION-PHASE 3, DATED 19 SEPTEMBER 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
    • BRAC PMO WEST
    • 09/25/2019
    • Correspondence
    • Record#: 006060
    • View Record
  • CONCURRENCE WITH RISK MANAGEMENT PLAN, REVISION 1 FROM GEOSYNTEC CONSULTANTS, INC. AND OFFICE OF COMMUNITY INVESTMENT AND INFRASTRUCTURE, PARCELS B-1, G, UC-1 AND UC-2, SITES 7 AND 18, DATED 1 JANUARY 2019
    Site(s): PARCEL B, PARCEL G, PARCEL UC1, PARCEL UC2, SITE 00007, SITE 00018
    • BRAC PMO WEST
    • 09/24/2019
    • Correspondence
    • Record#: 006258
    • View Record
  • FINAL REMEDIAL ACTION WORK PLAN, PARCEL E REMEDIAL ACTION-PHASE 3 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
    • APTIM FEDERAL SERVICES, LLC
    • 09/19/2019
    • Report
    • Record#: 006061
    • View Record
  • FINAL REMEDIAL ACTION WORK PLAN PARCEL E REMEDIAL ACTION-PHASE 1
    Site(s): PARCEL E
    • APTIM FEDERAL SERVICES, LLC
    • 09/19/2019
    • Report
    • Record#: 006063
    • View Record
  • TRANSMITTAL OF DRAFT BASEWIDE SWALE MAINTENANCE PLAN, DATED 28 AUGUST 2019 (PUBLIC DOCUMENT)
    Site(s): BASEWIDE
    • BRAC PMO WEST
    • 08/28/2019
    • Correspondence
    • Record#: 006257
    • View Record
  • FINAL FOURTH FIVE-YEAR REVIEW (PUBLIC DOCUMENT)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL UC1, PARCEL UC2, PARCEL UC3, SITE 00007, SITE 00018
    • INNOVEX - ERRG, JOINT VENTURE
    • 07/31/2019
    • Report
    • Record#: 006055
    • View Record
  • TRANSMITTAL OF FINAL FOURTH FIVE-YEAR REVIEW, DATED 31 JULY 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL UC1, PARCEL UC2, PARCEL UC3, SITE 00007, SITE 00018
  • TRANSMITTAL OF FINAL ADDENDUM 1 POST-CONSTRUCTION OPERATION AND MAINTENANCE PLAN, REMEDIAL ACTION IN PARCEL D-1, DATED 26 JULY 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
    • BRAC PMO WEST
    • 07/30/2019
    • Correspondence
    • Record#: 006056
    • View Record
  • FINAL ADDENDUM 1 POST-CONSTRUCTION OPERATION AND MAINTENANCE PLAN, REMEDIAL ACTION IN PARCEL D-1 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
    • APTIM FEDERAL SERVICES, LLC
    • 07/26/2019
    • Report
    • Record#: 006057
    • View Record
  • TRANSMITTAL OF DRAFT FINAL REMEDIAL ACTION WORK PLAN, PARCEL E REMEDIAL ACTION, PHASE 2, DATED 1 JULY 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
    • BRAC PMO WEST
    • 07/19/2019
    • Correspondence
    • Record#: 006256
    • View Record
  • FINAL REMEDIAL ACTION MONITORING PLAN, PARCEL E (PUBLIC DOCUMENT)
    Site(s): PARCEL E, SITE 00002, SITE 00003, SITE 00004, SITE 00012, SITE 00036
    • CONSTRUCTION ENGINEERING SERVICES, LLC
    • 07/17/2019
    • Report
    • Record#: 006051
    • View Record
  • TRANSMITTAL OF FINAL REMEDIAL ACTION MONITORING PLAN, PARCEL E, DATED 17 JULY 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL E, SITE 00002, SITE 00003, SITE 00004, SITE 00012, SITE 00036
    • BRAC PMO WEST
    • 07/17/2019
    • Correspondence
    • Record#: 006050
    • View Record
  • TRANSMITTAL OF FINAL ANNUAL LANDFILL CAP OPERATION AND MAINTENANCE REPORT FOR 2018-2019, POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL, DATED 1 JULY 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 07/15/2019
    • Correspondence
    • Record#: 006052
    • View Record
  • TRANSMITTAL OF LANDFILL GAS MONITORING REPORT FOR APRIL-JUNE 2019 POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL, DATED 2 JULY 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 07/09/2019
    • Correspondence
    • Record#: 006046
    • View Record
  • LANDFILL GAS MONITORING REPORT FOR APRIL-JUNE 2019 POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • FINAL ANNUAL LANDFILL CAP OPERATION AND MAINTENANCE REPORT FOR 2018-2019, POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION WORK PLAN, PARCEL E REMEDIAL ACTION, PHASE 3, DATED 1 JUNE 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
    • BRAC PMO WEST
    • 06/28/2019
    • Correspondence
    • Record#: 006254
    • View Record
  • TRANSMITTAL OF DRAFT FINAL REMEDIAL ACTION WORK PLAN, PARCEL E REMEDIAL ACTION, PHASE 1, DATED 1 JUNE 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
    • BRAC PMO WEST
    • 06/28/2019
    • Correspondence
    • Record#: 006255
    • View Record
  • TRANSMITTAL OF DRAFT PARCEL B-1 SOIL VAPOR EXTRACTION SYSTEM OPERATION AND MAINTENANCE SUMMARY REPORT (PUBLIC DOCUMENT)
    Site(s): PARCEL B
    • BRAC PMO WEST
    • 06/18/2019
    • Correspondence
    • Record#: 006253
    • View Record
  • TRANSMITTAL OF FINAL FOURTH FIVE YEAR REVIEW, DATED 1 JUNE 2019 (PUBLIC DOCUMENT)
    Site(s): BASEWIDE
  • TRANSMITTAL OF FINAL PARCEL G REMOVAL SITE EVALUATION WORK PLAN, DATED 6 JUNE 2019
    Site(s): PARCEL G
  • FINAL PARCEL G REMOVAL SITE EVALUATION WORK PLAN
    Site(s): PARCEL G
  • TRANSMITTAL OF FINAL REVISION 2, RADIOLOGICAL SCOPING SURVEYS WORK PLAN, PARCEL F STRUCTURES, DATED 24 MAY 2019
    Site(s): PARCEL F
  • TRANSMITTAL OF REPLACEMENT PAGES FOR FINAL WORK PLAN, PARCEL C BUILDING 211 AND 253, DATED 1 APRIL 2018
    Site(s): PARCEL C
  • FINAL RADIATION PROTECTION PLAN, RADIOLOGICAL CONFIRMATION SAMPLING AND SURVEY, PARCELS D-2, UC-1, UC-2, AND UC-3
    Site(s): PARCEL D-2, PARCEL UC1, PARCEL UC2, PARCEL UC3
  • FINAL REVISION 2, RADIOLOGICAL SCOPING SURVEYS WORK PLAN, PARCEL F STRUCTURES
    Site(s): PARCEL F
    • APTIM FEDERAL SERVICES, LLC
    • 05/24/2019
    • Report
    • Record#: 006059
    • View Record
  • TRANSMITTAL OF DRAFT ADDENDUM 1 POST-CONSTRUCTION OPERATIONS AND MAINTENANCE PLAN FOR PARCEL D-1, DATED 1 MAY 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
    • BRAC PMO WEST
    • 05/15/2019
    • Correspondence
    • Record#: 006250
    • View Record
  • TRANSMITTAL OF FINAL REMOVAL ACTION COMPLETION REPORT, RADIOLOGICAL REMEDIATION AND SUPPORT PARCEL D-1 PHASE 2, DATED 1 MAY 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • TRANSMITTAL OF FINAL LANDFILL GAS MONITORING REPORT FOR JANUARY-MARCH 2019, POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL, DATED 23 APRIL 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 05/01/2019
    • Correspondence
    • Record#: 006034
    • View Record
  • FINAL REMOVAL ACTION COMPLETION REPORT, RADIOLOGICAL REMEDIATION AND SUPPORT PARCEL D-1 PHASE 2 (MAIN REPORT AND APPENDICES A THROUGH L) [PUBLIC DOCUMENT]
    Site(s): PARCEL D-1
  • FINAL REMOVAL ACTION COMPLETION REPORT, RADIOLOGICAL REMEDIATION AND SUPPORT PARCEL D-1 PHASE 2 (APPENDICES M THROUGH R) [PUBLIC DOCUMENT]
    Site(s): PARCEL D-1
  • TRANSMITTAL OF DRAFT EXECUTION PLAN FOR PARCELS E AND E-2 SANITARY SEWER AND STORM DRAIN AND FORMER SALVAGE YARD RADIOLOGICAL REMEDIATION AND SUPPORT, DATED 30 APRIL 2019
    Site(s): PARCEL E, PARCEL E2
  • TRANSMITTAL OF FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JULY TO DECEMBER 2018, DATED 22 APRIL 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC2, SITE 00007, SITE 00018, SITE 00026
  • TRANSMITTAL OF 1) FINAL REMEDIAL ACTION COMPLETION REPORT; 2) FINAL, FINAL STATUS SURVEY, FORMER NAVAL RADIOLOGICAL DEFENSE LABORATORY SITE; AND 3) FINAL, FINAL STATUS SURVEY OF SHIP BERTHS 14, 21, 22, AND 29, PARCEL D-1, DATED 1 APRIL 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
    • BRAC PMO WEST
    • 04/26/2019
    • Correspondence
    • Record#: 006248
    • View Record
  • FINAL LANDFILL GAS MONITORING REPORT FOR JANUARY-MARCH 2019, POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JULY TO DECEMBER 2018 (APPENDIX E, PART 2 OF 2) [PUBLIC DOCUMENT]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC2, SITE 00007, SITE 00018, SITE 00026
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JULY TO DECEMBER 2018 (MAIN REPORT AND APPENDICES A THROUGH D) [PUBLIC DOCUMENT]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC2, SITE 00007, SITE 00018, SITE 00026
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JULY TO DECEMBER 2018 (APPENDIX E, PART 1 OF 2) [PUBLIC DOCUMENT]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC2, SITE 00007, SITE 00018, SITE 00026
  • TRANSMITTAL OF FINAL WORK PLAN, PARCEL C, BUILDINGS 211 AND 253, RADIOLOGICAL REMEDIATION, DATED 1 APRIL 2018
    Site(s): PARCEL C
  • TRANSMITTAL OF DRAFT PARCEL G REMOVAL SITE EVALUATION WORK PLAN ADDENDUM, DATED 10 APRIL 2019
    Site(s): PARCEL G
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION COMPLETION REPORT, REMEDIAL ACTION IN PARCEL D-1 PHASE 2, DATED 10 APRIL 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
    • BRAC PMO WEST
    • 04/10/2019
    • Correspondence
    • Record#: 006245
    • View Record
  • TRANSMITTAL OF REPLACEMENT PAGES CONVERTING THE DRAFT FINAL REMEDIAL ACTION WORK PLAN ADDENDUM, PARCEL C REMEDIAL UNITS C1, C2, C4, AND C5 TO FINAL, DATED 3 APRIL 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF DRAFT FINAL REMEDIAL ACTION WORK PLA ADDENDUM, PARCEL C REMEDIAL UNITS C1, C2, C4, AND C5 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF ANNUAL OPERATIONS AND MAINTENANCE SUMMARY REPORT FOR PARCELS B-1, B-2, C, AND G AND SITES 7 AND 18, DATED 19 FEBRUARY 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL C, PARCEL G, SITE 00007, SITE 00018
  • ANNUAL OPERATIONS AND MAINTENANCE SUMMARY REPORT FOR PARCELS B-1, B-2, C, AND G AND SITES 7 AND 18 (PUBLIC DOCUMENT)
    Site(s): PARCEL C, PARCEL G, SITE 00007, SITE 00018
    • INNOVEX - ERRG, JOINT VENTURE
    • 02/19/2019
    • Report
    • Record#: 005983
    • View Record
  • TRANSMITTAL OF TECHNICAL MEMORANDUM ADDITIONAL MONITORING WELL INSTALLATION ACTIVITIES, DATED 1 FEBRUARY 2019
    Site(s): PARCEL E
  • FINAL PARCEL C SOIL VAPOR EXTRACTION, SYSTEM OPERATION AND MAINTENANCE, SUMMARY REPORT (PUBLIC DOCUMENT)
    Site(s): PARCEL C
    • ECC - INSIGHT, LLC
    • 02/06/2019
    • Report
    • Record#: 006045
    • View Record
  • TRANSMITTAL OF FINAL PARCEL C SOIL VAPOR EXTRACTION, SYSTEM OPERATION AND MAINTENANCE, SUMMARY REPORT, DATED 6 FEBRUARY 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • FINAL FEDERAL FACILITIES AGREEMENT SCHEDULE
    Site(s): PARCEL B, PARCEL C, PARCEL D, PARCEL E, PARCEL F, PARCEL G
  • TRANSMITTAL OF FINAL FEDERAL FACILITIES AGREEMENT SCHEDULE, DATED 4 FEBRUARY 2019
    Site(s): PARCEL B, PARCEL C, PARCEL D, PARCEL E, PARCEL F, PARCEL G
    • BRAC PMO WEST
    • 02/04/2019
    • Correspondence
    • Record#: 005978
    • View Record
  • TECHNICAL MEMORANDUM ADDITIONAL MONITORING WELL INSTALLATION ACTIVITIES
    Site(s): PARCEL E
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION WORK PLAN, PARCEL E REMEDIAL ACTION - PHASE 2, DATED 1 JANUARY 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
  • TRANSMITTAL OF FINAL LANDFILL GAS MONITORING REPORT FOR OCTOBER-DECEMBER 2018, POST-REMOVAL ACTION, PARCEL E-2, DATED 1 JANUARY 2019 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF FINAL MONITORING WELL INSTALLATION, DESTRUCTION, REHABILITATION, AND REPAIR WORK PLAN, DATED 3 JANUARY 2019
    Site(s): PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3, SITE 00007, SITE 00018
  • FINAL MONITORING WELL INSTALLATION, DESTRUCTION, REHABILITATION, AND REPAIR WORK PLAN
    Site(s): PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3, SITE 00007, SITE 00018
  • FINAL LANDFILL GAS MONITORING REPORT FOR OCTOBER-DECEMBER 2018, POST-REMOVAL ACTION, PARCEL E-2 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF REPLACEMENT PAGES CONVERTING DRAFT FINAL REMEDIAL ACTION WORK PLAN, FINAL COVER, WETLANDS, AND LANDFILL GAS CONTROL AND CONTAINMENT SYSTEM, REMEDIAL ACTION, PARCEL E-2, DATED 1 SEPTEMBER 2018, TO FINAL (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION WORK PLAN FOR PARCEL E REMEDIAL ACTION, PHASE 1, DATED 1 DECEMBER 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION WORK PLAN FOR PARCEL E REMEDIAL ACTION, PHASE 3, DATED 1 DECEMBER 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
  • FINAL RADIATION PROTECTION PLAN, PARCEL E REMEDIAL ACTION - PHASE 1 AND PHASE 3 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
    • APTIM FEDERAL SERVICES, LLC
    • 12/10/2018
    • Report
    • Record#: 005968
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN, PARCEL E REMEDIAL ACTION - PHASE 3 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
  • FINAL ACCIDENT PREVENTION PLAN, PARCEL E REMEDIAL ACTION - PHASE 1 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
  • FINAL REMEDIAL ACTION WORK PLAN, FINAL COVER, WETLANDS, AND LANDFILL GAS CONTROL AND CONTAINMENT SYSTEM, REMEDIAL ACTION, PARCEL E-2 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF DRAFT SITE CLOSURE REPORT, PETROLEUM HYDROCARBONS, AREA OF CONCERN 28-B, PARCEL C, DATED 1 NOVEMBER 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF REPLACEMENT PAGES CONVERTING FINAL RADIOLOGICAL CHARACTERIZATION SURVEYS WORK PLAN, TO REVISION 1
    Site(s): PARCEL F
  • TRANSMITTAL OF DRAFT FINAL WORK PLAN, PARCEL C BUILDINGS 211 AND 253 RADIOLOGICAL REMEDIATION, DATED 1 APRIL 2018
    Site(s): PARCEL C
  • FINAL REVISON 1 RADIOLOGICAL CHARACTERIZATION SURVEYS WORK PLAN, PARCEL F STRUCTURES
    Site(s): PARCEL F
  • FINAL LAND USE CONTROL REMEDIAL DESIGN PARCEL E (PUBLIC DOCUMENT)
    Site(s): PARCEL E
    • CONSTRUCTION ENGINEERING SERVICES, LLC
    • 11/13/2018
    • Report
    • Record#: 005920
    • View Record
  • TRANSMITTAL OF FINAL LAND USE CONTROL REMEDIAL DESIGN, PARCEL E, DATED 1 NOVEMBER 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
  • TRANSMITTAL OF DRAFT SOIL VAPOR EXTRACTION SYSTEM OPERATION AND MAINTENANCE SUMMARY REPORT, PARCEL C (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF DRAFT FINAL REMOVAL SITE EVALUATION WORK PLAN, PARCEL G, DATED 1 NOVEMBER 2018
    Site(s): PARCEL G
  • TRANSMITTAL OF FINAL SEDIMENT INVESTIGATION BENEATH FORMER PARCELS B AND C PIER AND WHARF STRUCTURES AND BATHYMETRIC SURVEY FOR PARCEL F, DATED 25 OCTOBER 2018
    Site(s): PARCEL B, PARCEL C, PARCEL F
  • FINAL SEDIMENT INVESTIGATION BENEATH FORMER PARCELS B AND C PIER AND WHARF STRUCTURES AND BATHYMETRIC SURVEY FOR PARCEL F
    Site(s): PARCEL B, PARCEL C, PARCEL F
    • ECC - INSIGHT, LLC
    • 10/25/2018
    • Report
    • Record#: 005965
    • View Record
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION MONITORING PLAN, PARCEL E, DATED 1 OCTOBER 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
  • TRANSMITTAL OF FINAL LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2018, POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL, DATED 1 OCTOBER 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF DRAFT MONITORING WELL INSTALLATION, DESTRUCTION, REHABILITATION, AND REPAIR WORK PLAN, DATED 16 OCTOBER 2018
    Site(s): BASEWIDE
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION WORK PLAN ADDENDUM, PARCEL C REMEDIAL UNITS C1, C2, C4, AND C5 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF DRAFT FINAL REMEDIAL ACTION WORK PLAN, FINAL COVER, WETLANDS, AND LANDFILL GAS CONTROL AND CONTAINMENT SYSTEM, REMEDIAL ACTION PARCEL E-2, DATED 1 SEPTEMBER 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • FINAL LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2018, POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JANUARY TO JUNE 2018 (APPENDIX E, PART 1 OF 4) [PUBLIC DOCUMENT]
    Site(s): SITE 00001, SITE 00007, SITE 00018, SITE 00028, SITE 00036, SITE 00039
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JANUARY TO JUNE 2018 (APPENDIX E, PART 2 OF 4) [PUBLIC DOCUMENT]
    Site(s): SITE 00001, SITE 00007, SITE 00018, SITE 00028, SITE 00036, SITE 00039
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JANUARY TO JUNE 2018 (MAIN REPORT AND APPENDICES A THROUGH D) [PUBLIC DOCUMENT]
    Site(s): SITE 00001, SITE 00007, SITE 00018, SITE 00028, SITE 00036, SITE 00039
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JANUARY TO JUNE 2018 (APPENDIX F) [PUBLIC DOCUMENT]
    Site(s): SITE 00001, SITE 00007, SITE 00018, SITE 00028, SITE 00036, SITE 00039
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JANUARY TO JUNE 2018 (APPENDIX E, PART 3 OF 4) [PUBLIC DOCUMENT]
    Site(s): SITE 00001, SITE 00007, SITE 00018, SITE 00028, SITE 00036, SITE 00039
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JANUARY TO JUNE 2018 (APPENDIX E, PART 4 OF 4) [PUBLIC DOCUMENT]
    Site(s): SITE 00001, SITE 00007, SITE 00018, SITE 00028, SITE 00036, SITE 00039
  • TRANSMITTAL OF FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JANUARY TO JUNE 2018, DATED 28 SEPTEMBER 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3, SITE 00007, SITE 00018
  • TRANSMITTAL OF DRAFT FINAL LAND USE CONTROL REMEDIAL DESIGN PARCEL E, DATED 20 SEPTEMBER 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
  • TRANSMITTAL OF DRAFT RECORD OF DECISION, PARCEL F
    Site(s): PARCEL F
  • TRANSMITTAL OF 1) FINAL REMEDIAL ACTION COMPLETION REPORT; AND 2) FINAL OPERATION AND MAINTENANCE PLAN, PARCEL UC-3, DATED 1 JULY 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL UC3
  • TRANSMITTAL OF FINAL LANDFILL GAS MONITORING REPORT FOR APRIL-JUNE 2018, POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL, DATED 1 JULY 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF FINAL ANNUAL LANDFILL CAP OPERATION AND MAINTENANCE REPORT FOR 2017-2018, POST-REMOVAL ACTION, PARCEL E-2, DATED 1 JULY 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF REPLACEMENT PAGES CONVERTING DRAFT FINAL REMEDIAL ACTION WORK PLAN ADDENDUM, REMEDIAL ACTION IN PARCEL D-1, DATED 1 JUNE 2018 TO FINAL (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • TRANSMITTAL OF FINAL OPERATION AND MAINTENANCE PLAN FOR PARCEL B-2, DATED 13 JULY 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL B
  • FINAL OPERATION AND MAINTENANCE PLAN FOR PARCEL B-2 (PUBLIC DOCUMENT)
    Site(s): PARCEL B
    • INNOVEX - ERRG, JOINT VENTURE
    • 07/13/2018
    • Report
    • Record#: 006049
    • View Record
  • FINAL REMEDIAL ACTION WORK PLAN ADDENDUM, REMEDIAL ACTION IN PARCEL D-1 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
    • APTIM FEDERAL SERVICES, LLC
    • 07/12/2018
    • Report
    • Record#: 005973
    • View Record
  • TRANSMITTAL OF DRAFT FOURTH FIVE-YEAR REVIEW, DATED 1 JULY 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
  • TRANSMITTAL OF FINAL RADIOLOGICAL CHARACTERIZATION SURVEYS WORK PLAN, PARCEL F STRUCTURES, DATED 3 JULY 2018
    Site(s): PARCEL F
  • TRANSMITTAL OF DRAFT PARCEL C HISTORIC DISTRICT, RADIOLOGICAL WORK TASKS, REMEDIAL ACTION, AND MAINTENANCE OF REMEDIES TASK - RADIOLOGICAL CHARACTERIZATION OF SANITARY SEWERS AND STORM DRAINS, DATED 9 JULY 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF DRAFT SEDIMENT INVESTIGATION BENEATH FORMER PARCELS B AND C PIER AND WHARF STRUCTURES AND BATHYMETRIC SURVEY FOR PARCEL F, DATED 1 JULY 2018
    Site(s): PARCEL B, PARCEL C, PARCEL F
  • FINAL OPERATION AND MAINTENANCE PLAN, PARCEL UC-3 (PUBLIC DOCUMENT)
    Site(s): PARCEL UC3
  • FINAL LANDFILL GAS MONITORING REPORT FOR APRIL-JUNE 2018, POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • FINAL REMEDIAL ACTION COMPLETION REPORT, PARCEL UC-3 (PUBLIC DOCUMENT)
    Site(s): PARCEL UC3
  • FINAL ANNUAL LANDFILL CAP OPERATION AND MAINTENANCE REPORT FOR 2017-2018, POST-REMOVAL ACTION, PARCEL E-2 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF FINAL REMEDIAL ACTION COMPLETION REPORT, HOT SPOT DELINEATION AND EXCAVATION AND NEARSHORE SLURRY WALL INSTALLATION, REMEDIAL ACTION, PARCEL E-2, DATED 1 JUNE 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2, SITE 00001
  • FINAL ADDENDUM 1 TO THE FINAL PROJECT WORK PLAN PETROLEUM HYDROCARBON CORRECTIVE ACTION IMPLEMENTATION, PARCEL E
    Site(s): PARCEL E
    • AMEC FOSTER WHEELER ENVIRONMENT AND INFRASTRUCTURE, INC.
    • 06/20/2018
    • Report
    • Record#: 005927
    • Request for Record
  • TRANSMITTAL OF FINAL ADDENDUM 1 TO THE FINAL PROJECT WORK PLAN PETROLEUM HYDROCARBON CORRECTIVE ACTION IMPLEMENTATION, PARCEL E, DATED 20 JUNE 2018
    Site(s): PARCEL E
  • TRANSMITTAL OF DRAFT REMOVAL SITE EVALUATION WORK PLAN, PARCEL G, DATED 1 FEBRUARY 2018
    Site(s): PARCEL G
  • TRANSMITTAL OF FINAL REMEDIAL ACTION WORK PLAN, PARCEL D-1, PHASE 2 DURABLE COVER, DATED 14 JUNE 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • TRANSMITTAL OF DRAFT FINAL REMEDIAL ACTION COMPLETION REPORT AND OPERATIONS AND MAINTENANCE PLAN, PARCEL UC-3, DATED 6 JUNE 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL UC3
  • TRANSMITTAL OF 1) FINAL REMOVAL ACTION COMPLETION REPORT, PARCEL D-1, DATED 1 JUNE 2018; 2) FINAL - FINAL STATUS SURVEY OF FORMER NAVAL RADIOLOGICAL DEFENSE LABORATORY SITE, PARCEL D-1; AND 3) FINAL - FINAL STATUS SURVEY OF SHIP BERTHS 14, 21, 22, AND 29, PARCEL D-1 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • FINAL REMEDIAL ACTION COMPLETION REPORT, HOT SPOT DELINEATION AND EXCAVATION AND NEARSHORE SLURRY WALL INSTALLATION, REMEDIAL ACTION, PARCEL E-2 (APPENDIX G, PART 1 OF 2) [PUBLIC DOCUMENT]
    Site(s): PARCEL E2, SITE 00001
  • FINAL REMEDIAL ACTION COMPLETION REPORT, HOT SPOT DELINEATION AND EXCAVATION AND NEARSHORE SLURRY WALL INSTALLATION, REMEDIAL ACTION, PARCEL E-2 (APPENDIX I, PART 1 OF 2) [PUBLIC DOCUMENT]
    Site(s): PARCEL E2, SITE 00001
  • FINAL REMEDIAL ACTION COMPLETION REPORT, HOT SPOT DELINEATION AND EXCAVATION AND NEARSHORE SLURRY WALL INSTALLATION, REMEDIAL ACTION, PARCEL E-2 (APPENDIX O, PART 3 OF 3) [PUBLIC DOCUMENT]
    Site(s): PARCEL E2, SITE 00001
  • FINAL REMEDIAL ACTION COMPLETION REPORT, HOT SPOT DELINEATION AND EXCAVATION AND NEARSHORE SLURRY WALL INSTALLATION, REMEDIAL ACTION, PARCEL E-2 (APPENDIX G, PART 2 OF 2) [PUBLIC DOCUMENT]
    Site(s): PARCEL E2, SITE 00001
  • FINAL REMEDIAL ACTION COMPLETION REPORT, HOT SPOT DELINEATION AND EXCAVATION AND NEARSHORE SLURRY WALL INSTALLATION, REMEDIAL ACTION, PARCEL E-2 (APPENDICES P AND Q) [PUBLIC DOCUMENT]
    Site(s): PARCEL E2, SITE 00001
  • FINAL REMEDIAL ACTION COMPLETION REPORT, HOT SPOT DELINEATION AND EXCAVATION AND NEARSHORE SLURRY WALL INSTALLATION, REMEDIAL ACTION, PARCEL E-2 (APPENDIX O, PART 1 OF 3) [PUBLIC DOCUMENT]
    Site(s): PARCEL E2, SITE 00001
  • FINAL REMEDIAL ACTION COMPLETION REPORT, HOT SPOT DELINEATION AND EXCAVATION AND NEARSHORE SLURRY WALL INSTALLATION, REMEDIAL ACTION, PARCEL E-2 (APPENDIX O, PART 2 OF 3) [PUBLIC DOCUMENT]
    Site(s): PARCEL E2, SITE 00001
  • FINAL REMEDIAL ACTION COMPLETION REPORT, HOT SPOT DELINEATION AND EXCAVATION AND NEARSHORE SLURRY WALL INSTALLATION, REMEDIAL ACTION, PARCEL E-2 (APPENDIX I, PART 2 OF 2) [PUBLIC DOCUMENT]
    Site(s): PARCEL E2, SITE 00001
  • FINAL REMEDIAL ACTION COMPLETION REPORT, HOT SPOT DELINEATION AND EXCAVATION AND NEARSHORE SLURRY WALL INSTALLATION, REMEDIAL ACTION, PARCEL E-2 (APPENDICES J THROUGH N) [PUBLIC DOCUMENT]
    Site(s): PARCEL E2, SITE 00001
  • FINAL REMEDIAL ACTION COMPLETION REPORT, HOT SPOT DELINEATION AND EXCAVATION AND NEARSHORE SLURRY WALL INSTALLATION, REMEDIAL ACTION, PARCEL E-2 (MAIN REPORT, AND APPENDICES A THROUGH F) [PUBLIC DOCUMENT]
    Site(s): PARCEL E2, SITE 00001
  • FINAL REMEDIAL ACTION COMPLETION REPORT, HOT SPOT DELINEATION AND EXCAVATION AND NEARSHORE SLURRY WALL INSTALLATION, REMEDIAL ACTION, PARCEL E-2 (APPENDIX H) [PUBLIC DOCUMENT]
    Site(s): PARCEL E2, SITE 00001
  • TRANSMITTAL OF DRAFT LAND USE CONTROL REMEDIAL DESIGN, PARCEL E, DATED 31 MAY 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
  • FINAL REMEDIAL DESIGN PACKAGE, PARCEL E, DESIGN BASIS REPORT, PRECONSTRUCTION OPERATION AND MAINTENANCE PLAN, CONSTRUCTION QUALITY ASSURANCE PLAN, OPINION OF PROBABLE CONSTRUCTION COST, VOLUMES 1 THROUGH 3 OF 3 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
    • CONSTRUCTION ENGINEERING SERVICES, LLC
    • 05/21/2018
    • Report
    • Record#: 005931
    • View Record
  • TRANSMITTAL OF REPLACEMENT PAGES CONVERTING THE DRAFT FINAL REMEDIAL DESIGN PACKAGE, PARCEL E, DESIGN BASIS REPORT, PRECONSTRUCTION OPERATION AND MAINTENANCE PLAN, CONSTRUCTION QUALITY ASSURANCE PLAN, OPINION OF PROBABLE CONSTRUCTION COST TO FINAL (PUBLIC DOCUMENT)
    Site(s): PARCEL E
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT JULY TO DECEMBER 2017 (APPENDIX E, PART 1 OF 2) [PUBLIC DOCUMENT]
    Site(s): SITE 00001, SITE 00007, SITE 00018, SITE 00028, SITE 00036, SITE 00039
  • TRANSMITTAL OF FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT JULY TO DECEMBER 2017, DATED 16 MAY 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3, SITE 00007, SITE 00018
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT JULY TO DECEMBER 2017 (APPENDIX E, PART 2 OF 2) [PUBLIC DOCUMENT]
    Site(s): SITE 00001, SITE 00007, SITE 00018, SITE 00028, SITE 00036, SITE 00039
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT JULY TO DECEMBER 2017 (MAIN REPORT AND APPENDICES A THROUGH D) [PUBLIC DOCUMENT]
    Site(s): SITE 00001, SITE 00007, SITE 00018, SITE 00028, SITE 00036, SITE 00039
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT JULY TO DECEMBER 2017 (APPENDIX F) [PUBLIC DOCUMENT]
    Site(s): SITE 00001, SITE 00007, SITE 00018, SITE 00028, SITE 00036, SITE 00039
  • TRANSMITTAL OF FINAL DEMONSTRATION OF ACTIVATED CARBON, AMENDMENTS TO REDUCE POLYCHLORINATED BIPHENYL (PCB) BIOAVAILABILITY, DATED 1 MAY 2018
    Site(s): PARCEL F
  • FINAL DEMONSTRATION OF ACTIVATED CARBON, AMENDMENTS TO REDUCE POLYCHLORINATED BIPHENYL (PCB) BIOAVAILABILITY
    Site(s): PARCEL F
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 05/01/2018
    • Report
    • Record#: 006065
    • View Record
  • FACT SHEET - COMPLETION OF PHASE I REMEDIAL ACTION AT PARCEL D-1 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
    • APTIM FEDERAL SERVICES, LLC
    • 05/01/2018
    • Fact Sheet
    • Record#: 006033
    • View Record
  • TRANSMITTAL OF FINAL REMEDIAL ACTION COMPLETION REPORT, REMEDIAL ACTION IN PARCEL D-1, PHASE 1, DATED 27 APRIL 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • FINAL REMEDIAL ACTION COMPLETION REPORT, REMEDIAL ACTION IN PARCEL D-1, PHASE 1 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
    • APTIM FEDERAL SERVICES, LLC
    • 04/27/2018
    • Report
    • Record#: 005929
    • View Record
  • TRANSMITTAL OF DRAFT WORK PLAN, PARCEL C BUILDINGS 211 AND 253 RADIOLOGICAL REMEDIATION, DATED 1 APRIL 2018
    Site(s): PARCEL C
  • FINAL REMEDIAL ACTION COMPLETION REPORT FOR THE DURABLE COVERS REMEDY IN PARCEL B-2 (APPENDIX G, PART 3 OF 5) [PUBLIC DOCUMENT]
    Site(s): SITE 00024, SITE 00026
    • INNOVEX - ERRG, JOINT VENTURE
    • 04/06/2018
    • Report
    • Record#: 006131
    • View Record
  • FINAL REMEDIAL ACTION COMPLETION REPORT FOR THE DURABLE COVERS REMEDY IN PARCEL B-2 (MAIN REPORT AND APPENDICES A THROUGH F) [PUBLIC DOCUMENT]
    Site(s): SITE 00024, SITE 00026
    • INNOVEX - ERRG, JOINT VENTURE
    • 04/06/2018
    • Report
    • Record#: 006128
    • View Record
  • FINAL REMEDIAL ACTION COMPLETION REPORT FOR THE DURABLE COVERS REMEDY IN PARCEL B-2 (APPENDIX H, PART 5 OF 5) [PUBLIC DOCUMENT]
    Site(s): SITE 00024, SITE 00026
    • INNOVEX - ERRG, JOINT VENTURE
    • 04/06/2018
    • Report
    • Record#: 006138
    • View Record
  • TRANSMITTAL OF FINAL LANDFILL GAS MONITORING REPORT FOR JANUARY-MARCH 2018, POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL, DATED 1 APRIL 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • FINAL REMEDIAL ACTION COMPLETION REPORT FOR THE DURABLE COVERS REMEDY IN PARCEL B-2 (APPENDIX H, PART 3 OF 5) [PUBLIC DOCUMENT]
    Site(s): SITE 00024, SITE 00026
    • INNOVEX - ERRG, JOINT VENTURE
    • 04/06/2018
    • Report
    • Record#: 006136
    • View Record
  • FINAL REMEDIAL ACTION COMPLETION REPORT FOR THE DURABLE COVERS REMEDY IN PARCEL B-2 (APPENDIX I) [PUBLIC DOCUMENT]
    Site(s): SITE 00024, SITE 00026
    • INNOVEX - ERRG, JOINT VENTURE
    • 04/06/2018
    • Report
    • Record#: 006139
    • View Record
  • FINAL REMEDIAL ACTION COMPLETION REPORT FOR THE DURABLE COVERS REMEDY IN PARCEL B-2 (APPENDIX H, PART 4 OF 5) [PUBLIC DOCUMENT]
    Site(s): SITE 00024, SITE 00026
  • FINAL REMEDIAL ACTION COMPLETION REPORT FOR THE DURABLE COVERS REMEDY IN PARCEL B-2 (APPENDIX H, PART 1 OF 5) [PUBLIC DOCUMENT]
    Site(s): SITE 00024, SITE 00026
    • INNOVEX - ERRG, JOINT VENTURE
    • 04/06/2018
    • Report
    • Record#: 006134
    • View Record
  • TRANSMITTAL OF REPLACEMENT PAGES CONVERTING THE DRAFT FINAL REMEDIAL ACTION COMPLETION REPORT FOR THE DURABLE COVERS REMEDY IN PARCEL B-2 TO FINAL, DATED 6 APRIL 2018 (PUBLIC DOCUMENT)
    Site(s): SITE 00024, SITE 00026
  • FINAL REMEDIAL ACTION COMPLETION REPORT FOR THE DURABLE COVERS REMEDY IN PARCEL B-2 (APPENDIX H, PART 2 OF 5) [PUBLIC DOCUMENT]
    Site(s): SITE 00024, SITE 00026
    • INNOVEX - ERRG, JOINT VENTURE
    • 04/06/2018
    • Report
    • Record#: 006135
    • View Record
  • FINAL REMEDIAL ACTION COMPLETION REPORT FOR THE DURABLE COVERS REMEDY IN PARCEL B-2 (APPENDIX G, PART 4 OF 5) [PUBLIC DOCUMENT]
    Site(s): SITE 00024, SITE 00026
    • INNOVEX - ERRG, JOINT VENTURE
    • 04/06/2018
    • Report
    • Record#: 006132
    • View Record
  • FINAL REMEDIAL ACTION COMPLETION REPORT FOR THE DURABLE COVERS REMEDY IN PARCEL B-2 (APPENDIX G, PART 1 OF 5) [PUBLIC DOCUMENT]
    Site(s): SITE 00024, SITE 00026
    • INNOVEX - ERRG, JOINT VENTURE
    • 04/06/2018
    • Report
    • Record#: 006129
    • View Record
  • FINAL REMEDIAL ACTION COMPLETION REPORT FOR THE DURABLE COVERS REMEDY IN PARCEL B-2 (APPENDIX G, PART 5 OF 5) [PUBLIC DOCUMENT]
    Site(s): SITE 00024, SITE 00026
    • INNOVEX - ERRG, JOINT VENTURE
    • 04/06/2018
    • Report
    • Record#: 006133
    • View Record
  • FINAL REMEDIAL ACTION COMPLETION REPORT FOR THE DURABLE COVERS REMEDY IN PARCEL B-2 (APPENDIX G, PART 2 OF 5) [PUBLIC DOCUMENT]
    Site(s): SITE 00024, SITE 00026
    • INNOVEX - ERRG, JOINT VENTURE
    • 04/06/2018
    • Report
    • Record#: 006130
    • View Record
  • TRANSMITTAL OF DRAFT OPERATION AND MAINTENANCE PLAN FOR PARCEL B-2, DATED 1 APRIL 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL B
  • TRANSMITTAL OF ANNUAL OPERATION AND MAINTENANCE SUMMARY REPORT DURABLE COVER, PARCEL D-1 PHASE 1, DATED 2 APRIL 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • ANNUAL OPERATION AND MAINTENANCE SUMMARY REPORT DURABLE COVER, PARCEL D-1 PHASE 1 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
    • APTIM FEDERAL SERVICES, LLC
    • 04/02/2018
    • Report
    • Record#: 005891
    • View Record
  • FINAL LANDFILL GAS MONITORING REPORT FOR JANUARY-MARCH 2018, POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • FINAL PARCEL F PROPOSED PLAN FOR OFFSHORE SEDIMENT CLEANUP
    Site(s): PARCEL F, SITE 00078
    • ECC - INSIGHT, LLC
    • 04/01/2018
    • Report
    • Record#: 005876
    • View Record
  • TRANSMITTAL OF DRAFT FINAL REMEDIAL DESIGN PACKAGE, PARCEL E, DESIGN BASIS REPORT, PRECONSTRUCTION OPERATION AND MAINTENANCE PLAN, CONSTRUCTION QUALITY ASSURANCE PLAN, OPINION OF PROBABLE CONSTRUCTION COST, DATED 30 MARCH 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
  • TRANSMITTAL OF DRAFT FINAL REMEDIAL ACTION COMPLETION REPORT, REMEDIAL ACTION IN PARCEL D-1, DATED 28 MARCH 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • TRANSMITTAL OF REPLACEMENT PAGES CONVERTING THE DRAFT INTERIM REMEDIAL ACTION COMPLETION REPORT, PARCEL C REMEDIAL ACTION, REMEDIAL UNITS C1, C4, AND C5, AND BUILDING 241, EXCLUDES C2, DATED 12 FEBRUARY 2018, TO FINAL (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF DRAFT FINAL REMEDIAL ACTION COMPLETION REPORT HOT SPOT DELINEATION AND EXCAVATION, AND NEARSHORE SLURRY WALL INSTALLATION REMEDIAL ACTION, PARCEL E-2, DATED 1 MARCH 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF FINAL POST-CONSTRUCTION OPERATION AND MAINTENANCE PLAN, REMEDIAL ACTION IN PARCEL D-1, DATED 14 MARCH 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • FINAL POST-CONSTRUCTION OPERATION AND MAINTENANCE PLAN, REMEDIAL ACTION IN PARCEL D-1 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
    • APTIM FEDERAL SERVICES, LLC
    • 03/14/2018
    • Report
    • Record#: 005895
    • View Record
  • TRANSMITTAL OF 1) REPLACEMENT PAGES FOR FINAL REMEDIAL ACTIN COMPLETION REPORT, PARCEL B-1, DATED 23 JANUARY 2017; 2) INSTRUCTIONS FOR CHANGE PAGES; AND 3) REPLACEMENT CD (PUBLIC DOCUMENT)
    Site(s): PARCEL B
  • ACCIDENT PREVENTION PLAN AMENDMENT SHORELINE REVETMENT, SITE GRADING AND CONSOLIDATION OF EXCAVATED SOIL, SEDIMENT, AND DEBRIS; AND UPLAND SLURRY WALL INSTALLATION; REMEDIAL ACTION, PARCEL E-2 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF DRAFT FINAL POST CONSTRUCTION OPERATION AND MAINTENANCE PLAN, REMEDIAL ACTION IN PARCEL D-1, DATED 6 MARCH 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • TRANSMITTAL OF DRAFT RADIOLOGICAL CHARACTERIZATION SURVEYS WORK PLAN, PARCEL F STRUCTURES, DATED 27 FEBRUARY 2018
    Site(s): PARCEL F
  • TRANSMITTAL OF DRAFT FINAL REMEDIAL ACTION COMPLETION REPORT FOR THE DURABLE COVERS REMEDY IN PARCEL B-2, DATED 1 FEBRUARY 2018 (PUBLIC DOCUMENT)
    Site(s): SITE 00024, SITE 00026
  • TRANSMITTAL OF DRAFT WORK PLAN FOR RADIOLOGICAL SURVEY AND SAMPLING, DATED 1 FEBRUARY 2018
    Site(s): PARCEL G
    • BRAC PMO WEST
    • 02/21/2018
    • Correspondence
    • Record#: 006219
    • View Record
  • TRANSMITTAL OF 1) DRAFT FINAL PROPOSED PLAN FOR OFFSHORE SEDIMENT CLEANUP, PARCEL F; AND 2) RESPONSE TO COMMENTS FROM BASE REALIGNMENT AND CLOSURE (BRAC) CLEANUP TEAM (BCT) ON DRAFT PROPOSED PLAN, DATED 1 NOVEMBER 2017
    Site(s): PARCEL F
  • TRANSMITTAL OF DRAFT WORK PLAN FOR FINAL COVER, WETLANDS, AND LANDFILL GAS CONTROL AND TREATMENT SYSTEM REMEDIAL ACTION, PARCEL E-2, DATED 1 FEBRUARY 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-2
  • TRANSMITTAL OF DRAFT DEMONSTRATION OF ACTIVATED CARBON AMENDMENTS TO REDUCE POLYCHLORINATED BIPHENYL (PCB) BIOAVAILABILITY, DATED 1 FEBRUARY 2018
    Site(s): BASEWIDE
  • TRANSMITTAL OF ANNUAL OPERATION AND MAINTENANCE SUMMARY REPORT FOR PARCELS B-1, B-2, C, AND G AND SITES 7 AND 18, DATED 25 JANUARY 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL C, PARCEL G, SITE 00007, SITE 00018
    • BRAC PMO WEST
    • 01/26/2018
    • Correspondence
    • Record#: 005906
    • View Record
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION WORK PLAN ADDENDUM, REMEDIAL ACTION IN PARCEL D-1, DATED 26 JANUARY 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • FINAL FEDERAL FACILITIES AGREEMENT SCHEDULE
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC3
  • ANNUAL OPERATION AND MAINTENANCE SUMMARY REPORT FOR PARCELS B-1, B-2, C, AND G AND SITES 7 AND 18 (PUBLIC DOCUMENT)
    Site(s): PARCEL C, PARCEL G, SITE 00007, SITE 00018
    • INNOVEX - ERRG, JOINT VENTURE
    • 01/25/2018
    • Report
    • Record#: 005907
    • View Record
  • TRANSMITTAL OF FINAL FEDERAL FACILITIES AGREEMENT SCHEDULE, DATED 25 JANUARY 2018
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC3
    • BRAC PMO WEST
    • 01/23/2018
    • Correspondence
    • Record#: 005884
    • View Record
  • TRANSMITTAL OF FINAL LANDFILL GAS MONITORING REPORT FOR OCTOBER-DECEMBER 2017, POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL, DATED 11 JANUARY 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF DRAFT OPERATION AND MAINTENANCE PLAN, REMEDIAL ACTION, PARCEL UC-3 (PUBLIC DOCUMENT)
    Site(s): PARCEL UC3
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION COMPLETION REPORT, REMEDIAL ACTION IN PARCEL D, DATED 16 JANUARY 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • TRANSMITTAL OF DRAFT FINAL INTERIM REMEDIAL ACTION COMPLETION REPORT, PARCEL C REMEDIAL UNITS C1, C4, AND C5, AND BUILDING 241, DATED 12 FEBRUARY 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF DRAFT POST-CONSTRUCTION OPERATION AND MAINTENANCE PLAN, REMEDIAL ACTION IN PARCEL D-1, DATED 12 JANUARY 2018 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • FINAL LANDFILL GAS MONITORING REPORT FOR OCTOBER-DECEMBER 2017, POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JANUARY TO JUNE 2017 (APPENDIX C, PART 1 OF 2) [PUBLIC DOCUMENT]
    Site(s): SITE 00007, SITE 00018, SITE 00026
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JANUARY TO JUNE 2017 (APPENDIX C, PART 2 OF 2) [PUBLIC DOCUMENT]
    Site(s): SITE 00007, SITE 00018, SITE 00026
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JANUARY TO JUNE 2017 (MAIN REPORT, APPENDICES A AND B) [PUBLIC DOCUMENT]
    Site(s): SITE 00007, SITE 00018, SITE 00026
  • FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JANUARY TO JUNE 2017 (APPENDICES D AND E) [PUBLIC DOCUMENT]
    Site(s): SITE 00007, SITE 00018, SITE 00026
  • TRANSMITTAL OF FINAL SEMIANNUAL GROUNDWATER MONITORING REPORT, JANUARY TO JUNE 2017, DATED 15 DECEMBER 2017 (PUBLIC DOCUMENT)
    Site(s): SITE 00007, SITE 00018, SITE 00026
  • FINAL WORK PLAN SEDIMENT INVESTIGATION AND BATHYMETRIC SURVEY FOR PARCEL F
    Site(s): PARCEL F
  • TRANSMITTAL OF REVISED DRAFT REMEDIAL DESIGN PACKAGE, PARCEL E, DESIGN BASIS REPORT, PRECONSTRUCTION OPERATION AND MAINTENANCE PLAN, CONSTRUCTION QUALITY ASSURANCE PLAN, OPINION OF PROBABLE CONSTRUCTION COST, DATED 15 NOVEMBER 2017 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
  • FINAL ACCIDENT PREVENTION PLAN RADIOLOGICAL WORK TASKS REMEDIAL ACTION AND MAINTENANCE OF REMEDIES (PUBLIC DOCUMENT)
    Site(s): PARCEL C, PARCEL D-1, PARCEL F
  • FINAL REMEDIAL ACTION WORK PLAN, PARCEL C REMEDIAL UNITS C1, C2, C4, AND C5 (PUBLIC DOCUMENT)
    Site(s): SITE 00028
    • ECC - INSIGHT, LLC
    • 11/06/2017
    • Report
    • Record#: 005877
    • View Record
  • FINAL RADIATION PROTECTION PLAN, RADIOLOGICAL WORK TASKS, REMEDIAL ACTION AND MAINTENANCE OF REMEDIES
    Site(s): BASEWIDE
    • APTIM FEDERAL SERVICES, LLC
    • 10/23/2017
    • Report
    • Record#: 005860
    • View Record
  • FINAL WORK PLAN BASEWIDE RADIOLOGICAL SUPPORT
    Site(s): PARCEL E, SITE 00002, SITE 00003, SITE 00012
  • TRANSMITTAL OF LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2017 POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL, DATED 9 OCTOBER 2017 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2, SITE 00001
  • LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2017 POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL (PUBLIC DOCUMENT)
    Site(s): PARCEL E2, SITE 00001
  • AMENDMENT 1 TO THE FINAL ACCIDENT PREVENTION PLAN/SITE SAFETY AND HEALTH PLAN, REMEDIAL ACTION IN PARCEL D-1, REVISION 3 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • TRANSMITTAL OF FINAL TECHNICAL MEMORANDUM OPTIMIZED REMEDIAL ALTERNATIVE FOR PARCEL F, DATED 1 SEPTEMBER 2017
    Site(s): PARCEL F
  • FINAL TECHNICAL MEMORANDUM OPTIMIZED REMEDIAL ALTERNATIVE FOR PARCEL F (PUBLIC DOCUMENT)
    Site(s): PARCEL F
    • ECC - INSIGHT, LLC
    • 09/01/2017
    • Report
    • Record#: 005828
    • View Record
  • AMENDMENT 1 TO THE FINAL ACCIDENT PREVENTION PLAN/SITE SAFETY AND HEALTH PLAN, REMEDIAL ACTION IN PARCEL D-1, REVISION 2 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • AMENDMENT 1 TO THE FINAL ACCIDENT PREVENTION PLAN/SITE SAFETY AND HEALTH PLAN, REMEDIAL ACTION IN PARCEL D-1, REVISION 1 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • TRANSMITTAL OF FINAL LANDFILL GAS MONITORING REPORT FOR APRIL-JUNE 2017 POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL, DATED 17 JULY 2017 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF ANNUAL LANDFILL CAP OPERATION AND MAINTENANCE REPORT FOR 2016-2017, PARCEL E-2, INDUSTRIAL LANDFILL, DATED 20 JULY 2017 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • ANNUAL LANDFILL CAP OPERATION AND MAINTENANCE REPORT FOR 2016-2017, PARCEL E-2, INDUSTRIAL LANDFILL (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • FINAL LANDFILL GAS MONITORING REPORT FOR APRIL-JUNE 2017 POST-REMOVAL ACTION, PARCEL E-2, INDUSTRIAL LANDFILL (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF FINAL CONSTRUCTION SUMMARY REPORT PARCEL C PHASE 3 CHARACTERIZATION STUDY PERFORMED ON STORM DRAIN AND SANITARY SEWER LINES LOCATED WITHIN THE 10-FOOT BUFFER ZONE OF BUILDINGS 204, 205, 207, AND 208, DATED 1 JUNE 2017
    Site(s): PARCEL C
  • FINAL CONSTRUCTION SUMMARY REPORT PARCEL C PHASE 3 CHARACTERIZATION STUDY PERFORMED ON STORM DRAIN AND SANITARY SEWER LINES LOCATED WITHIN THE 10-FOOT BUFFER ZONE OF BUILDINGS 204, 205, 207, AND 208
    Site(s): PARCEL C
    • TETRA TECH EC, INC.
    • 06/01/2017
    • Report
    • Record#: 005756
    • View Record
  • TRANSMITTAL OF DRAFT TECHNICAL MEMORANDUM OPTIMIZED REMEDIAL ALTERNATIVE FOR PARCEL F, DATED 01 MAY 2017
    Site(s): PARCEL F
  • TRANSMITTAL OF EXPLANATION OF SIGNIFICANT DIFFERENCES TO THE FINAL RECORD OF DECISION FOR PARCEL G, DATED 18 APRIL 2017
    Site(s): PARCEL G
  • EXPLANATION OF SIGNIFICANT DIFFERENCES TO THE FINAL RECORD OF DECISION FOR PARCEL G
    Site(s): PARCEL G
    • LANGAN ENGINEERING AND ENVIRONMENTAL SERVICES, INC.
    • 04/18/2017
    • Report
    • Record#: 005752
    • View Record
  • FINAL MANAGEMENT AND MONITORING APPROACH SAMPLING AND ANALYSIS PLAN FOR BASEWIDE GROUNDWATER MONITORING PROGRAM (PUBLIC DOCUMENT)
    Site(s): PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
  • TRANSMITTAL OF FINAL FEDERAL FACILITIES AGREEMENT SCHEDULE, DATED 15 MARCH 2017 (ENCLOSURE IS RECORD # 5740)
    Site(s): PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL F, PARCEL UC3
    • BRAC PMO WEST
    • 03/16/2017
    • Correspondence
    • Record#: 005739
    • View Record
  • FINAL FEDERAL FACILITIES AGREEMENT SCHEDULE (CD COPY ENCLOSED) [SEE RECORD # 5739 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL F, PARCEL UC3
    • NOREAS ENVIRONMENTAL ENGINEERING AND SCIENCE
    • 03/15/2017
    • Report
    • Record#: 005740
    • View Record
  • TRANSMITTAL OF FINAL OCTOBER TO DECEMBER 2000 FIFTH QUARTERLY GROUNDWATER SAMPLING REPORT, DATED 2 FEBRUARY 2001
    Site(s): PARCEL B
    • NAVFAC - SOUTHWEST DIVISION
    • 03/02/2017
    • Correspondence
    • Record#: 005804
    • View Record
  • TRANSMITTAL OF THE FINAL ADDENDUM TO THE FEASIBILITY STUDY REPORT (ENCLOSURE IS RECORD # 5623)
    Site(s): PARCEL F
  • FINAL ADDENDUM TO THE FEASIBILITY STUDY REPORT (CD COPY ENCLOSED) [SEE RECORD # 5622 - BRAC PMO WEST TRANSMITTAL LETTER; AND RECORD # 1340 - FINAL FEASIBILITY STUDY REPORT]
    Site(s): PARCEL F
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/01/2017
    • Report
    • Record#: 005623
    • View Record
  • TRANSMITTAL OF THE FINAL WORK PLAN, PETROLEUM HYDROCARBON INVESTIGATION AND/OR CORRECTIVE ACTION (ENCLOSURE IS RECORD # 5625)
    Site(s): AOC 000006A, AOC 000024C, AOC 000027A, AOC 000028H, AOC 000046A, AOC 000046B, AOC 000049A, PARCEL C, SITE 00007, SITE 00018
  • FINAL WORK PLAN, PETROLEUM HYDROCARBON INVESTIGATION AND/OR CORRECTIVE ACTION (INCLUDES FINAL SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN), PETROLEUM HYDROCARBON INVESTIGATION AND CORRECTIVE ACTION, **SEE COMMENTS**
    Site(s): AOC 000006A, AOC 000024C, AOC 000027A, AOC 000028H, AOC 000046A, AOC 000046B, AOC 000049A, PARCEL C, SITE 00007, SITE 00018
    • AMEC FOSTER WHEELER ENVIRONMENT AND INFRASTRUCTURE, INC.
    • 11/18/2016
    • Report
    • Record#: 005625
    • Request for Record
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR JULY - SEPTEMBER 2016, POST REMOVAL ACTION (ENCLOSURE IS RECORD # 5620)
    Site(s): PARCEL E2, SITE 00001, SITE 00021
  • LANDFILL GAS MONITORING REPORT FOR JULY - SEPTEMBER 2016, POST REMOVAL ACTION (CD COPY ENCLOSED) [SEE RECORD # 5619 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2, SITE 00001, SITE 00021
  • FINAL WELL SEARCHES AROUND BASES WITH POTENTIAL PERFLUOROALKYL SUBSTANCE SITES AT VARIOUS BASE REALIGNMENT AND CLOSURE (BRAC) INSTALLATIONS
    Site(s): SITE 00009, SITE 00010
  • TRANSMITTAL OF DRAFT FINAL ADDENDUM TO THE FEASIBILITY STUDY REPORT FOR PARCEL F, DATED 1 AUGUST 2016 (ENCLOSURE IS RECORD # 5732)
    Site(s): PARCEL F
  • TRANSMITTAL OF TECHNICAL MEMORANDUM DEMONSTRATION OF ACTIVATED CARBON AMENDMENTS, SUMMARY OF FIELD ACTIVITIES, DATED 10 AUGUST 2016
    Site(s): PARCEL E2, PARCEL F
  • TECHNICAL MEMORANDUM DEMONSTRATION OF ACTIVATED CARBON AMENDMENTS, SUMMARY OF FIELD ACTIVITIES
    Site(s): PARCEL E2, PARCEL F
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 08/10/2016
    • Report
    • Record#: 005899
    • View Record
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR APRIL - JUNE 2016, POST REMOVAL ACTION (ENCLOSURE IS RECORD # 5529)
    Site(s): PARCEL E2
  • LANDFILL GAS MONITORING REPORT FOR APRIL - JUNE 2016, POST REMOVAL ACTION (CD COPY ENCLOSED) [SEE RECORD # 5528 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2
  • TRANSMITTAL OF THE FINAL FEDERAL FACILITIES AGREEMENT SCHEDULE (ENCLOSURE IS RECORD # 5527)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, SITE 00026
    • BRAC PMO WEST
    • 04/29/2016
    • Correspondence
    • Record#: 005526
    • View Record
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR JANUARY - MARCH 2016, POST REMOVAL ACTION (ENCLOSURE IS RECORD # 5550)
    Site(s): PARCEL E2
  • LANDFILL GAS MONITORING REPORT FOR JANUARY - MARCH 2016, POST REMOVAL ACTION (CD COPY ENCLOSED) [SEE RECORD # 5549 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2
  • FINAL FEDERAL FACILITIES AGREEMENT SCHEDULE (CD COPY ENCLOSED) [SEE RECORD # 5526 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, SITE 00026
    • NOREAS ENVIRONMENTAL ENGINEERING AND SCIENCE
    • 04/01/2016
    • Report
    • Record#: 005527
    • View Record
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR OCTOBER - DECEMBER 2015, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 5422)
    Site(s): PARCEL E2
  • TRANSMITTAL OF DRAFT ADDENDUM TO THE FEASIBILITY STUDY REPORT FOR PARCEL F, DATED 01 JANUARY 2016
    Site(s): PARCEL F
  • FINAL WORK PLAN, BASEWIDE RADIOLOGICAL SUPPORT
    Site(s): BASEWIDE
  • FINAL WORK PLAN ADDENDUM 1, PARCEL C REMEDIAL ACTION, REMEDIAL UNITS C1, C4 AND C5, AND BUILDING 241 (EXCLUDES C2) [PUBLIC DOCUMENT]
    Site(s): PARCEL C
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2015 POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 5439)
    Site(s): PARCEL E2
  • LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2015 POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (SEE RECORD # 5438 - BRAC PMO WEST TRANSMITTAL LETTER)
    Site(s): PARCEL E2
  • FINAL FACT SHEET - MERCURY EVALUATION AT PARCEL B-2
    Site(s): SITE 00026
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 09/01/2015
    • Fact Sheet
    • Record#: 006028
    • View Record
  • FINAL FACT SHEET - CLEANUP AT PARCELS B-1 AND B-2
    Site(s): SITE 00026
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 09/01/2015
    • Fact Sheet
    • Record#: 006029
    • View Record
  • FINAL FACT SHEET - ANNUAL UPDATE OF CLEANUP ACHIEVEMENTS
    Site(s): PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 09/01/2015
    • Fact Sheet
    • Record#: 006026
    • View Record
  • FINAL TECHNICAL MEMORANDUM GROUNDWATER AND SOIL VAPOR CHARACTERIZATION IN SUPPORT OF REMEDIAL ACTION REMEDIAL UNIT C5 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
    • CB AND I FEDERAL SERVICES, LLC
    • 08/20/2015
    • Report
    • Record#: 005445
    • View Record
  • TRANSMITTAL OF THE FINAL WORK PLAN, BASEWIDE RADIOLOGICAL SUPPORT (ENCLOSURE IS RECORD # 5396)
    Site(s): BASEWIDE
  • FINAL WORK PLAN, BASEWIDE RADIOLOGICAL SUPPORT (CD COPY ENCLOSED) [SEE RECORD # 5395 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): BASEWIDE
    • TETRA TECH EC, INC.
    • 08/01/2015
    • Report
    • Record#: 005396
    • View Record
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR APRIL - JUNE 2015, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 5378)
    Site(s): PARCEL E2
  • LANDFILL GAS MONITORING REPORT FOR APRIL - JUNE 2015, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 5377 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2
  • LANDFILL GAS MONITORING REPORT FOR OCTOBER - DECEMBER 2015, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 5421 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2
  • FACT SHEET - UPDATE ON CLEANUP ACHIEVEMENTS, MAY AND JUNE 2015
    Site(s): PARCEL C, PARCEL E, PARCEL E2, PARCEL G
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 07/01/2015
    • Fact Sheet
    • Record#: 006009
    • View Record
  • FINAL NONAQUEOUS PHASE LIQUID TREATMENT PILOT STUDY WORK PLAN ADDENDUM, FORMER OILY WASTE PONDS (CD COPY ENCLOSED) [SEE RECORD # 4952 - FINAL NONAQUEOUS PHASE LIQUID TREATMENT PILOT STUDY WORK PLAN, FORMER OILY WASTE PONDS]
    Site(s): PARCEL E, SITE 00003
    • CABRERA - INSIGHT, JOINT VENTURE
    • 06/03/2015
    • Report
    • Record#: 005408
    • View Record
  • FINAL FACT SHEET - ACTIVATED CARBON PILOT STUDY
    Site(s): PARCEL F
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 06/01/2015
    • Fact Sheet
    • Record#: 006027
    • View Record
  • FACT SHEET - UPDATE ON CLEANUP ACHIEVEMENTS, JANUARY 2015 - APRIL 2015
    Site(s): PARCEL E2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 06/01/2015
    • Fact Sheet
    • Record#: 006008
    • View Record
  • TRANSMITTAL OF DRAFT TECHNICAL MEMORANDUM GROUNDWATER AND SOIL VAPOR CHARACTERIZATION IN SUPPORT OF PARCEL C REMEDIAL ACTION REMEDIAL UNIT C5, DATED 1 MAY 2015 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF THE FINAL WORK PLAN FOR THE DEMONSTRATION OF ACTIVATED CARBON AMENDMENTS (ENCLOSURE IS RECORD # 5383)
    Site(s): PARCEL F
  • TRANSMITTAL OF THE FINAL SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN) ACTIVATED CARBON AMENDMENTS PILOT STUDY MONITORING (ENCLOSURE IS RECORD # 5355)
    Site(s): PARCEL F
  • FINAL WORK PLAN FOR THE DEMONSTRATION OF ACTIVATED CARBON AMENDMENTS (CD COPY ENCLOSED) [SEE RECORD # 5382 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL F
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 05/01/2015
    • Report
    • Record#: 005383
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN, ACTIVATED CARBON AMENDMENTS PILOT STUDY MONITORING (CD COPY ENCLOSED)
    Site(s): PARCEL F
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/30/2015
    • Report
    • Record#: 005351
    • View Record
  • FINAL SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN) ACTIVATED CARBON AMENDMENTS PILOT STUDY MONITORING (CD COPY ENCLOSED) [SEE RECORD # 5354 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL F
  • LANDFILL GAS MONITORING REPORT FOR JANUARY - MARCH 2015, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 5318 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2, SITE 00001, SITE 00021
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR JANUARY - MARCH 2015, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 5319)
    Site(s): PARCEL E2, SITE 00001, SITE 00021
  • TRANSMITTAL OF FINAL PROJECT WORK PLAN PETROLEUM HYDROCARBON CORRECTIVE ACTION IMPLEMENTATION, PARCEL E, DATED 1 APRIL 2015
    Site(s): AOC 000002A, AOC 000008A, AOC 000036B, AOC 000056A, AOC 000056B, PARCEL E
  • FINAL FACT SHEET - EXTENT OF RADIOLOGICAL CLEANUP
    Site(s): SITE 00001/21, SITE 00002, SITE 00007, SITE 00018
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2015
    • Fact Sheet
    • Record#: 006017
    • View Record
  • FINAL PROJECT WORK PLAN PETROLEUM HYDROCARBON CORRECTIVE ACTION IMPLEMENTATION, PARCEL E
    Site(s): AOC 000002A, AOC 000008A, AOC 000036B, AOC 000056A, AOC 000056B, PARCEL E
  • FINAL FACT SHEET - LOCATIONS OF RADIATION
    Site(s): BASEWIDE
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2015
    • Fact Sheet
    • Record#: 006015
    • View Record
  • FINAL FACT SHEET - RADIOLOGICAL CLEANUP ACHIEVEMENTS
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2015
    • Fact Sheet
    • Record#: 006018
    • View Record
  • FINAL FACT SHEET - RADIOLOGICAL CLEANUP PROCESS
    Site(s): BASEWIDE
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2015
    • Fact Sheet
    • Record#: 006016
    • View Record
  • FACT SHEET - UNDERSTANDING RADIATION
    Site(s): BASEWIDE
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2015
    • Fact Sheet
    • Record#: 006013
    • View Record
  • FINAL FACT SHEET - RADIATION SOURCES
    Site(s): BASEWIDE
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2015
    • Fact Sheet
    • Record#: 006014
    • View Record
  • CONCURRENCE WITH OPERATION MAINTENANCE PLAN AMENDMENT FOR PARCELS G, UC-1, AND UC-2, DATED 18 MARCH 2015 (PUBLIC DOCUMENT)
    Site(s): PARCEL G, PARCEL UC1, PARCEL UC2
    • DTSC - BERKELEY, CA
    • 04/01/2015
    • Correspondence
    • Record#: 005975
    • View Record
  • FACT SHEET - MORE INFORMATION ON RADIATION
    Site(s): BASEWIDE
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2015
    • Fact Sheet
    • Record#: 006012
    • View Record
  • FINAL FACT SHEET - RADIATION MANAGEMENT AND DISPOSAL
    Site(s): BASEWIDE
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2015
    • Fact Sheet
    • Record#: 006019
    • View Record
  • FINAL FACT SHEET - PROTECTING THE PUBLIC
    Site(s): BASEWIDE
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2015
    • Fact Sheet
    • Record#: 006020
    • View Record
  • PUBLIC NOTICE - NOTICE OF 2015 COMMUNITY EVENTS CALENDAR
    Site(s): BASEWIDE
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2015
    • Public Notice
    • Record#: 006007
    • View Record
  • FACT SHEET - UPDATE ON CLEANUP ACHIEVEMENTS, OCTOBER 2014 - DECEMBER 2014
    Site(s): PARCEL C, PARCEL E
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 03/01/2015
    • Fact Sheet
    • Record#: 006006
    • View Record
  • TRANSMITTAL OF THE FINAL FEDERAL FACILITY AGREEMENT SCHEDULE FOR FISCAL YEAR 2015 (ENCLOSURE IS RECORD # 5300)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL F, PARCEL UC3, SITE 00002, SITE 00003, SITE 00012, SITE 00026
    • BRAC PMO WEST
    • 02/18/2015
    • Correspondence
    • Record#: 005299
    • View Record
  • TRANSMITTAL OF THE DRAFT NONAQUEOUS PHASE LIQUID TREATMENT PILOT STUDY WORK PLAN ADDENDUM, FORMER OILY WASTE PONDS (ENCLOSURE IS RECORD # 5317)
    Site(s): PARCEL E, SITE 00003
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR OCTOBER - DECEMBER 2014, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 5298)
    Site(s): PARCEL E2
  • LANDFILL GAS MONITORING REPORT FOR OCTOBER - DECEMBER 2014, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 5297 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2
  • FINAL FEDERAL FACILITY AGREEMENT SCHEDULE FOR FISCAL YEAR 2015 (CD COPY ENCLOSED) [SEE RECORD # 5299 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL F, PARCEL UC3, SITE 00002, SITE 00003, SITE 00012, SITE 00026
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 02/01/2015
    • Report
    • Record#: 005300
    • View Record
  • TRANSMITTAL OF THE DRAFT SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN) ACTIVATED CARBON AMENDMENTS PILOT STUDY MONITORING (ENCLOSURE IS RECORD # 5144)
    Site(s): PARCEL F
  • MEETING MINUTES FOR COMMUNITY MEETING HELD ON 3 DECEMBER 2014
    Site(s): PARCEL E, SITE 00003
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 12/03/2014
    • Minutes
    • Record#: 005999
    • View Record
  • FACT SHEET - UPDATE ON CLEANUP ACHIEVEMENTS, JULY 2014 - SEPTEMBER 2014
    Site(s): PARCEL C, PARCEL E
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 12/01/2014
    • Fact Sheet
    • Record#: 006005
    • View Record
  • FINAL WORK PLAN, LOADING, TRANSPORTATION, AND REMOVAL OF WASTE MATERIAL (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
  • TRANSMITTAL OF FINAL PETROLEUM HYDROCARBON SITE-SPECIFIC CLOSEOUT REPORT FOR AREA OF CONCERN 28-M, PARCEL C, DATED 1 NOVEMBER 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL C, SITE 00028
  • TRANSMITTAL OF FINAL PETROLEUM HYDROCARBON SITE-SPECIFIC CLOSEOUT REPORT FOR BORING OF CONCERN IR29B040, DATED 1 NOVEMBER 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL C, SITE 00029
  • NON-SIGNIFICANT (MINOR) CHANGES TO THE SELECTED REMEDIES PRESENTED IN THE RECORDS OF DECISIONS FOR PARCELS B, D-1, G, UC-1, AND UC-2 (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL D-1, PARCEL G, PARCEL UC1, PARCEL UC2
    • BRAC PMO WEST
    • 11/18/2014
    • Correspondence
    • Record#: 005290
    • View Record
  • TRANSMITTAL OF THE FINAL EXPLANATION OF SIGNIFICANT DIFFERENCES TO THE FINAL RECORD OF DECISION (ENCLOSURE IS RECORD # 5196)
    Site(s): PARCEL C
  • FINAL EXPLANATION OF SIGNIFICANT DIFFERENCES TO THE FINAL RECORD OF DECISION (CD COPY ENCLOSED) [SEE RECORD # 5195 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL C
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 10/28/2014
    • Report
    • Record#: 005196
    • View Record
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2014, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 5194)
    Site(s): PARCEL E2, SITE 00001, SITE 00021
  • TRANSMITTAL OF THE FINAL COMMUNITY INVOLVEMENT PLAN UPDATE (ENCLOSURE IS RECORD # 5288)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
  • LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2014, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 5193 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2, SITE 00001, SITE 00021
  • FINAL COMMUNITY INVOLVEMENT PLAN UPDATE (CD COPY ENCLOSED) [SEE RECORD # 5287 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
  • TRANSMITTAL OF DRAFT PETROLEUM HYDROCARBON SITE-SPECIFIC CLOSEOUT REPORT FOR AREA OF CONCERN 28-M, PARCEL C, DATED 1 SEPTEMBER 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF DRAFT PROJECT REPORTS FOR 1) SURVEY UNIT 344; 2) SURVEY UNIT 350; 3) SURVEY UNIT 351; AND 4) SURVEY UNIT 355, PARCEL E SANITARY SEWER AND STORM DRAIN RADIOLOGICAL REMEDIATION AND SUPPORT, DATED 1 SEPTEMBER 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL E
  • TRANSMITTAL OF DRAFT PETROLEUM HYDROCARBON SITE-SPECIFIC CLOSEOUT REPORT FOR AREA OF CONCERN 28-N, PARCEL C, DATED 1 SEPTEMBER 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF DRAFT PROJECT REPORTS FOR 1) SURVEY UNIT 345; 2) SURVEY UNIT 346; 3) SURVEY UNIT 347; AND 4) SURVEY UNIT 349, PARCEL E SANITARY SEWER AND STORM DRAIN RADIOLOGICAL REMEDIATION AND SUPPORT, DATED 1 SEPTEMBER 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL E, SITE 00036
  • TRANSMITTAL OF DRAFT PETROLEUM HYDROCARBON SITE CLOSEOUT REPORT FOR BORING OF CONCERN IR29B040, PARCEL C, DATED 1 AUGUST 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • FINAL FACT SHEET - ANNUAL UPDATE OF CLEANUP ACHIEVEMENTS
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 08/18/2014
    • Fact Sheet
    • Record#: 006002
    • View Record
  • TRANSMITTAL OF FINAL TECHNICAL MEMORANDUM SOIL VAPOR INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT AT PARCEL UC-1, DATED 7 AUGUST 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL UC1
  • TRANSMITTAL OF REPLACEMENT PAGES CONVERTING FINAL - FINAL STATUS SURVEY RESULTS, FORMER SHACK 79 AND 80 SITES, DATED 1 MAY 2014 TO REVISION 1
    Site(s): BASEWIDE
  • FACT SHEET - UPDATE ON CLEANUP ACHIEVEMENTS, APRIL 2014 - JUNE 2014
    Site(s): PARCEL E2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 08/01/2014
    • Fact Sheet
    • Record#: 006004
    • View Record
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR APRIL-JUNE 2014, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 5122)
    Site(s): PARCEL E2
  • LANDFILL GAS MONITORING REPORT FOR APRIL-JUNE 2014, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 5121 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2
  • TRANSMITTAL OF FINAL IN SITU STABILIZATION/SOLIDIFICATION DESIGN, NON-AQUEOUS PHASE LIQUID TREATMENT PILOT STUDY, SITE 3, FORMER OILY WASTE PONDS, DATED 1 JUNE 2014 (PUBLIC DOCUMENT)
    Site(s): SITE 00003
  • TRANSMITTAL OF DRAFT SOIL VAPOR EXTRACTION SYSTEM OPERATION AND MAINTENANCE PLAN, PARCEL C REMEDIAL ACTION, REMEDIAL UNITS C1, C4, AND C5, AND BUILDING 241, DATED 1 JUNE 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF DRAFT PETROLEUM HYDROCARBON SITE CLOSEOUT REPORT, PARCEL C, SITE-SPECIFIC ATTACHMENT FOR AREA OF CONCERN 28-Q, DATED 1 JUNE 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • FINAL IN SITU STABILIZATION/SOLIDIFICATION DESIGN, NON-AQUEOUS PHASE LIQUID TREATMENT PILOT STUDY, SITE 3, FORMER OILY WASTE PONDS (PUBLIC DOCUMENT)
    Site(s): SITE 00003
    • CABRERA - INSIGHT, JOINT VENTURE
    • 06/01/2014
    • Report
    • Record#: 005101
    • View Record
  • TRANSMITTAL OF FINAL OPERATION AND MAINTENANCE PLAN FOR PARCEL G, DATED 1 MAY 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL G
  • TRANSMITTAL OF DRAFT PETROLEUM HYDROCARBON SITE CLOSEOUT REPORT, PARCEL C, SITE-SPECIFIC ATTACHMENT FOR BORING OF CONCERN IR28B257, DATED 1 MAY 2014 (PUBLIC DOCUMENT)
    Site(s): BASEWIDE
  • TRANSMITTAL OF DRAFT PETROLEUM HYDROCARBON CLOSEOUT REPORT, PARCEL C, DATED 1 MARCH 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF DRAFT PETROLEUM HYDROCARBON CLOSEOUT REPORT, PARCEL C, DATED 1 MARCH 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF SEMIANNUAL GROUNDWATER MONITORING REPORT, JULY - DECEMBER 2013, DATED 1 APRIL 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, SITE 00001, SITE 00003, SITE 00007, SITE 00028, SITE 00036, SITE 00039
  • TRANSMITTAL OF DRAFT IN SITU STABILIZATION SOLIDIFICATION DESIGN, NON-AQUEOUS PHASE LIQUID TREATMENT PILOT STUDY, SITE 3, FORMER OILY WASTE PONDS, DATED 1 APRIL 2014 (PUBLIC DOCUMENT)
    Site(s): SITE 00003
  • MEETING MINUTES FOR COMMUNITY MEETING HELD ON 23 APRIL 2014
    Site(s): PARCEL E2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/23/2014
    • Minutes
    • Record#: 005991
    • View Record
  • TRANSMITTAL OF THE DRAFT TECHNICAL MEMORANDUM SOIL VAPOR INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT (ENCLOSURE IS RECORD # 5002)
    Site(s): PARCEL UC1
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR JANUARY-MARCH 2014, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 5023)
    Site(s): PARCEL E2
  • LANDFILL GAS MONITORING REPORT FOR JANUARY-MARCH 2014, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 5022 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2
  • TRANSMITTAL OF THE DRAFT EXPLANATION OF SIGNIFICANT DIFFERENCES TO THE FINAL RECORD OF DECISION (ENCLOSURE IS RECORD # 5042)
    Site(s): PARCEL C
  • TRANSMITTAL OF FINAL WORK PLAN, HOT SPOT DELINEATION AND EXCAVATION REMEDIAL ACTION, PARCEL E-2, DATED 28 MARCH 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • FINAL FACT SHEET - UPDATE OF CLEANUP ACHIEVEMENTS, OCTOBER 2013 - MARCH 2014
    Site(s): PARCEL E2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2014
    • Fact Sheet
    • Record#: 006003
    • View Record
  • FACT SHEET: FINAL PROGRAM OUTREACH ACHIEVEMENTS UPDATE: SECOND AND THIRD QUARTER 2013 (APRIL-SEPTEMBER) [CD COPY ENCLOSED]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC1, PARCEL UC3, SITE 00003, SITE 00007, SITE 00018
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2014
    • Fact Sheet
    • Record#: 005050
    • View Record
  • FINAL FACT SHEET - PARCEL E-2 REMEDIAL DESIGN (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2014
    • Fact Sheet
    • Record#: 006001
    • View Record
  • SEMIANNUAL GROUNDWATER MONITORING REPORT, JULY - DECEMBER 2013 (APPENDICES G THROUGH L) [PUBLIC DOCUMENT]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, SITE 00001, SITE 00003, SITE 00007, SITE 00036, SITE 00039
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 04/01/2014
    • Report
    • Record#: 006206
    • View Record
  • SEMIANNUAL GROUNDWATER MONITORING REPORT, JULY - DECEMBER 2013 (APPENDIX F, PART 1 OF 2) [PUBLIC DOCUMENT]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, SITE 00001, SITE 00003, SITE 00007, SITE 00036, SITE 00039
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 04/01/2014
    • Report
    • Record#: 006204
    • View Record
  • SEMIANNUAL GROUNDWATER MONITORING REPORT, JULY - DECEMBER 2013 (APPENDIX F, PART 2 OF 2) [PUBLIC DOCUMENT]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, SITE 00001, SITE 00003, SITE 00007, SITE 00036, SITE 00039
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 04/01/2014
    • Report
    • Record#: 006205
    • View Record
  • SEMIANNUAL GROUNDWATER MONITORING REPORT, JULY - DECEMBER 2013 (MAIN REPORT, APPENDICES A THROUGH E) [PUBLIC DOCUMENT]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, SITE 00001, SITE 00003, SITE 00007, SITE 00036, SITE 00039
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 04/01/2014
    • Report
    • Record#: 006203
    • View Record
  • TRANSMITTAL OF 2013 ANNUAL OPERATION AND MAINTENANCE SUMMARY REPORT FOR PARCELS UC-1 AND UC-2, DATED 21 MARCH 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL UC1, PARCEL UC2
  • FINAL PARCEL E POTHOLE AREA CHARACTERIZATION TECHNICAL MEMORANDUM (APPENDIX G, PART 3 OF 6)
    Site(s): PARCEL E
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 03/06/2014
    • Report
    • Record#: 006115
    • View Record
  • FINAL PARCEL E POTHOLE AREA CHARACTERIZATION TECHNICAL MEMORANDUM (MAIN REPORT AND APPENDICES A THROUGH F)
    Site(s): PARCEL E
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 03/06/2014
    • Report
    • Record#: 006112
    • View Record
  • FINAL PARCEL E POTHOLE AREA CHARACTERIZATION TECHNICAL MEMORANDUM (APPENDIX G, PART 1 OF 6)
    Site(s): PARCEL E
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 03/06/2014
    • Report
    • Record#: 006113
    • View Record
  • RESPONSES TO COMMENTS ON THE DRAFT POTHOLE AREA CHARACTERIZATION TECHNICAL (SEE RECORD # 5030 - U.S. EPA COMMENTS; RECORD # 5031 - DTSC COMMENTS; RECORD # 5032 - CRWQCB COMMENTS; AND RECORD # 5033 - SAN FRANCISCO DEPARTMENT OF PUBLIC HEALTH COMMENTS)
    Site(s): PARCEL E
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 03/06/2014
    • Correspondence
    • Record#: 005034
    • View Record
  • TRANSMITTAL OF THE FINAL POTHOLE AREA CHARACTERIZATION TECHNICAL MEMORANDUM (ENCLOSURE IS RECORD # 5009)
    Site(s): PARCEL E
  • FINAL PARCEL E POTHOLE AREA CHARACTERIZATION TECHNICAL MEMORANDUM (APPENDIX G, PART 6 OF 6)
    Site(s): PARCEL E
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 03/06/2014
    • Report
    • Record#: 006118
    • View Record
  • FINAL PARCEL E POTHOLE AREA CHARACTERIZATION TECHNICAL MEMORANDUM (APPENDIX H)
    Site(s): PARCEL E
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 03/06/2014
    • Report
    • Record#: 006119
    • View Record
  • FINAL PARCEL E POTHOLE AREA CHARACTERIZATION TECHNICAL MEMORANDUM (APPENDIX G, PART 4 OF 6)
    Site(s): PARCEL E
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 03/06/2014
    • Report
    • Record#: 006116
    • View Record
  • FINAL PARCEL E POTHOLE AREA CHARACTERIZATION TECHNICAL MEMORANDUM (APPENDIX G, PART 2 OF 6)
    Site(s): PARCEL E
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 03/06/2014
    • Report
    • Record#: 006114
    • View Record
  • FINAL PARCEL E POTHOLE AREA CHARACTERIZATION TECHNICAL MEMORANDUM (APPENDIX G, PART 5 OF 6)
    Site(s): PARCEL E
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 03/06/2014
    • Report
    • Record#: 006117
    • View Record
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR OCTOBER-DECEMBER 2013, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 4985)
    Site(s): PARCEL E2
  • CONCURRENCE WITH DRAFT PARCEL E POTHOLE AREA CHARACTERIZATION TECHNICAL MEMORANDUM, DATED 12 DECEMBER 2013
    Site(s): PARCEL E
  • TRANSMITTAL OF THE FINAL RECORD OF DECISION (ENCLOSURE IS RECORD # 5152)
    Site(s): PARCEL UC3, SITE 00045, SITE 00056
  • LANDFILL GAS MONITORING REPORT FOR OCTOBER-DECEMBER 2013 POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 4984 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2
  • TRANSMITTAL OF FINAL REMEDIAL ACTION WORK PLAN, REMEDIAL ACTION IN PARCEL D-1, DATED 14 JANUARY 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • TRANSMITTAL OF FINAL - FINAL STATUS SURVEY REPORT, GUN MOLE PIER AREA, DATED 14 JANUARY 2014
    Site(s): PARCEL D-1
  • COMMENTS ON DRAFT PARCEL E POTHOLE AREA CHARACTERIZATION TECHNICAL MEMORANDUM, DATED 12 DECEMBER 2013
    Site(s): PARCEL E
    • DEPARTMENT OF PUBLIC HEALTH - SAN FRANCISCO, CA
    • 01/16/2014
    • Correspondence
    • Record#: 005033
    • Request for Record
  • TRANSMITTAL OF FINAL RADIOLOGICAL REMOVAL ACTION COMPLETION REPORT, RADIOLOGICAL SURVEYS OF BUILDING AND GROUND SURFACES, AND STORM DRAIN AND SANITARY SEWER REMOVAL, PARCEL D-1, PHASE 1, DATED 14 JANUARY 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • COMMENTS ON DRAFT PARCEL E POTHOLE AREA CHARACTERIZATION TECHNICAL MEMORANDUM, DATED 12 DECEMBER 2013
    Site(s): PARCEL E
  • COMMENTS ON DRAFT PARCEL E POTHOLE AREA CHARACTERIZATION TECHNICAL MEMORANDUM, DATED 12 DECEMBER 2013
    Site(s): PARCEL E
  • PUBLIC NOTICE ANNOUNCING THE AVAILABILITY OF THE RECORD OF DECISION (CD COPY ENCLOSED)
    Site(s): PARCEL E
    • SUN-REPORTER - SAN FRANCISCO, CA
    • 01/09/2014
    • Public Notice
    • Record#: 004948
    • View Record
  • PUBLIC NOTICE ANNOUNCING THE AVAILABILITY OF THE RECORD OF DECISION (CD COPY ENCLOSED)
    Site(s): PARCEL E
    • SAN FRANCISCO CHRONICLE - SAN FRANCISCO, CA
    • 01/05/2014
    • Public Notice
    • Record#: 004946
    • View Record
  • FINAL RECORD OF DECISION (CD COPY ENCLOSED) [SEE RECORD # 5151 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL UC3, SITE 00045, SITE 00056
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/01/2014
    • Report
    • Record#: 005152
    • View Record
  • PUBLIC NOTICE - NOTICE OF 2014 COMMUNITY EVENTS CALENDAR
    Site(s): BASEWIDE
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/01/2014
    • Public Notice
    • Record#: 006000
    • View Record
  • PUBLIC NOTICE ANNOUNCING THE AVAILABILITY OF THE RECORD OF DECISION (CD COPY ENCLOSED)
    Site(s): PARCEL E
    • SAN FRANCISCO BAY VIEW - SAN FRANCISCO, CA
    • 01/01/2014
    • Public Notice
    • Record#: 004947
    • View Record
  • TRANSMITTAL OF THE FINAL RECORD OF DECISION (ENCLOSURE IS RECORD # 4983)
    Site(s): PARCEL E
  • FINAL RECORD OF DECISION (CD COPY ENCLOSED) [SEE RECORD # 4982 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E, SITE 00003
    • ENGINEERING/REMEDIATION RESOURCES GROUP, INC.
    • 12/23/2013
    • Report
    • Record#: 004983
    • View Record
  • TRANSMITTAL OF DRAFT WORK PLAN, HOT SPOT DELINEATION AND EXCAVATION REMEDIAL ACTION, PARCEL E-2, DATED 20 DECEMBER 2013 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF THE DRAFT POTHOLE AREA CHARACTERIZATION TECHNICAL MEMORANDUM (ENCLOSURE IS RECORD # 4911)
    Site(s): PARCEL E
  • TRANSMITTAL OF THE REPLACEMENT PAGES UPDATING THE FINAL TECHNICAL MEMORANDUM FOR THE RADIOLOGICAL DATA GAP INVESTIGATION PHASE 2B, DATED 01 SEPTEMBER 2013 (ENCLOSURE IS RECORD # 4972)
    Site(s): PARCEL F
  • 2013 CALENDAR OF COMMUNITY EVENTS (INCLUDES SPANISH AND CHINESE VERSIONS AND CD COPY)
    Site(s): BASEWIDE
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 12/01/2013
    • Correspondence
    • Record#: 004925
    • View Record
  • TRANSMITTAL OF THE DRAFT FINAL PROJECT WORK PLAN PETROLEUM HYDROCARBON CORRECTIVE ACTION IMPLEMENTATION (ENCLOSURE IS RECORD # 4900)
    Site(s): PARCEL E
    • BRAC PMO WEST
    • 11/29/2013
    • Correspondence
    • Record#: 004899
    • View Record
  • TRANSMITTAL OF FINAL IN SITU THERMAL REMEDIATION DESIGN NON-AQUEOUS PHASE LIQUID TREATMENT PILOT STUDY, SITE 3, FORMER OILY WASTE PONDS, DATED 1 NOVEMBER 2013 (PUBLIC DOCUMENT)
    Site(s): PARCEL E, SITE 00003
  • TRANSMITTAL OF THE FINAL EXECUTION PLAN, SANITARY SEWER AND STORM DRAIN RADIOLOGICAL REMEDIATION SUPPORT (ENCLOSURE IS RECORD # 4945)
    Site(s): PARCEL E
  • FINAL THIRD FIVE-YEAR REVIEW OF REMEDIAL ACTIONS (CD COPY ENCLOSED) [SEE RECORD # 4959 - BRAC PMO WEST TRANSMITTAL LETTER] (PUBLIC DOCUMENT)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 11/08/2013
    • Report
    • Record#: 004960
    • View Record
  • TRANSMITTAL LETTER REGARDING THE FINAL ACCIDENT PREVENTION PLAN/SITE SAFETY AND HEALTH PLAN PARCEL E SANITARY SEWER AND STORM DRAIN RADIOLOGICAL REMEDIATION AND SUPPORT HUNTERS POINT NAVAL SHIPYARD CA
    Site(s): PARCEL E
    • TETRA TECH EC, INC.
    • 11/06/2013
    • Correspondence
    • Record#: 005581
    • View Record
  • FINAL TECHNICAL MEMORANDUM, EXIT STRATEGY FOR PARCELS (CD COPY ENCLOSED)
    Site(s): PARCEL E, PARCEL E2, SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00021
  • FINAL ACCIDENT PREVENTION PLAN/SITE SAFETY AND HEALTH PLAN (CD COPY ENCLOSED)
    Site(s): PARCEL E
    • TETRA TECH EC, INC.
    • 11/01/2013
    • Report
    • Record#: 004924
    • View Record
  • FINAL EXECUTION PLAN, SANITARY SEWER AND STORM DRAIN RADIOLOGICAL REMEDIATION AND SUPPORT (CD COPY ENCLOSED) [SEE RECORD # 4944 - BRAC PMO WEST TRANSMITTAL LETTER] {DOCUMENT ALSO CONTAINS PRIVACY ACT INFORMATION)
    Site(s): PARCEL E
  • MEMORANDUM: GROUNDWATER ANALYTICAL RESULTS EXCEEDING REMEDIATION GOALS OR TRIGGER LEVELS, THIRD QUARTER 2013 (CD COPY ENCLOSED)
    Site(s): BASEWIDE
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 10/31/2013
    • Report
    • Record#: 004901
    • View Record
  • TRANSMITTAL OF THE FINAL PETROLEUM HYDROCARBON CORRECTIVE ACTION, FORTH QUARTER 2012 AND ANNUAL GROUNDWATER MONITORING REPORT, COMBINED SITE (ENCLOSURE IS RECORD # 4956)
    Site(s): BASEWIDE
  • CONCURRENCE WITH RESPONSE TO COMMENTS ON DRAFT THIRD FIVE-YEAR REVIEW, DATED 13 MAY 2013 (PUBLIC DOCUMENT)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
    • U.S. EPA - SAN FRANCISCO, CA
    • 10/18/2013
    • Correspondence
    • Record#: 004943
    • View Record
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2013, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 4903)
    Site(s): PARCEL E2
  • TRANSMITTAL OF DRAFT RADIOLOGICAL REMOVAL ACTION COMPLETION REPORT, RADIOLOGICAL SURVEYS OF BUILDINGS AND GROUND SURFACES, AND STORM DRAIN AND SANITARY SEWER REMOVAL, PARCEL D-1, DATED 1 OCTOBER 2013 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • TRANSMITTAL OF FINAL WORK PLAN, LOADING, TRANSPORTATION, AND REMOVAL OF WASTE MATERIAL, DATED 1 OCTOBER 2013
    Site(s): PARCEL B, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
    • BRAC PMO WEST
    • 10/11/2013
    • Correspondence
    • Record#: 004998
    • View Record
  • LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2013, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 4902 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2
  • TRANSMITTAL OF SEMIANNUAL GROUNDWATER MONITORING REPORT (JANUARY-JUNE 2013), DATED 1 SEPTEMBER 2013 (PUBLIC DOCUMENT)
    Site(s): SITE 00003
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION COMPLETION REPORT FOR PARCEL G, DATED 1 OCTOBER 2013 (PUBLIC DOCUMENT)
    Site(s): PARCEL G
  • TRANSMITTAL OF DRAFT OPERATION AND MAINTENANCE PLAN FOR PARCEL G, DATED 1 OCTOBER 2013 (PUBLIC DOCUMENT)
    Site(s): PARCEL G
  • FINAL PETROLEUM HYDROCARBON CORRECTIVE ACTION, FORTH QUARTER 2012 AND ANNUAL GROUNDWATER MONITORING REPORT, COMBINED SITE (CD COPY ENCLOSED) [SEE RECORD # 4955 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL B
    • ITSI GILBANE COMPANY
    • 10/01/2013
    • Report
    • Record#: 004956
    • View Record
  • FINAL WORK PLAN, LOADING, TRANSPORTATION, AND REMOVAL OF WASTE MATERIAL
    Site(s): PARCEL B, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
  • TRANSMITTAL OF FINAL TECHNICAL MEMORANDUM FOR THE RADIOLOGICAL DATA GAP INVESTIGATION PHASE 2B AT PARCEL F, DATED 1 SEPTEMBER 2013
    Site(s): PARCEL F
  • TRANSMITTAL OF FINAL FEDERAL FACILITY AGREEMENT SCHEDULE FOR FISCAL YEAR 2014, DATED 1 SEPTEMBER 2013
    Site(s): SITE 00003
    • BRAC PMO WEST
    • 09/30/2013
    • Correspondence
    • Record#: 004895
    • View Record
  • TRANSMITTAL OF THE FINAL SOIL GAS INVESTIGATION ADDENDUM TO THE FINAL WORK PLAN FOR SOIL GAS INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT (ENCLOSURE IS RECORD # 4894)
    Site(s): PARCEL B, PARCEL D-1, PARCEL G, PARCEL UC2
  • FINAL SOIL GAS INVESTIGATION ADDENDUM TO THE FINAL WORK PLAN FOR SOIL GAS INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT (CD COPY ENCLOSED)
    Site(s): PARCEL D-1, PARCEL G, PARCEL UC2
    • ENGINEERING/REMEDIATION RESOURCES GROUP, INC.
    • 09/25/2013
    • Report
    • Record#: 004894
    • Request for Record
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION WORK PLAN, REMEDIAL ACTION IN PARCEL D-1, DATED 1 SEPTEMBER 2013 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-1
  • TRANSMITTAL OF DRAFT FINAL PETROLEUM HYDROCARBON PROJECT WORK PLAN, PARCEL C, DATED 1 SEPTEMBER 2013
    Site(s): PARCEL C
  • TRANSMITTAL OF THE DRAFT SOIL GAS INVESTIGATION ADDENDUM TO FINAL WORK PLAN FOR SOIL GAS INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT (ENCLOSURE IS RECORD # 4798)
    Site(s): PARCEL B, PARCEL D-1, PARCEL G, PARCEL UC1, PARCEL UC2
  • FINAL TECHNICAL MEMORANDUM FOR THE RADIOLOGICAL DATA GAP INVESTIGATION PHASE 2B AT PARCEL F
    Site(s): PARCEL F
    • ITSI GILBANE COMPANY
    • 09/01/2013
    • Report
    • Record#: 004972
    • View Record
  • FINAL FEDERAL FACILITY AGREEMENT SCHEDULE FOR FISCAL YEAR 2014
    Site(s): PARCEL B, PARCEL D-1, PARCEL G, SITE 00007, SITE 00018
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 09/01/2013
    • Report
    • Record#: 004896
    • View Record
  • TRANSMITTAL OF FINAL BASEWIDE RADIOLOGICAL MANAGEMENT PLAN, DATED 1 JULY 2013
    Site(s): PARCEL B, PARCEL C, PARCEL D, PARCEL E, PARCEL E2, PARCEL F
  • TRANSMITTAL OF THE FINAL EXECUTION PLAN, RADIOLOGICAL REMEDIATION AND SUPPORT, PHASE II (ENCLOSURE IS RECORD # 5085)
    Site(s): PARCEL D-1
  • TRANSMITTAL OF FINAL WORK PLAN, PARCEL C REMEDIAL ACTION, REMEDIAL UNITS C1, C4, AND C5, AND BUILDING 241 (EXCLUDES C2), DATED 25 AUGUST 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF FINAL TECHNICAL MEMORANDUM FOR PARCEL G COMPREHENSIVE ENVIRONMENTAL RESPONSE, COMPENSATION AND LIABILITY ACT TANK CLOSURE SAMPLING, DATED 1 JUNE 2013
    Site(s): PARCEL G
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR APRIL-JUNE 2013 POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 4847)
    Site(s): PARCEL E2
  • LANDFILL GAS MONITORING REPORT FOR APRIL-JUNE 2013 POST-REMOVAL, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 4846 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2
  • TRANSMITTAL OF FINAL WORK PLAN, PARCEL C REMEDIAL ACTION, REMEDIAL UNITS C1, C4, AND C5, AND BUILDING 241 (EXCLUDES C2), DATED 25 AUGUST 2014 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • FINAL EXECUTION PLAN, RADIOLOGICAL REMEDIATION AND SUPPORT, PARCEL D-1, PHASE 2
    Site(s): PARCEL D-1
  • FINAL BASEWIDE RADIOLOGICAL MANAGEMENT PLAN
    Site(s): PARCEL B, PARCEL C, PARCEL D, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
    • ITSI GILBANE COMPANY
    • 07/01/2013
    • Report
    • Record#: 004997
    • View Record
  • TRANSMITTAL OF DRAFT RECORD OF DECISION FOR PARCEL UC-3, DATED 1 JUNE 2013
    Site(s): PARCEL UC3
  • TRANSMITTAL OF DRAFT REMEDIAL DESIGN PACKAGE, PARCEL E-2, DATED 28 JUNE 2013 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • TRANSMITTAL OF THE DRAFT TECHNICAL MEMORANDUM FOR RADIOLOGICAL DATA GAP INVESTIGATION PHASE 2B (ENCLOSURE IS RECORD #4796)
    Site(s): PARCEL F
  • TRANSMITTAL OF FINAL NONAQUEOUS PHASE LIQUID TREATMENT PILOT STUDY WORK PLAN, SITE 3, FORMER OILY WASTE PONDS, PARCEL E, DATED 14 JUNE 2013
    Site(s): SITE 00003
  • TRANSMITTAL OF FINAL - FINAL STATUS SURVEY REPORT, SOUTH PIER AREA, DATED 18 JUNE 2013
    Site(s): BASEWIDE
  • TRANSMITTAL OF THE DRAFT RECORD OF DECISION (ENCLOSURE IS RECORD # 4748)
    Site(s): PARCEL E
  • FINAL NONAQUEOUS PHASE LIQUID TREATMENT PILOT STUDY WORK PLAN, SITE 3, FORMER OILY WASTE PONDS, PARCEL E
    Site(s): PARCEL E, SITE 00003
  • MEMORANDUM: GROUNDWATER ANALYTICAL RESULTS EXCEEDING REMEDIATION GOALS OR TRIGGER LEVELS, FIRST QUARTER 2013 (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL C, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC2
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 06/11/2013
    • Report
    • Record#: 004843
    • View Record
  • TRANSMITTAL OF THE FINAL TECHNICAL MEMORANDUM FOR SOIL EXCAVATION CHARACTERIZATION (ENCLOSURE IS RECORD # 4950)
    Site(s): PARCEL E
  • FINAL TECHNICAL MEMORANDUM FOR SOIL EXCAVATION CHARACTERIZATION
    Site(s): PARCEL E
    • ARCADIS U.S., INC.
    • 06/01/2013
    • Report
    • Record#: 004950
    • View Record
  • TRANSMITTAL OF THE FINAL POTHOLE AREA CHARACTERIZATION WORK PLAN (ENCLOSURE IS RECORD # 4850)
    Site(s): PARCEL E
  • RESPONSE TO COMMENTS ON DRAFT PARCEL E POTHOLE AREA CHARACTERIZATION WORK PLAN, DATED 8 JANUARY 2013
    Site(s): PARCEL E
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 05/31/2013
    • Correspondence
    • Record#: 004878
    • View Record
  • FINAL POTHOLE AREA CHARACTERIZATION WORK PLAN (INCLUDES RESPONSES TO COMMENTS WITH DCN TRIE-2205-0024-0003 ON THE DRAFT, AND CD COPY) [SEE RECORD # 4849 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E
  • FINAL WORK PLAN LANDFILL GAS SURVEY AT PARCEL E-2
    Site(s): PARCEL E2
  • TRANSMITTAL OF FINAL WORK PLAN LANDFILL GAS SURVEY AT PARCEL E-2, DATED 13 MAY 2013
    Site(s): PARCEL E2
  • TRANSMITTAL OF THE FINAL AFTER ACTION REPORT, TIME-CRITICAL REMOVAL ACTION FOR THE POLYCHLORINATED BIPHENYL (PCB) HOT SPOT AREA AND TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE AND RADIOLOGICAL SURVEY FOR THE PANHANDLE AREA (ENCLOSURE IS RECORD # 4800)
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 05/06/2013
    • Correspondence
    • Record#: 004799
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN FOR POTHOLE AREA CHARACTERIZATION (CD COPY ENCLOSED)
    Site(s): PARCEL E
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 05/01/2013
    • Report
    • Record#: 004851
    • View Record
  • FINAL AFTER ACTION REPORT, TIME-CRITICAL REMOVAL ACTION FOR THE POLYCHLORINATED BIPHENYL (PCB) HOT SPOT AREA AND TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE AND RADIOLOGICAL SURVEY FOR THE PANHANDLE AREA (CD COPY ENCLOSED) [SEE RECORD # 4799 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): BASEWIDE
    • SHAW ENVIRONMENTAL AND INFRASTRUCTURE, INC.
    • 05/01/2013
    • Report
    • Record#: 004800
    • View Record
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR JANUARY-MARCH 2013, POST-REMOVAL ACTION (ENCLOSURE IS RECORD # 4788)
    Site(s): PARCEL E2
  • LANDFILL GAS MONITORING REPORT FOR JANUARY-MARCH 2013, POST-REMOVAL ACTION (CD COPY ENCLOSED) [SEE RECORD # 4787 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2
  • COMMENTS ON DRAFT NONAQUEOUS PHASE LIQUID TREATMENT PILOT STUDY WORK PLAN FOR SITE 3, FORMER OILY WASTE PONDS, PARCEL E, DATED 1 MARCH 2013
    Site(s): SITE 00003
    • CRWQCB - OAKLAND, CA
    • 04/22/2013
    • Correspondence
    • Record#: 004826
    • View Record
  • COMMENTS ON DRAFT NONAQUEOUS PHASE LIQUID TREATMENT PILOT STUDY WORK PLAN FOR SITE 3, FORMER OILY WASTE PONDS, PARCEL E, DATED 1 MARCH 2013
    Site(s): SITE 00003
    • U.S. EPA - SAN FRANCISCO, CA
    • 04/17/2013
    • Correspondence
    • Record#: 004825
    • View Record
  • COMMENTS ON DRAFT NONAQUEOUS PHASE LIQUID TREATMENT PILOT STUDY WORK PLAN FOR SITE 3, FORMER OILY WASTE PONDS, PARCEL E, DATED 1 MARCH 2013
    Site(s): SITE 00003
    • DEPARTMENT OF PUBLIC HEALTH - SAN FRANCISCO, CA
    • 04/16/2013
    • Correspondence
    • Record#: 004828
    • View Record
  • COMMENTS ON DRAFT NONAQUEOUS PHASE LIQUID TREATMENT PILOT STUDY WORK PLAN FOR SITE 3, FORMER OILY WASTE PONDS, PARCEL E, DATED 1 MARCH 2013
    Site(s): SITE 00003
    • DTSC - BERKELEY, CA
    • 04/16/2013
    • Correspondence
    • Record#: 004827
    • View Record
  • COMMENTS ON RESPONSE TO COMMENTS ON DRAFT PARCEL E POTHOLE AREA CHARACTERIZATION WORK PLAN, DATED 8 JANUARY 2013
    Site(s): PARCEL E
    • CRWQCB - OAKLAND, CA
    • 04/16/2013
    • Correspondence
    • Record#: 004881
    • View Record
  • FINAL TECHNICAL MEMORANDUM FOR RADIOLOGICAL DATA GAP INVESTIGATION PHASE 2A AT PARCEL F SUBMARINE AREAS, PARCEL B REVETMENT WALL AREAS, AND SAN FRANCISCO BAY REFERENCE SITES (APPENDIX B, PART 4 OF 5)
    Site(s): PARCEL B, PARCEL F
  • FINAL TECHNICAL MEMORANDUM FOR RADIOLOGICAL DATA GAP INVESTIGATION PHASE 2A AT PARCEL F SUBMARINE AREAS, PARCEL B REVETMENT WALL AREAS, AND SAN FRANCISCO BAY REFERENCE SITES (APPENDIX B, PART 2 OF 5)
    Site(s): PARCEL B, PARCEL F
  • FINAL TECHNICAL MEMORANDUM FOR RADIOLOGICAL DATA GAP INVESTIGATION PHASE 2A AT PARCEL F SUBMARINE AREAS, PARCEL B REVETMENT WALL AREAS, AND SAN FRANCISCO BAY REFERENCE SITES (APPENDIX B, PART 5 OF 5)
    Site(s): PARCEL B, PARCEL F
  • FINAL TECHNICAL MEMORANDUM FOR RADIOLOGICAL DATA GAP INVESTIGATION PHASE 2A AT PARCEL F SUBMARINE AREAS, PARCEL B REVETMENT WALL AREAS, AND SAN FRANCISCO BAY REFERENCE SITES (APPENDICES C THROUGH G)
    Site(s): PARCEL B, PARCEL F
  • FINAL TECHNICAL MEMORANDUM FOR RADIOLOGICAL DATA GAP INVESTIGATION PHASE 2A AT PARCEL F SUBMARINE AREAS, PARCEL B REVETMENT WALL AREAS, AND SAN FRANCISCO BAY REFERENCE SITES (MAIN REPORT AND APPENDIX A)
    Site(s): PARCEL B, PARCEL F
  • CONCURRENCE WITH RESPONSE TO COMMENTS ON DRAFT PARCEL E POTHOLE AREA CHARACTERIZATION WORK PLAN, DATED 8 JANUARY 2013
    Site(s): PARCEL E
    • DEPARTMENT OF PUBLIC HEALTH - SAN FRANCISCO, CA
    • 04/15/2013
    • Correspondence
    • Record#: 004880
    • View Record
  • FINAL TECHNICAL MEMORANDUM FOR RADIOLOGICAL DATA GAP INVESTIGATION PHASE 2A AT PARCEL F SUBMARINE AREAS, PARCEL B REVETMENT WALL AREAS, AND SAN FRANCISCO BAY REFERENCE SITES (APPENDIX B, PART 3 OF 5)
    Site(s): PARCEL B, PARCEL F
  • TRANSMITTAL OF FINAL TECHNICAL MEMORANDUM FOR RADIOLOGICAL DATA GAP INVESTIGATION PHASE 2A AT PARCEL F SUBMARINE AREAS, PARCEL B REVETMENT WALL AREAS, AND SAN FRANCISCO BAY REFERENCE SITES, DATED 15 APRIL 2013
    Site(s): PARCEL B, PARCEL F
  • FINAL TECHNICAL MEMORANDUM FOR RADIOLOGICAL DATA GAP INVESTIGATION PHASE 2A AT PARCEL F SUBMARINE AREAS, PARCEL B REVETMENT WALL AREAS, AND SAN FRANCISCO BAY REFERENCE SITES (APPENDIX B, PART 1 OF 5)
    Site(s): PARCEL B, PARCEL F
  • TRANSMITTAL OF COMMENTS FROM CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE ON FINAL REMOVAL ACTION COMPLETION REPORT, TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE, PARCEL E-2, DATED 13 FEBRUARY 2013 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
    • DTSC - BERKELEY, CA
    • 04/11/2013
    • Correspondence
    • Record#: 004737
    • View Record
  • CONCURRENCE WITH RESPONSE TO COMMENTS ON DRAFT PARCEL E POTHOLE AREA CHARACTERIZATION WORK PLAN, DATED 8 JANUARY 2013
    Site(s): PARCEL E
    • DTSC - BERKELEY, CA
    • 04/08/2013
    • Correspondence
    • Record#: 004879
    • View Record
  • COMMENTS ON RESPONSE TO COMMENTS ON DRAFT PARCEL E POTHOLE AREA CHARACTERIZATION WORK PLAN, DATED 8 JANUARY 2013
    Site(s): PARCEL E
    • U.S. EPA - SAN FRANCISCO, CA
    • 04/05/2013
    • Correspondence
    • Record#: 004882
    • View Record
  • FINAL EXECUTION PLAN, BASEWIDE RADIOLOGICAL SUPPORT (CD COPY ENCLOSED)
    Site(s): BASEWIDE
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 04/01/2013
    • Report
    • Record#: 004711
    • View Record
  • COMMENTS ON FINAL REMOVAL ACTION COMPLETION REPORT, TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE, PARCEL E-2, DATED 13 FEBRUARY 2013 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00002, SITE 00021
    • CALIFORNIA DEPATMENT OF FISH AND WILDLIFE - SACRAMENTO, CA
    • 03/29/2013
    • Correspondence
    • Record#: 004738
    • View Record
  • FINAL HEALTH AND SAFETY PLAN, LANDFILL GAS SURVEY (INCLUDES FINAL ACCIDENT PREVENTION PLAN; FINAL SITE SAFETY AND HEALTH PLAN; AND CD COPY)
    Site(s): PARCEL E2
  • TRANSMITTAL OF FINAL POST CONSTRUCTION SUMMARY REPORT, PETROLEUM HYDROCARBON CORRECTIVE ACTION, PARCELS B, D-1, AND G, DATED 1 MARCH 2013
    Site(s): AOC 000046A, AOC 000046B, PARCEL B, PARCEL D-1, PARCEL G
  • TRANSMITTAL OF FINAL PARCEL E GROUNDWATER TREATABILITY STUDY, TECHNICAL REPORT ADDENDUM, DATED 19 MARCH 2013
    Site(s): PARCEL E, SITE 00004, SITE 00036
  • TRANSMITTAL OF FINAL - FINAL STATUS SURVEY REPORT, FORMER BUILDINGS 313, 313A, AND 322 SITES, DATED 7 MARCH 2013
    Site(s): BASEWIDE
  • TRANSMITTAL OF FINAL - FINAL STATUS SURVEY REPORT, BUILDING 383 AREA, DATED 4 MARCH 2013
    Site(s): BASEWIDE
  • FINAL PARCEL E GROUNDWATER TREATABILITY STUDY, TECHNICAL REPORT ADDENDUM
    Site(s): PARCEL E, SITE 00004, SITE 00036
    • SHAW ENVIRONMENTAL AND INFRASTRUCTURE, INC.
    • 03/19/2013
    • Report
    • Record#: 004756
    • View Record
  • TRANSMITTAL OF DRAFT NONAQUEOUS PHASE LIQUID TREATMENT PILOT STUDY WORK PLAN FOR SITE 3, FORMER OILY WASTE PONDS, PARCEL E, DATED 1 MARCH 2013
    Site(s): PARCEL D-1, SITE 00003
  • TRANSMITTAL OF FINAL REMEDIAL ACTION WORK PLAN, REMEDIAL UNIT C2, DATED 14 MARCH 2013 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF DRAFT ACCIDENT PREVENTION PLAN AND SITE SAFETY AND HEALTH PLAN AMENDMENT DOCUMENTATION, PARCEL C REMEDIAL ACTION, REMEDIAL UNITS C1, C4, AND C5, AND BUILDING 241, DATED 1 MARCH 2013
    Site(s): PARCEL C
  • PETROLEUM HYDROCARBON CORRECTIVE ACTION, THIRD QUARTER 2012 GROUNDWATER MONITORING REPORT, COMBINED SITE, PARCEL B
    Site(s): PARCEL B
    • INNOVATIVE TECHNICAL SOLUTIONS, INC.
    • 03/08/2013
    • Report
    • Record#: 002180
    • View Record
  • TRANSMITTAL OF PETROLEUM HYDROCARBON CORRECTIVE ACTION, THIRD QUARTER 2012 GROUNDWATER MONITORING REPORT, COMBINED SITE, PARCEL B, DATED 8 MARCH 2013
    Site(s): PARCEL B
  • FINAL POST CONSTRUCTION SUMMARY REPORT, PETROLEUM HYDROCARBON CORRECTIVE ACTION, PARCELS B, D-1, AND G
    Site(s): AOC 000046A, AOC 000046B, PARCEL B, PARCEL D-1, PARCEL G
    • ITSI GILBANE COMPANY
    • 03/01/2013
    • Report
    • Record#: 004757
    • View Record
  • PROGRAM OUTREACH ACHIEVEMENTS UPDATE: FIRST QUARTER 2013 (JANUARY-MARCH) [CD COPY ENCLOSED]
    Site(s): PARCEL B, PARCEL D-1, PARCEL E, PARCEL G, PARCEL UC2, PARCEL UC3, SITE 00007, SITE 00018
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 03/01/2013
    • Fact Sheet
    • Record#: 004927
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN NONAQUEOUS PHASE LIQUID TREATMENT PILOT STUDY, FORMER OILY WASTE PONDS (CD COPY ENCLOSED)
    Site(s): PARCEL E, SITE 00003
  • TRANSMITTAL OF FINAL PETROLEUM HYDROCARBON CORRECTIVE ACTION, QUARTERLY MONITORING REPORT, FOURTH QUARTER 2011, COMBINED SITE, PARCEL B, DATED 1 FEBRUARY 2013
    Site(s): AOC 000046A, AOC 000046B, PARCEL B
  • COMMENTS ON FINAL - FINAL STATUS SURVEY RESULTS, FORMER BUILDING 510/510A SITE, DATED 1 JANUARY 2013
    Site(s): BASEWIDE
    • CALIFORNIA DEPARTMENT OF PUBLIC HEALTH - SACRAMENTO, CA
    • 02/22/2013
    • Correspondence
    • Record#: 005080
    • Request for Record
  • TRANSMITTAL OF DRAFT WORK PLAN, LANDFILL GAS SURVEY AT PARCEL E-2, DATED 21 FEBRUARY 2013
    Site(s): PARCEL E2
  • TRANSMITTAL OF FINAL SITE CHARACTERIZATION AND BENCH-SCALE TREATABILITY STUDY REPORT FOR SITE 3, PARCEL E, DATED 6 FEBRUARY 2013
    Site(s): PARCEL E, SITE 00003
  • COMMENTS ON DRAFT PARCEL E POTHOLE AREA CHARACTERIZATION WORK PLAN, DATED 8 JANUARY 2013
    Site(s): PARCEL E
    • CRWQCB - OAKLAND, CA
    • 02/12/2013
    • Correspondence
    • Record#: 004876
    • View Record
  • PUBLIC NOTICE ANNOUNCING THE PUBLIC COMMENT PERIOD FOR THE PROPOSED PLAN (CD COPY ENCLOSED)
    Site(s): PARCEL E, PARCEL UC3
    • SAN FRANCISCO CHRONICLE - SAN FRANCISCO, CA
    • 02/10/2013
    • Public Notice
    • Record#: 004707
    • View Record
  • COMMENTS ON DRAFT PARCEL E POTHOLE AREA CHARACTERIZATION WORK PLAN, DATED 8 JANUARY 2013
    Site(s): PARCEL E
    • DEPARTMENT OF PUBLIC HEALTH - SAN FRANCISCO, CA
    • 02/07/2013
    • Correspondence
    • Record#: 004875
    • View Record
  • TRANSMITTAL OF DRAFT REMOVAL ACTION COMPLETION REPORT, PHASE 2 TIME-CRITICAL REMOVAL ACTION FOR THE POLYCHLORINATED BIPHENYL (PCB) HOT SPOT AREA AT PARCEL E-2, DATED 1 FEBRUARY 2013 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
  • PUBLIC NOTICE ANNOUNCING THE PUBLIC COMMENT PERIOD FOR THE PROPOSED PLAN (CD COPY ENCLOSED)
    Site(s): PARCEL E, PARCEL UC3
    • SUN-REPORTER - SAN FRANCISCO, CA
    • 02/07/2013
    • Public Notice
    • Record#: 004706
    • View Record
  • TRANSMITTAL OF DRAFT - FINAL STATUS SURVEY REPORT, SOUTH PIER AREA, DATED 1 JANUARY 2013
    Site(s): PARCEL D-1
  • FINAL SITE CHARACTERIZATION AND BENCH-SCALE TREATABILITY STUDY REPORT FOR SITE 3, PARCEL E, DATED 6 FEBRUARY 2013
    Site(s): PARCEL E, SITE 00003
  • COMMENTS ON DRAFT PARCEL E POTHOLE AREA CHARACTERIZATION WORK PLAN, DATED 8 JANUARY 2013
    Site(s): PARCEL E
    • DTSC - BERKELEY, CA
    • 02/06/2013
    • Correspondence
    • Record#: 004874
    • View Record
  • TRANSMITTAL OF FINAL PETROLEUM HYDROCARBON CORRECTIVE ACTION, SECOND QUARTER 2012 GROUNDWATER MONITORING REPORT, COMBINED SITE, PARCEL B, DATED 4 FEBRUARY 2013
    Site(s): PARCEL B
  • FINAL PROPOSED PLAN FOR CLEANUP (INCLUDES FACT SHEET OF SUMMARY OF THE PROPOSED PLAN; AND CD COPY)
    Site(s): PARCEL E, PARCEL E2, PARCEL UC1, PARCEL UC3, SITE 00002
    • ENGINEERING/REMEDIATION RESOURCES GROUP, INC.
    • 02/01/2013
    • Report
    • Record#: 004720
    • Request for Record
  • FACT SHEET: SUMMARY OF THE PROPOSED PLAN (CD COPY ENCLOSED)
    Site(s): PARCEL E, PARCEL UC3
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 02/01/2013
    • Fact Sheet
    • Record#: 004928
    • View Record
  • FINAL PETROLEUM HYDROCARBON CORRECTIVE ACTION QUARTERLY MONITORING REPORT, FOURTH QUARTER 2011, COMBINED SITES (CD COPY ENCLOSED) [SEE RECORD #4762 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): AOC 000046A, AOC 000046B, PARCEL B
    • ITSI GILBANE COMPANY
    • 02/01/2013
    • Report
    • Record#: 004763
    • View Record
  • PUBLIC NOTICE ANNOUNCING THE PUBLIC COMMENT PERIOD FOR THE PROPOSED PLAN (CD COPY ENCLOSED)
    Site(s): PARCEL E, PARCEL UC3
    • SAN FRANCISCO BAY VIEW - SAN FRANCISCO, CA
    • 02/01/2013
    • Public Notice
    • Record#: 004705
    • View Record
  • COMMENTS ON DRAFT PARCEL E POTHOLE AREA CHARACTERIZATION WORK PLAN, DATED 8 JANUARY 2013
    Site(s): PARCEL E
    • U.S. EPA - SAN FRANCISCO, CA
    • 01/22/2013
    • Correspondence
    • Record#: 004877
    • View Record
  • LANDFILL GAS MONITORING REPORT FOR OCTOBER-DECEMBER 2012 POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 4698 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR OCTOBER-DECEMBER 2012 POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 4699)
    Site(s): PARCEL E2
  • TRANSMITTAL OF THE FINAL EXECUTION PLAN, RADIOLOGICAL SURVEY (ENCLOSURE IS RECORD # 4792)
    Site(s): PARCEL C
    • BRAC PMO WEST
    • 01/16/2013
    • Correspondence
    • Record#: 004791
    • View Record
  • TRANSMITTAL OF THE DRAFT POTHOLE AREA CHARACTERIZATION WORK PLAN (ENCLOSURE IS RECORD # 4536)
    Site(s): PARCEL E
  • TRANSMITTAL OF DRAFT TECHNICAL MEMORANDUM FOR PARCEL E SOIL EXCAVATION CHARACTERIZATION, DATED 1 JANUARY 2013
    Site(s): PARCEL E
  • TRANSMITTAL OF THE FINAL TECHNICAL MEMORANDUM FOR THE GEOTECHNICAL INVESTIGATION (ENCLOSURE IS RECORD # 4643)
    Site(s): PARCEL E2, SITE 00001, SITE 00021
  • FINAL TECHNICAL MEMORANDUM FOR THE GEOTECHNICAL INVESTIGATIONS (CD COPY ENCLOSED) [SEE RECORD # 4642 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2, SITE 00001, SITE 00021
    • ENGINEERING/REMEDIATION RESOURCES GROUP, INC.
    • 01/03/2013
    • Report
    • Record#: 004643
    • Request for Record
  • FINAL EXECUTION PLAN, RADIOLOGICAL SURVEY 9CD COPY ENCLOSED) [SEE RECORD # 4791 - BRAC PMO WEST TRANSMITTAL LETTER] {DOCUMENT ALSO CONTAINS COMMERCIAL TRADE SECRETS}
    Site(s): PARCEL C
  • PROGRAM OUTREACH ACHIEVEMENTS UPDATE: FOURTH QUARTER 2012 (OCTOBER -DECEMBER) [CD COPY ENCLOSED]
    Site(s): PARCEL B, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL F, PARCEL UC1, PARCEL UC2, PARCEL UC3
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/01/2013
    • Fact Sheet
    • Record#: 004926
    • View Record
  • FACT SHEET - EVOLUTION OF THE NAVY'S INDUSTRIAL RADIOLOGICAL CONTROLS PROGRAM
    Site(s): BASEWIDE
    • CHIEF OF NAVAL OPERATIONS ENERGY AND ENVIRONMENTAL READINESS DIVISION
    • 01/01/2013
    • Fact Sheet
    • Record#: 006279
    • View Record
  • TRANSMITTAL OF THE DRAFT FINAL PROPOSED PLAN (ENCLOSURE IS RECORD # 4594)
    Site(s): PARCEL E, PARCEL UC3
    • BRAC PMO WEST
    • 12/21/2012
    • Correspondence
    • Record#: 004593
    • View Record
  • TRANSMITTAL OF DRAFT PARCEL E GROUNDWATER TREATABILITY STUDY, TECHNICAL REPORT ADDENDUM, DATED 1 DECEMBER 2012
    Site(s): PARCEL E
  • MEMORANDUM: GROUNDWATER ANALYTICAL RESULTS EXCEEDING REMEDIATION GOALS OR TRIGGER LEVELS, THIRD QUARTER 2012 (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL C, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC2
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 12/20/2012
    • Report
    • Record#: 004842
    • View Record
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION COMPLETION REPORT FOR PARCELS UC-1 AND UC-2, DATED 10 DECEMBER 2012 (PUBLIC DOCUMENT)
    Site(s): PARCEL UC1, PARCEL UC2
  • FINAL AMENDMENT TO FINAL WORK PLAN FOR RADIOLOGICAL DATA GAP INVESTIGATION AT PARCEL F
    Site(s): PARCEL F
  • TRANSMITTAL OF FINAL AMENDMENT TO FINAL WORK PLAN FOR RADIOLOGICAL DATA GAP INVESTIGATION AT PARCEL F, DATED 10 DECEMBER 2012
    Site(s): PARCEL F
  • TRANSMITTAL OF DRAFT - FINAL STATUS SURVEY REPORT, BUILDING 383 AREA, DATED 1 DECEMBER 2012
    Site(s): BASEWIDE
  • TRANSMITTAL OF DRAFT - FINAL STATUS SURVEY REPORT, FORMER BUILDING 313, 313A, AND 322 SITES, DATED 1 DECEMBER 2012
    Site(s): BASEWIDE
  • TRANSMITTAL OF DRAFT REMOVAL ACTION COMPLETION REPORT, TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE, PARCEL E-2, DATED 1 DECEMBER 2012 (PUBLIC DOCUMENT)
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 12/05/2012
    • Correspondence
    • Record#: 004540
    • View Record
  • PUBLIC NOTICE ANNOUNCING THE AVAILABILITY OF THE RECORD OF DECISION (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • SAN FRANCISCO BAY VIEW - SAN FRANCISCO, CA
    • 12/01/2012
    • Public Notice
    • Record#: 004629
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN/SITE SAFETY AND HEALTH PLAN, RADIOLOGICAL SURVEY OF BUILDINGS (CD COPY ENCLOSED)
    Site(s): PARCEL C
  • PUBLIC NOTICE ANNOUNCING THE AVAILABILITY OF THE RECORD OF DECISION (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • SUN-REPORTER - SAN FRANCISCO, CA
    • 11/29/2012
    • Public Notice
    • Record#: 004628
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT PROPOSED PLAN (SEE RECORD # 4538 - DRAFT PROPOSED PLAN)
    Site(s): PARCEL E, PARCEL UC3
  • PUBLIC NOTICE ANNOUNCING THE AVAILABILITY OF THE RECORD OF DECISION (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • SAN FRANCISCO CHRONICLE - SAN FRANCISCO, CA
    • 11/28/2012
    • Public Notice
    • Record#: 004627
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT PROPOSED PLAN (SEE RECORD # 4538 - DRAFT PROPOSED PLAN)
    Site(s): PARCEL E, PARCEL UC3
    • DTSC - BERKELEY, CA
    • 11/27/2012
    • Correspondence
    • Record#: 004639
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT PROPOSED PLAN (SEE RECORD # 4538 - DRAFT PROPOSED PLAN)
    Site(s): PARCEL E, PARCEL UC3
    • DEPARTMENT OF PUBLIC HEALTH - SAN FRANCISCO, CA
    • 11/27/2012
    • Correspondence
    • Record#: 004641
    • View Record
  • TRANSMITTAL OF THE FINAL RECORD OF DECISION (ENCLOSURE IS RECORD # 4620)
    Site(s): PARCEL E2
  • REVIEW AND COMMENTS ON THE DRAFT PROPOSED PLAN (SEE RECORD # 4538 - DRAFT PROPOSED PLAN)
    Site(s): PARCEL E, PARCEL UC3, SITE 00003
  • FINAL RECORD OF DECISION (CD COPY ENCLOSED) [SEE RECORD # 4619 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2
    • ENGINEERING/REMEDIATION RESOURCES GROUP, INC.
    • 11/20/2012
    • Report
    • Record#: 004620
    • Request for Record
  • TRANSMITTAL OF DRAFT WORK PLAN, PARCEL C REMEDIAL ACTION, REMEDIAL UNITS C1, C4, AND C5, AND BUILDING 241, DATED 1 NOVEMBER 2012 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • TRANSMITTAL OF THE FINAL EXECUTION PLAN, RADIOLOGICAL REMEDIATION AND SUPPORT, PHASE II (ENCLOSURE IS RECORD # 4746)
    Site(s): PARCEL C
    • BRAC PMO WEST
    • 11/08/2012
    • Correspondence
    • Record#: 004745
    • View Record
  • FINAL EXECUTION PLAN, RADIOLOGICAL REMEDIATION AND SUPPORT, PHASE II (CD COPY ENCLOSED) [SEE RECORD # 4745 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL C
  • LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2012, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 4617 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2, SITE 00001, SITE 00021
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2012, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 4618)
    Site(s): PARCEL E2
  • TRANSMITTAL OF THE DRAFT PROPOSED PLAN (ENCLOSURE IS RECORD # 4538)
    Site(s): PARCEL E, PARCEL UC3
    • BRAC PMO WEST
    • 10/26/2012
    • Correspondence
    • Record#: 004537
    • View Record
  • 24 OCTOBER 2012 COMMUNITY MEETING SUMMARY (CD COPY ENCLOSED)
    Site(s): PARCEL C
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 10/24/2012
    • Minutes
    • Record#: 005281
    • View Record
  • TRANSMITTAL OF THE DRAFT TECHNICAL MEMORANDUM FOR THE GEOTECHNICAL INVESTIGATION (ENCLOSURE IS RECORD # 4582)
    Site(s): PARCEL E2, SITE 00001, SITE 00021
  • TRANSMITTAL LETTER REGARDING THE FINAL ACCIDENT PREVENTION PLAN/SITE SAFETY AND HEALTH PLAN PARCEL C PHASE II RADIOLOGICAL REMEDIATION AND SUPPORT HUNTERS POINT NAVAL SHIPYARD CA
    Site(s): PARCEL C
    • TETRA TECH EC, INC.
    • 10/18/2012
    • Correspondence
    • Record#: 005579
    • View Record
  • FACT SHEET: PROGRAM OUTREACH ACHIEVEMENTS: JULY - SEPTEMBER 2012 (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 10/15/2012
    • Fact Sheet
    • Record#: 005280
    • View Record
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION WORK PLAN, REMEDIAL UNIT C2, DATED 1 OCTOBER 2012 (PUBLIC DOCUMENT)
    Site(s): PARCEL C
  • 05 DECEMBER 2012 COMMUNITY MEETING SUMMARY (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3, SITE 00004, SITE 00007, SITE 00018, SITE 00036
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 10/05/2012
    • Minutes
    • Record#: 005283
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN/SITE SAFETY AND HEALTH PLAN, PHASE II RADIOLOGICAL REMEDIATION AND SUPPORT (CD COPY ENCLOSED)
    Site(s): PARCEL C
  • COMMENTS ON DRAFT OPERATION AND MAINTENANCE PLAN FOR SITES 7 AND 18 IN PARCEL B, DATED 24 AUGUST 2012 (PUBLIC DOCUMENT)
    Site(s): PARCEL B, SITE 00007, SITE 00018
    • DEPARTMENT OF PUBLIC HEALTH - SAN FRANCISCO, CA
    • 09/30/2012
    • Correspondence
    • Record#: 004866
    • View Record
  • TRANSMITTAL OF THE DRAFT FINAL RECORD OF DECISION (ENCLOSURE IS RECORD # 4509)
    Site(s): PARCEL E2
  • TRANSMITTAL OF THE DRAFT SITE CHARACTERIZATION AND BENCH-SCALE TREATABILITY STUDY REPORT (ENCLOSURE IS RECORD # 4505)
    Site(s): PARCEL E, SITE 00003
  • COMMENTS ON DRAFT OPERATION AND MAINTENANCE PLAN FOR SITES 7 AND 18 IN PARCEL B, DATED 24 AUGUST 2012 (PUBLIC DOCUMENT)
    Site(s): PARCEL B, SITE 00007, SITE 00018
    • U.S. EPA - SAN FRANCISCO, CA
    • 09/21/2012
    • Correspondence
    • Record#: 004865
    • View Record
  • COMMENTS ON DRAFT OPERATION AND MAINTENANCE PLAN FOR SITES 7 AND 18 IN PARCEL B, DATED 24 AUGUST 2012 (PUBLIC DOCUMENT)
    Site(s): PARCEL B, SITE 00007, SITE 00018
    • DTSC - BERKELEY, CA
    • 09/21/2012
    • Correspondence
    • Record#: 004864
    • View Record
  • TRANSMITTAL OF FINAL SURVEY UNIT 264 PROJECT REPORT, PARCEL D-1 STORM DRAIN AND SANITARY SEWER REMOVAL, DATED 17 SEPTEMBER 2012
    Site(s): PARCEL D-1
  • COMMENTS ON DRAFT OPERATION AND MAINTENANCE PLAN FOR SITES 7 AND 18 IN PARCEL B, DATED 24 AUGUST 2012 (PUBLIC DOCUMENT)
    Site(s): PARCEL B, SITE 00007, SITE 00018
    • CRWQCB - OAKLAND, CA
    • 09/05/2012
    • Correspondence
    • Record#: 004867
    • View Record
  • FINAL FEDERAL FACILITY AGREEMENT SCHEDULE FOR FISCAL YEAR 2013 (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, SITE 00007, SITE 00018
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 09/01/2012
    • Report
    • Record#: 005706
    • View Record
  • FINAL FEASIBILITY STUDY REPORT (CD COPY ENCLOSED) [SEE RECORD # 4630 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E
    • ENGINEERING/REMEDIATION RESOURCES GROUP, INC.
    • 08/31/2012
    • Report
    • Record#: 004631
    • View Record
  • TRANSMITTAL OF THE FINAL RADIOLOGICAL ADDENDUM TO THE FEASIBILITY STUDY REPORT (ENCLOSURE IS RECORD # 4633)
    Site(s): PARCEL E
  • TRANSMITTAL OF THE FINAL FEASIBILITY STUDY REPORT (ENCLOSURE IS RECORD # 4631)
    Site(s): PARCEL E
  • TRANSMITTAL OF THE REVISED DRAFT TECHNICAL MEMORANDUM SOIL VAPOR INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT (ENCLOSURE IS RECORD # 4591)
    Site(s): PARCEL B, PARCEL D-1, PARCEL G, PARCEL UC2
  • FINAL RADIOLOGICAL ADDENDUM TO THE FEASIBILITY STUDY REPORT (CD COPY ENCLOSED) [SEE RECORD # 4632 - BRAC PMO WEST TRANSMITTAL LETTER, AND RECORD # 4631 - FINAL FEASIBILITY STUDY REPORT]
    Site(s): PARCEL E
    • ENGINEERING/REMEDIATION RESOURCES GROUP, INC.
    • 08/31/2012
    • Report
    • Record#: 004633
    • View Record
  • LETTER DOCUMENTING A BOUNDARY CHANGE (CD COPY ENCLOSED) [W/ ENCLOSURE]
    Site(s): PARCEL E, PARCEL E2
  • 22 AUGUST 2012 COMMUNITY MEETING SUMMARY (CD COPY ENCLOSED)
    Site(s): PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 08/22/2012
    • Minutes
    • Record#: 005277
    • View Record
  • 2012 CALENDAR OF COMMUNITY EVENTS: MID-YEAR UPDATE (INCLUDES SPANISH AND CHINESE VERSIONS; AND CD COPY)
    Site(s): PARCEL E2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 08/14/2012
    • Correspondence
    • Record#: 005274
    • View Record
  • TRANSMITTAL OF DRAFT - FINAL STATUS SURVEY REPORT, PARCEL D-1, BUILDING 274, DATED 1 AUGUST 2012
    Site(s): PARCEL D-1
  • TRANSMITTAL OF FINAL PARCEL E SOIL EXCAVATION CHARACTERIZATION WORK PLAN, DATED 1 AUGUST 2012
    Site(s): PARCEL E
  • FINAL PARCEL E SOIL EXCAVATION CHARACTERIZATION WORK PLAN
    Site(s): PARCEL E
  • TRANSMITTAL OF DRAFT TECHNICAL MEMORANDUM FOR RADIOLOGICAL DATA GAP INVESTIGATION PHASE 2A AT PARCEL F SUBMARINE AREAS, PARCEL B REVETMENT WALL AREAS, AND SAN FRANCISCO BAY REFERENCE SITES, DATED 1 JULY 2012
    Site(s): PARCEL F
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR APRIL-JUNE 2012, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 4477)
    Site(s): PARCEL E2
  • LANDFILL GAS MONITORING REPORT FOR APRIL-JUNE 2012, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 4476 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E, PARCEL E2, SITE 00001, SITE 00021
  • FACT SHEET: PROGRAM OUTREACH ACHIEVEMENTS: APRIL - JUNE 2012 (CD COPY ENCLOSED)
    Site(s): PARCEL E2, SITE 00007, SITE 00018
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 07/12/2012
    • Fact Sheet
    • Record#: 005272
    • View Record
  • FINAL WORK PLAN, TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE (INCLUDES RESPONSES TO COMMENTS ON THE DRAFT WORK PLAN; AND CD COPY)
    Site(s): PARCEL E2
    • SHAW ENVIRONMENTAL AND INFRASTRUCTURE, INC.
    • 07/09/2012
    • Report
    • Record#: 004471
    • View Record
  • FINAL WORK PLAN ADDENDUM TO THE GROUNDWATER TREATABILITY STUDY (CD COPY ENCLOSED) [SEE RECORD # 4478 - BRAC PMO WEST TRANSMITTAL LETTER; RECORD # 1709 - FINAL WORK PLAN FOR THE GROUNDWATER TREATABILITY STUDY]
    Site(s): PARCEL E, SITE 00004, SITE 00005, SITE 00006, SITE 00012A, SITE 00012B, SITE 00012C, SITE 00036, SITE 00039, SITE 00056
    • SHAW ENVIRONMENTAL AND INFRASTRUCTURE, INC.
    • 07/09/2012
    • Report
    • Record#: 004479
    • View Record
  • TRANSMITTAL OF THE FINAL WORK PLAN, TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE (ENCLOSURE IS RECORD # 4471)
    Site(s): PARCEL E2
  • TRANSMITTAL OF THE FINAL WORK PLAN ADDENDUM TO THE GROUNDWATER TREATABILITY STUDY (ENCLOSURE IS RECORD # 4479)
    Site(s): PARCEL E
  • 27 JUNE 2012 COMMUNITY MEETING SUMMARY (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL C, PARCEL D, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC1, PARCEL UC2, SITE 00007, SITE 00018
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 06/27/2012
    • Minutes
    • Record#: 005269
    • View Record
  • MEMORANDUM: GROUNDWATER ANALYTICAL RESULTS EXCEEDING REMEDIATION GOALS OR TRIGGER LEVELS, FIRST QUARTER 2012 (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL C, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC2
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 06/20/2012
    • Report
    • Record#: 004841
    • View Record
  • RESPONSES TO COMMENTS ON THE CLARIFICATIONS OF NAVY DATA SET AT SOUTH BASIN (CD COPY ENCLOSED)
    Site(s): PARCEL F
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 06/12/2012
    • Correspondence
    • Record#: 005273
    • View Record
  • FINAL ADDENDUM 4 TO THE FINAL AMENDED SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN) FOR BASEWIDE GROUNDWATER MONITORING PROGRAM (CD COPY ENCLOSED) [SEE RECORD # 1643 - FINAL SAMPLING AND ANALYSIS PLAN]
    Site(s): BASEWIDE
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 06/06/2012
    • Report
    • Record#: 004465
    • View Record
  • FACT SHEET: SUMMER 2012 ENVIRONMENTAL CLEANUP ACTIVITY UPDATE (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL E2, PARCEL G, PARCEL UC1, PARCEL UC2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 06/01/2012
    • Fact Sheet
    • Record#: 005275
    • View Record
  • REVIEW AND COMMENTS ON THE RESPONSES TO COMMENTS ON THE DRAFT WORK PLAN, TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE (SEE RECORD # 4471 - RESPONSES TO COMMENTS ON THE DRAFT WORK PLAN)
    Site(s): PARCEL E2
  • TRANSMITTAL OF THE FINAL ACTION MEMORANDUM, TIME-CRITICAL REMOVAL ACTION FOR EXPERIMENTAL SHIP SHIELDING RANGE (ENCLOSURE IS RECORD # 4417)
    Site(s): PARCEL E2
  • REVIEW AND COMMENTS ON THE DRAFT WORK PLAN, TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE (SEE RECORD # 4380 - DRAFT WORK PLAN, TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE)
    Site(s): PARCEL E2
    • DTSC - BERKELEY, CA
    • 05/07/2012
    • Correspondence
    • Record#: 004480
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT WORK PLAN, TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE (SEE RECORD # 4380 - DRAFT WORK PLAN, TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE)
    Site(s): PARCEL E2
    • CRWQCB - OAKLAND, CA
    • 05/07/2012
    • Correspondence
    • Record#: 004481
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT WORK PLAN, TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE (SEE RECORD # 4380 - DRAFT WORK PLAN, TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE)
    Site(s): PARCEL E2
    • U.S. EPA - SAN FRANCISCO, CA
    • 05/07/2012
    • Correspondence
    • Record#: 004449
    • View Record
  • FINAL ACTION MEMORANDUM, TIME-CRITICAL REMOVAL ACTION FOR EXPERIMENTAL SHIP SHIELDING RANGE (CD COPY ENCLOSED) [SEE RECORD # 4416 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2
    • SHAW ENVIRONMENTAL, INC.
    • 05/01/2012
    • Report
    • Record#: 004417
    • View Record
  • FACT SHEET: PROGRAM OUTREACH ACHIEVEMENTS: JANUARY - MARCH 2012 (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/26/2012
    • Fact Sheet
    • Record#: 005271
    • View Record
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR JANUARY-MARCH 2012, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 4414)
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 04/25/2012
    • Correspondence
    • Record#: 004413
    • View Record
  • LANDFILL GAS MONITORING REPORT FOR JANUARY - MARCH 2012, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 4413 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2, SITE 00001, SITE 00021
  • FINAL RADIOLOGICAL CONSTRUCTION SUMMARY REPORT (INCLUDES ANALYTICAL DATA PROVIDED IN PAPER ONLY; AND CD COPY)
    Site(s): PARCEL E, SITE 00004
    • TETRA TECH EC, INC.
    • 04/18/2012
    • Report
    • Record#: 004381
    • View Record
  • TRANSMITTAL OF THE DRAFT WORK PLAN, TIME CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE (ENCLOSURE IS RECORD # 4380)
    Site(s): PARCEL E2
  • 11 APRIL 2012 COMMUNITY MEETING SUMMARY (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/11/2012
    • Minutes
    • Record#: 005266
    • View Record
  • TRANSMITTAL OF THE DRAFT SOIL EXCAVATION CHARACTERIZATION WORK PLAN (ENCLOSURE IS RECORD # 4376)
    Site(s): PARCEL E
    • BRAC PMO WEST
    • 04/09/2012
    • Correspondence
    • Record#: 004375
    • View Record
  • FACT SHEET: HUNTERS POINT OVERVIEW, PREPARING FOR TOMORROW (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL F, PARCEL G, PARCEL UC2, PARCEL UC3
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/02/2012
    • Fact Sheet
    • Record#: 005242
    • View Record
  • FACT SHEET: DRAFT RECORD OF DECISION SUMMARY OF RESPONSES TO COMMUNITY (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2012
    • Fact Sheet
    • Record#: 005245
    • View Record
  • TRANSMITTAL OF THE FINAL ADDENDUM 3 TO FINAL AMENDED SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN) FOR BASEWIDE GROUNDWATER MONITORING PROGRAM (ENCLOSURE IS RECORD # 4421)
    Site(s): BASEWIDE
    • BRAC PMO WEST
    • 03/21/2012
    • Correspondence
    • Record#: 004420
    • View Record
  • TRANSMITTAL OF THE FINAL ACTION MEMORANDUM, REMOVAL OF UNDERGROUND STORAGE TANK (UST) [ENCLOSURE IS RECORD # 4383]
    Site(s): PARCEL B, SITE 00042, UST 0000113A
    • BRAC PMO WEST
    • 03/16/2012
    • Correspondence
    • Record#: 004382
    • View Record
  • TRANSMITTAL OF THE DRAFT RECORD OF DECISION (ENCLOSURE IS RECORD # 4325)
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 03/14/2012
    • Correspondence
    • Record#: 004324
    • View Record
  • FINAL ACTION MEMORANDUM, REMOVAL OF UNDERGROUND STORAGE TANK (UST) [CD COPY ENCLOSED] {SEE RECORD # 4382 - BRAC PMO WEST TRANSMITTAL LETTER}
    Site(s): PARCEL B, SITE 00042, UST 0000113A
    • INNOVATIVE TECHNICAL SOLUTIONS, INC.
    • 03/01/2012
    • Report
    • Record#: 004383
    • View Record
  • FINAL PETROLEUM HYDROCARBON CORRECTIVE ACTION, FIRST QUARTER 2012 GROUNDWATER MONITORING REPORT, COMBINED SITE, PARCEL B
    Site(s): PARCEL B
  • TRANSMITTAL OF FINAL PETROLEUM HYDROCARBON CORRECTIVE ACTION, FIRST QUARTER 2012 GROUNDWATER MONITORING REPORT, COMBINED SITE, PARCEL B, DATED 28 FEBRUARY 2013
    Site(s): PARCEL B
  • REVISED FINAL ACCIDENT PREVENTION PLAN, BASEWIDE GROUNDWATER MONITORING PROGRAM (CD COPY ENCLOSED) {SEE RECORD # 2225 - FINAL ACCIDENT PREVENTION PLAN BASEWIDE GROUNDWATER MONITORING PROGRAM}
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2
  • TRANSMITTAL OF THE DRAFT WORK PLAN ADDENDUM TO THE GROUNDWATER TREATABILITY STUDY (ENCLOSURE IS RECORD # 4269)
    Site(s): PARCEL E
    • BRAC PMO WEST
    • 02/22/2012
    • Correspondence
    • Record#: 004268
    • View Record
  • 22 FEBRUARY 2012 FINAL COMMUNITY INFORMATIONAL MEETING SUMMARY (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL E2, PARCEL F
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 02/22/2012
    • Minutes
    • Record#: 005285
    • View Record
  • FINAL ADDENDUM 3 TO FINAL AMENDED SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN) FOR BASEWIDE GROUNDWATER MONITORING PROGRAM (CD COPY ENCLOSED)
    Site(s): BASEWIDE
  • FINAL BASEWIDE RADIOLOGICAL MANAGEMENT PLAN (CD COPY ENCLOSED) [THIS DOCUMENT SUPERSEDES RECORD # 4235 AND # 1987]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3
    • TETRA TECH EC, INC.
    • 02/03/2012
    • Report
    • Record#: 004293
    • View Record
  • TRANSMITTAL OF THE FINAL BASEWIDE RADIOLOGICAL MANAGEMENT PLAN (ENCLOSURE IS RECORD # 4293)
    Site(s): BASEWIDE
    • BRAC PMO WEST
    • 02/03/2012
    • Correspondence
    • Record#: 004292
    • View Record
  • FACT SHEET: COMPLETION OF PARCEL POLYCHLORINATED BIPHENYL (PCB) HOT SPOT AREA REMOVAL (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 02/01/2012
    • Fact Sheet
    • Record#: 005244
    • View Record
  • FACT SHEET: PROGRAM OUTREACH ACHIEVEMENTS - FALL 2011 (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/31/2012
    • Fact Sheet
    • Record#: 005243
    • View Record
  • FINAL TREATABILITY STUDY COMPLETION REPORT (INCLUDES RESPONSE TO COMMENTS FROM MULTIPLE AGENCIES ON THE DRAFT; AND CD COPY) [SEE RECORD # 4264 - BRAC PMO WEST TRANSMITTAL LETTER; AND RECORDS # 3641, # 3813, # 4262, AND # 4263 - COMMENTS]
    Site(s): PARCEL C, SITE 00025
    • CDM FEDERAL PROGRAMS CORPORATION
    • 01/27/2012
    • Report
    • Record#: 004265
    • View Record
  • TRANSMITTAL OF THE 1) FINAL TREATABILITY STUDY COMPLETION REPORT; AND 2) RESPONSES TO COMMENTS ON THE DRAFT TREATABILITY STUDY COMPLETION REPORT (ENCLOSURES 1 AND 2 ARE RECORD # 4265)
    Site(s): BASEWIDE
  • TRANSMITTAL OF THE LANDFILL GAS MONITORING REPORT FOR OCTOBER-DECEMBER 2011, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 3614)
    Site(s): PARCEL E2
  • FINAL LANDFILL GAS MONITORING REPORT FOR OCTOBER-DECEMBER 2011, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 4251 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2, SITE 00001, SITE 00021
  • FINAL TASK-SPECIFIC PLAN FOR THE FORMER 500 SERIES BUILDINGS AREA, FINAL STATUS SURVEY (CD COPY ENCLOSED)
    Site(s): PARCEL E
    • TETRA TECH EC, INC.
    • 01/19/2012
    • Report
    • Record#: 005704
    • View Record
  • 2012 CALENDAR OF COMMUNITY EVENTS (INCLUDES SPANISH AND CHINESE VERSIONS; AND CD COPY)
    Site(s): PARCEL E2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/01/2012
    • Correspondence
    • Record#: 005241
    • View Record
  • TRANSMITTAL OF THE DRAFT ACTION MEMORANDUM TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE (ENCLOSURE IS RECORD # 4245)
    Site(s): PARCEL E2
  • TRANSMITTAL OF THE FINAL EXECUTION PLAN, REVISION 1, BASEWIDE RADIOLOGICAL SUPPORT (ENCLOSURE IS RECORD # 4387)
    Site(s): BASEWIDE
  • FINAL EXECUTION PLAN, REVISION 1, BASEWIDE RADIOLOGICAL SUPPORT (CD COPY ENCLOSED) [SEE RECORD # 4386 - BRAC PMO WEST TRANSMITTAL LETTER; AND RECORD # 2537 - FINAL EXECUTION PLAN, BASEWIDE RADIOLOGICAL SUPPORT]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2
  • TRANSMITTAL OF THE DRAFT SAMPLING AND ANALYSIS PLAN, INTERIM MONITORING AND MAINTENANCE PROGRAM FOR THE LANDFILL GAS CONTROL SYSTEM, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 3636)
    Site(s): PARCEL E2, SITE 00001, SITE 00021
  • 07 DECEMBER 2011 COMMUNITY INFORMATIONAL MEETING SUMMARY (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL C, PARCEL D, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2, PARCEL UC3, SITE 00007, SITE 00018
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 12/07/2011
    • Minutes
    • Record#: 005238
    • View Record
  • REVISED FINAL MEMORANDUM: APPROACH FOR DEVELOPING SOIL GAS ACTION LEVELS FOR VAPOR INTRUSION EXPOSURE (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2
    • CHADUX - TT, JOINT VENTURE
    • 12/02/2011
    • Report
    • Record#: 004241
    • View Record
  • TRANSMITTAL OF THE REVISED FINAL MEMORANDUM: APPROACH FOR DEVELOPING SOIL GAS ACTION LEVELS FOR VAPOR INTRUSION EXPOSURE (ENCLOSURE IS RECORD # 4241)
    Site(s): BASEWIDE
  • FINAL TASK-SPECIFIC PLAN FOR THE BUILDING SCOPING SURVEY (CD COPY ENCLOSED)
    Site(s): BASEWIDE
    • TETRA TECH EC, INC.
    • 11/29/2011
    • Report
    • Record#: 005703
    • View Record
  • TRANSMITTAL OF THE DRAFT FINAL RADIOLOGICAL ADDENDUM TO THE FEASIBILITY STUDY REPORT (ENCLOSURE IS RECORD # 3628)
    Site(s): PARCEL E
  • REVIEW AND COMMENTS ON THE DRAFT TREATABILITY STUDY COMPLETION REPORT (SEE RECORD # 3577 - DRAFT TREATABILITY STUDY COMPLETION REPORT)
    Site(s): BASEWIDE
    • DTSC - BERKELEY, CA
    • 11/10/2011
    • Correspondence
    • Record#: 004262
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT TREATABILITY STUDY COMPLETION REPORT (SEE RECORD # 3577 - DRAFT TREATABILITY STUDY COMPLETION REPORT)
    Site(s): BASEWIDE
    • CRWQCB - OAKLAND, CA
    • 11/10/2011
    • Correspondence
    • Record#: 003813
    • View Record
  • TRANSMITTAL OF THE FINAL LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2011, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 3623)
    Site(s): PARCEL E2
  • REVIEW AND COMMENTS ON THE DRAFT TREATABILITY STUDY COMPLETION REPORT (SEE RECORD # 3577 - DRAFT TREATABILITY STUDY COMPLETION REPORT)
    Site(s): BASEWIDE
    • U.S. EPA - SAN FRANCISCO, CA
    • 11/09/2011
    • Correspondence
    • Record#: 004263
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT TREATABILITY STUDY COMPLETION REPORT (SEE RECORD # 3577 - DRAFT TREATABILITY STUDY COMPLETION REPORT)
    Site(s): BASEWIDE
    • DEPARTMENT OF PUBLIC HEALTH - SAN FRANCISCO, CA
    • 11/09/2011
    • Correspondence
    • Record#: 003641
    • View Record
  • LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2011, POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 3622 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2, SITE 00001, SITE 00021
  • MEMORANDUM: GROUNDWATER ANALYTICAL RESULTS EXCEEDING REMEDIATION GOALS OR TRIGGER LEVELS, THIRD QUARTER 2011 (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC1, PARCEL UC2, SITE 00007, SITE 00018
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 11/04/2011
    • Correspondence
    • Record#: 003615
    • View Record
  • NOTICE OF EXTENSION OF PROPOSED PLAN PUBLIC COMMENT PERIOD (CD COPY ENCLOSED) [SEE RECORD # 3597 - NOTICE OF PUBLIC COMMENT PERIOD ON THE PROPOSED PLAN]
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 10/27/2011
    • Public Notice
    • Record#: 003598
    • View Record
  • FINAL TASK-SPECIFIC PLAN FOR THE FORMER BUILDING SITE FINAL STATUS SURVEY (CD COPY ENCLOSED)
    Site(s): PARCEL E
    • TETRA TECH EC, INC.
    • 10/26/2011
    • Report
    • Record#: 005696
    • View Record
  • FINAL TASK-SPECIFIC PLAN FOR THE FORMER SHACK SITES FINAL STATUS SURVEY (CD COPY ENCLOSED)
    Site(s): PARCEL E
    • TETRA TECH EC, INC.
    • 10/26/2011
    • Report
    • Record#: 005695
    • View Record
  • FINAL TASK-SPECIFIC PLAN FOR THE FORMER BUILDING SITE FINAL STATUS SURVEY (CD COPY ENCLOSED)
    Site(s): PARCEL E
    • TETRA TECH EC, INC.
    • 10/05/2011
    • Report
    • Record#: 005693
    • View Record
  • PUBLIC NOTICE OF EXTENSION OF THE PROPOSED PLAN PUBLIC COMMENT PERIOD, COMMENT PERIOD EXTENDED TO 21 NOVEMBER 2011 (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • SAN FRANCISCO CHRONICLE - SAN FRANCISCO, CA
    • 10/02/2011
    • Public Notice
    • Record#: 003605
    • View Record
  • PUBLIC NOTICE OF EXTENSION OF THE PROPOSED PLAN PUBLIC COMMENT PERIOD, COMMENT PERIOD EXTENDED TO 21 NOVEMBER 2011 (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • SAN FRANCISCO BAY VIEW - SAN FRANCISCO, CA
    • 10/01/2011
    • Public Notice
    • Record#: 003606
    • View Record
  • PUBLIC NOTICE OF EXTENSION OF THE PROPOSED PLAN PUBLIC COMMENT PERIOD, COMMENT PERIOD EXTENDED TO 21 NOVEMBER 2011 (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • SUN-REPORTER - SAN FRANCISCO, CA
    • 09/29/2011
    • Public Notice
    • Record#: 003604
    • View Record
  • FINAL TASK-SPECIFIC PLAN FOR THE BUILDING FINAL STATUS SURVEY (CD COPY ENCLOSED)
    Site(s): PARCEL E
    • TETRA TECH EC, INC.
    • 09/28/2011
    • Report
    • Record#: 005690
    • View Record
  • TRANSMITTAL OF THE FINAL CORRECTION 2 EXPLOSIVES SAFETY SUBMISSION TIME CRITICAL REMOVAL ACTION FOR THE POLYCHLORINATED BIPHENYL HOT SPOT AREA AND FOR THE EXPERIMENTAL SHIP SHIELDING RANGE, REVISION 2 TO THE FINAL WORK PLAN
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 09/27/2011
    • Correspondence
    • Record#: 003634
    • View Record
  • TRANSMITTAL OF THE FINAL EXPLOSIVES SAFETY SUBMISSION TIME-CRITICAL REMOVAL ACTION FOR THE PCB HOT SPOT AREA AND TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE AND RADIOLOGICAL SURVEY FOR THE PANHANDLE AREA, REVISION 02
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 09/27/2011
    • Correspondence
    • Record#: 005691
    • View Record
  • FINAL TASK-SPECIFIC PLAN FOR THE FORMER BUILDING SITE FINAL STATUS SURVEY (CD COPY ENCLOSED)
    Site(s): PARCEL E
    • TETRA TECH EC, INC.
    • 09/27/2011
    • Report
    • Record#: 005689
    • View Record
  • FINAL TASK-SPECIFIC PLAN FOR THE FORMER BUILDING SITE FINAL STATUS SURVEY (CD COPY ENCLOSED)
    Site(s): PARCEL E
    • TETRA TECH EC, INC.
    • 09/20/2011
    • Report
    • Record#: 005688
    • View Record
  • TRANSMITTAL OF THE DRAFT ACTION MEMORANDUM REMOVAL OF UNDERGROUND STORAGE TANK (ENCLOSURE IS RECORD # 3574)(ENCLOSURE IS RECORD # 3574)(ENCLOSURE IS RECORD # 3574)
    Site(s): PARCEL B, SITE 00042, UST 0000113A
  • TRANSMITTAL OF 1) FINAL PROPOSED PLAN FOR CLEANUP OF PARCEL E-2; 2) FACT SHEET - SUMMARY OF PROPOSED CLEANUP; AND 3) FREQUENTLY ASKED QUESTIONS ABOUT THE SHIPYARD LANDFILL
    Site(s): PARCEL E2
  • PUBLIC NOTICE OF THE AVAILABILITY AND PUBLIC COMMENT PERIOD ON THE PROPOSED PLAN (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • SAN FRANCISCO CHRONICLE - SAN FRANCISCO, CA
    • 09/04/2011
    • Public Notice
    • Record#: 003617
    • View Record
  • NOTICE OF PUBLIC COMMENT PERIOD ON THE PROPOSED PLAN (CD COPY ENCLOSED) [SEE RECORD # 3598 - NOTICE OF EXTENSION OF PROPOSED PLAN PUBLIC COMMENT PERIOD]
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 09/02/2011
    • Public Notice
    • Record#: 003597
    • View Record
  • PUBLIC NOTICE OF THE AVAILABILITY AND PUBLIC COMMENT PERIOD ON THE PROPOSED PLAN (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • SAN FRANCISCO BAY VIEW - SAN FRANCISCO, CA
    • 09/01/2011
    • Public Notice
    • Record#: 003599
    • View Record
  • PUBLIC NOTICE OF THE AVAILABILITY AND PUBLIC COMMENT PERIOD ON THE PROPOSED PLAN (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • SUN-REPORTER - SAN FRANCISCO, CA
    • 09/01/2011
    • Public Notice
    • Record#: 003619
    • View Record
  • FACT SHEET - SUMMARY OF PROPOSED CLEANUP OF PARCEL E-2
    Site(s): PARCEL E2
    • ENGINEERING/REMEDIATION RESOURCES GROUP, INC.
    • 09/01/2011
    • Fact Sheet
    • Record#: 006040
    • View Record
  • FREQUENTLY ASKED QUESTIONS ABOUT THE SHIPYARD LANDFILL AT PARCEL E-2
    Site(s): PARCEL E2
    • ENGINEERING/REMEDIATION RESOURCES GROUP, INC.
    • 09/01/2011
    • Fact Sheet
    • Record#: 006041
    • View Record
  • FINAL PROPOSED PLAN FOR CLEANUP OF PARCEL E-2
    Site(s): PARCEL E2
    • ENGINEERING/REMEDIATION RESOURCES GROUP, INC.
    • 09/01/2011
    • Report
    • Record#: 003580
    • View Record
  • FINAL EXPLOSIVES SAFETY SUBMISSION TIME-CRITICAL REMOVAL ACTION FOR THE PCB HOT SPOT AREA AND TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE AND RADIOLOGICAL SURVEY FOR THE PANHANDLE AREA, REVISION 02 (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • SHAW ENVIRONMENTAL AND INFRASTRUCTURE, INC.
    • 09/01/2011
    • Report
    • Record#: 005692
    • View Record
  • PUBLIC NOTICE OF THE AVAILABILITY AND PUBLIC COMMENT PERIOD ON THE PROPOSED PLAN (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • SAN FRANCISCO BAY VIEW - SAN FRANCISCO, CA
    • 09/01/2011
    • Public Notice
    • Record#: 003618
    • View Record
  • WORK PLAN FOR NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM STORM WATER POLLUTION PREVENTION AND MONITORING 2011/2012 MONITORING YEAR (PUBLIC DOCUMENT)
    Site(s): BASEWIDE
    • ACCORD - MACTEC, JOINT VENTURE
    • 09/01/2011
    • Report
    • Record#: 005794
    • View Record
  • RESPONSES TO COMMENTS ON THE DRAFT FINAL PROPOSED PLAN (W/ ENCLOSURES) [SEE RECORDS # 4346 THROUGH # 4349 - REVIEW AND COMMENTS]
    Site(s): PARCEL E2, SITE 00007, SITE 00018
    • BRAC PMO WEST
    • 08/24/2011
    • Correspondence
    • Record#: 004350
    • View Record
  • FINAL WORK PLAN SITE CHARACTERIZATION AND BENCH-SCALE TREATABILITY STUDY (CD COPY ENCLOSED) [SEE RECORD # 3631 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E, SITE 00003
  • TRANSMITTAL OF THE FINAL WORK PLAN SITE CHARACTERIZATION AND BENCH-SCALE TREATABILITY STUDY (ENCLOSURE IS RECORD # 3632)
    Site(s): PARCEL E, SITE 00003
  • REVIEW AND COMMENTS ON THE DRAFT TECHNICAL MEMORANDUM SOIL VAPOR INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT (SEE RECORD # 3608 - DRAFT TECHNICAL MEMORANDUM SOIL VAPOR INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT)
    Site(s): PARCEL B, PARCEL D-1, PARCEL G, PARCEL UC2
    • U.S. EPA - SAN FRANCISCO, CA
    • 08/17/2011
    • Correspondence
    • Record#: 004636
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT TECHNICAL MEMORANDUM SOIL VAPOR INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT (INCLUDES REVIEW AND COMMENTS BY K. DAY DATED 15 AUGUST 2011) [SEE RECORD # 3608 - DRAFT TECHNICAL MEMORANDUM SOIL VAPOR INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT]
    Site(s): PARCEL B, PARCEL D-1, PARCEL G, PARCEL UC2
    • DTSC - BERKELEY, CA
    • 08/16/2011
    • Correspondence
    • Record#: 004637
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT TECHNICAL MEMORANDUM SOIL VAPOR INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT (SEE RECORD # 3608 - DRAFT TECHNICAL MEMORANDUM SOIL VAPOR INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT)
    Site(s): PARCEL B, PARCEL D-1, PARCEL G, PARCEL UC2
    • DEPARTMENT OF PUBLIC HEALTH - SAN FRANCISCO, CA
    • 08/15/2011
    • Correspondence
    • Record#: 004635
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT FINAL PROPOSED PLAN (SEE RECORD # 4345 - DRAFT FINAL PROPOSED PLAN)
    Site(s): PARCEL E2
    • DTSC - BERKELEY, CA
    • 08/12/2011
    • Correspondence
    • Record#: 004348
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT TECHNICAL MEMORANDUM SOIL VAPOR INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT (SEE RECORD # 3608 - DRAFT TECHNICAL MEMORANDUM SOIL VAPOR INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT)
    Site(s): PARCEL B, PARCEL D-1, PARCEL D-2, PARCEL G, PARCEL UC1, PARCEL UC2
    • CRWQCB - OAKLAND, CA
    • 08/11/2011
    • Correspondence
    • Record#: 004634
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT FINAL PROPOSED PLAN (SEE RECORD # 4345 - DRAFT FINAL PROPOSED PLAN)
    Site(s): PARCEL E2
    • DEPARTMENT OF PUBLIC HEALTH - SAN FRANCISCO, CA
    • 08/11/2011
    • Correspondence
    • Record#: 004347
    • View Record
  • TRANSMITTAL OF THE FINAL LANDFILL GAS MONITORING REPORT FOR APRIL-JUNE 2011, POST-REMOVAL ACTION INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 3564)
    Site(s): PARCEL E2
  • TRANSMITTAL OF THE MEMORANDUM: GROUNDWATER ANALYTICAL RESULTS EXCEEDING REMEDIATION GOALS OR TRIGGER LEVELS, SECOND QUARTER 2011 (ENCLOSURE IS RECORD # 3554)
    Site(s): BASEWIDE
    • BRAC PMO WEST
    • 08/10/2011
    • Correspondence
    • Record#: 003575
    • View Record
  • FINAL LANDFILL GAS MONITORING REPORT FOR APRIL-JUNE 2011, POST-REMOVAL ACTION INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 3563 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2
    • INNOVATIVE TECHNICAL SOLUTIONS, INC.
    • 08/10/2011
    • Report
    • Record#: 003564
    • View Record
  • TRANSMITTAL OF THE FINAL ADDENDUM 2 TO FINAL AMENDED SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN) FOR BASEWIDE GROUNDWATER MONITORING PROGRAM (ENCLOSURE IS RECORD # 3560)
    Site(s): BASEWIDE
  • MEMORANDUM: GROUNDWATER ANALYTICAL RESULTS EXCEEDING REMEDIATION GOALS OR TRIGGER LEVELS, SECOND QUARTER 2011 (CD COPY ENCLOSED) [SEE RECORD # 3575 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC1, PARCEL UC2, SITE 00007, SITE 00018
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 08/05/2011
    • Correspondence
    • Record#: 003554
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT FINAL PROPOSED PLAN (SEE RECORD # 4345 - DRAFT FINAL PROPOSED PLAN)
    Site(s): PARCEL E2
    • CALIFORNIA DEPARTMENT OF PUBLIC HEALTH - SACRAMENTO, CA
    • 08/04/2011
    • Correspondence
    • Record#: 004346
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT FINAL PROPOSED PLAN (SEE RECORD # 4345 - DRAFT FINAL PROPOSED PLAN)
    Site(s): PARCEL E2, SITE 00007, SITE 00018
    • U.S. EPA - SAN FRANCISCO, CA
    • 08/04/2011
    • Correspondence
    • Record#: 004349
    • View Record
  • FINAL WORK PLAN FOR RADIOLOGICAL DATA GAP INVESTIGATION (CD COPY ENCLOSED) [SEE RECORD # 3602 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL F, SITE 00023, SITE 00026
  • TRANSMITTAL OF THE FINAL WORK PLAN FOR RADIOLOGICAL DATA GAP INVESTIGATION (ENCLOSURE IS RECORD # 3603)
    Site(s): PARCEL F
  • FINAL ADDENDUM 2 TO FINAL AMENDED SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN) FOR BASEWIDE GROUNDWATER MONITORING PROGRAM (CD COPY ENCLOSED)
    Site(s): BASEWIDE
  • FINAL TASK-SPECIFIC PLAN FOR FORMER BUILDING 508 SITE, FINAL STATUS SURVEY, PARCEL E, 500 SERIES AREA
    Site(s): PARCEL E
    • TETRA TECH EC, INC.
    • 07/13/2011
    • Report
    • Record#: 005761
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT PROPOSED PLAN (SEE RECORD # 2771 - DRAFT PROPOSED PLAN)
    Site(s): PARCEL E2
    • CALIFORNIA DEPARTMENT OF RESOURCES RECYCLING AND RECOVERY (CALRECYCLE) - SACRAMENTO, CA
    • 07/12/2011
    • Correspondence
    • Record#: 004302
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT PROPOSED PLAN (SEE RECORD # 2771 - DRAFT PROPOSED PLAN)
    Site(s): PARCEL E2
    • CRWQCB - OAKLAND, CA
    • 07/11/2011
    • Correspondence
    • Record#: 004306
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT PROPOSED PLAN (SEE RECORD # 2771 - DRAFT PROPOSED PLAN)
    Site(s): PARCEL E2
    • DEPARTMENT OF PUBLIC HEALTH - SAN FRANCISCO, CA
    • 07/11/2011
    • Correspondence
    • Record#: 004303
    • View Record
  • TRANSMITTAL OF THE DRAFT FINAL FEASIBILITY STUDY REPORT (ENCLOSURE IS RECORD # 3316)
    Site(s): PARCEL E
  • REVIEW AND COMMENTS ON THE DRAFT PROPOSED PLAN (SEE RECORD # 2771 - DRAFT PROPOSED PLAN)
    Site(s): PARCEL E2
    • U.S. EPA - SAN FRANCISCO, CA
    • 07/08/2011
    • Correspondence
    • Record#: 004305
    • View Record
  • TRANSMITTAL OF THE FINAL WORK PLAN FOR GEOTECHNICAL INVESTIGATION (ENCLOSURE IS RECORD # 3440)
    Site(s): SITE 00001, SITE 00021, SITE 00026
    • BRAC PMO WEST
    • 07/08/2011
    • Correspondence
    • Record#: 003412
    • View Record
  • FINAL WORK PLAN FOR GEOTECHNICAL INVESTIGATION (CD COPY ENCLOSED) [SEE RECORD # 3412 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): SITE 00001, SITE 00021, SITE 00026
    • ENGINEERING/REMEDIATION RESOURCES GROUP, INC.
    • 07/08/2011
    • Report
    • Record#: 003440
    • Request for Record
  • TRANSMITTAL OF THE DRAFT TECHNICAL MEMORANDUM SOIL VAPOR INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT (ENCLOSURE IS RECORD # 3608)
    Site(s): PARCEL B, PARCEL D-1, PARCEL G, PARCEL UC2
  • TRANSMITTAL OF DRAFT FINAL FINDING OF SUITABILITY TO TRANSFER, DATED 29 JUNE 2011 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-2
  • REVIEW AND COMMENTS ON THE DRAFT PROPOSED PLAN (SEE RECORD # 2771 - DRAFT PROPOSED PLAN)
    Site(s): PARCEL E2
    • DTSC - BERKELEY, CA
    • 06/29/2011
    • Correspondence
    • Record#: 004304
    • View Record
  • TRANSMITTAL OF THE APPENDIX H - FINAL MATERIAL POTENTIALLY PRESENTING AN EXPLOSIVE HAZARD PROCEDURES, REVISION 1 TO THE FINAL WORK PLAN ADDENDUM TIME-CRITICAL REMOVAL ACTION FOR THE POLYCHLORINATED BIPHENYL HOT SPOT AREA
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 06/28/2011
    • Correspondence
    • Record#: 003633
    • View Record
  • FINAL TASK-SPECIFIC PLAN FOR FORMER BUILDING 517 SITE, FINAL STATUS SURVEY, PARCEL E, 500 SERIES AREA
    Site(s): PARCEL E
    • TETRA TECH EC, INC.
    • 06/23/2011
    • Report
    • Record#: 005758
    • View Record
  • TRANSMITTAL OF FINAL CRISP ROAD UTILITIES COMPLETION REPORT, DATED 22 JUNE 2011 (PUBLIC DOCUMENT)
    Site(s): PARCEL UC3
    • BRAC PMO WEST
    • 06/22/2011
    • Correspondence
    • Record#: 003302
    • View Record
  • FINAL CRISP ROAD UTILITIES COMPLETION REPORT (PUBLIC DOCUMENT)
    Site(s): PARCEL E2, PARCEL UC3
    • TETRA TECH EC, INC.
    • 06/22/2011
    • Report
    • Record#: 003303
    • View Record
  • SEMIANNUAL GROUNDWATER MONITORING REPORT, OCTOBER 2010 - MARCH 2011 (PUBLIC DOCUMENT)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL UC2, SITE 00004, SITE 00007, SITE 00012, SITE 00018
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 06/21/2011
    • Report
    • Record#: 003297
    • View Record
  • FINAL TASK-SPECIFIC PLAN FOR FORMER BUILDING 509 SITE, FINAL STATUS SURVEY, PARCEL E, 500 SERIES AREA
    Site(s): PARCEL E
    • TETRA TECH EC, INC.
    • 06/17/2011
    • Report
    • Record#: 005760
    • View Record
  • FINAL TASK-SPECIFIC PLAN FOR FORMER BUILDING 507 SITE, FINAL STATUS SURVEY, PARCEL E, 500 SERIES AREA
    Site(s): PARCEL E
    • TETRA TECH EC, INC.
    • 06/16/2011
    • Report
    • Record#: 005759
    • View Record
  • TRANSMITTAL OF THE FINAL IN SITU ANAEROBIC BIOREMEDIATION TREATABILITY STUDY COMPLETION REPORT (ENCLOSURE IS RECORD # 3540)
    Site(s): BASEWIDE
  • FINAL IN SITU ANAEROBIC BIOREMEDIATION TREATABILITY STUDY COMPLETION REPORT (CD COPY ENCLOSED) [SEE RECORD # 3539 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): BASEWIDE
    • ONEIDA TOTAL INTEGRATED ENTERPRISES
    • 06/08/2011
    • Report
    • Record#: 003540
    • View Record
  • TRANSMITTAL OF THE FINAL EXPLOSIVES SAFETY SUBMISSION TIME-CRITICAL REMOVAL ACTION FOR THE PCB HOT SPOT AREA AND TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE AND RADIOLOGICAL SURVEY FOR THE PANHANDLE AREA, REVISION 01
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 06/07/2011
    • Correspondence
    • Record#: 005685
    • View Record
  • FINAL TASK-SPECIFIC PLAN FOR THE FORMER BUILDING SITE FINAL STATUS SURVEY (CD COPY ENCLOSED)
    Site(s): PARCEL E
    • TETRA TECH EC, INC.
    • 06/02/2011
    • Report
    • Record#: 005687
    • View Record
  • TRANSMITTAL OF THE FINAL COMMUNITY INVOLVEMENT PLAN (ENCLOSURE IS RECORD # 2910)
    Site(s): BASEWIDE
  • FINAL EXPLOSIVES SAFETY SUBMISSION TIME-CRITICAL REMOVAL ACTION FOR THE PCB HOT SPOT AREA AND TIME-CRITICAL REMOVAL ACTION FOR THE EXPERIMENTAL SHIP SHIELDING RANGE AND RADIOLOGICAL SURVEY FOR THE PANHANDLE AREA, REVISION 01 (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • SHAW ENVIRONMENTAL AND INFRASTRUCTURE, INC.
    • 05/24/2011
    • Report
    • Record#: 005686
    • View Record
  • TRANSMITTAL OF THE DRAFT PROPOSED PLAN (ENCLOSURE IS RECORD # 2771)
    Site(s): PARCEL E2
    • BRAC PMO WEST
    • 05/24/2011
    • Correspondence
    • Record#: 002770
    • View Record
  • TRANSMITTAL OF DRAFT WORK PLAN SITE CHARACTERIZATION AND BENCH-SCALE TREATABILITY STUDY, DATED 01 MAY 2011
    Site(s): PARCEL E, SITE 00003
  • FINAL GROUNDWATER TREATABILITY STUDY TECHNICAL REPORT (CD COPY ENCLOSED) [SEE RECORD # 2905 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E, SITE 00004, SITE 00005, SITE 00012A, SITE 00012B, SITE 00012C, SITE 00036, SITE 00039, SITE 00056
    • SHAW ENVIRONMENTAL, INC.
    • 05/16/2011
    • Report
    • Record#: 002907
    • View Record
  • TRANSMITTAL OF THE FINAL GROUNDWATER TREATABILITY STUDY TECHNICAL (ENCLOSURE IS RECORD # 2907)REPORT
    Site(s): PARCEL E
  • TRANSMITTAL OF THE FINAL LANDFILL GAS MONITORING REPORT FOR JANUARY-MARCH 2011, POST-REMOVAL ACTION INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 2790)
    Site(s): PARCEL E2
  • FINAL LANDFILL GAS MONITORING REPORT FOR JANUARY-MARCH 2011, POST-REMOVAL ACTION INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 2789 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2, SITE 00001, SITE 00021
    • INNOVATIVE TECHNICAL SOLUTIONS, INC.
    • 05/12/2011
    • Report
    • Record#: 002790
    • View Record
  • TRANSMITTAL OF THE FINAL AMENDED SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN) FOR BASEWIDE GROUNDWATER MONITORING PROGRAM (ENCLOSURE IS RECORD # 2973)
    Site(s): BASEWIDE
  • FINAL RADIOLOGICAL ADDENDUM TO THE REMEDIAL INVESTIGATION/FEASIBILITY STUDY REPORT (INCLUDES REPLACEMENT PAGES TO THE RADIOLOGICAL ADDENDUM DATED 04 MARCH 2011; AND CD COPY)
    Site(s): PARCEL E2, SITE 00001, SITE 00002, SITE 00021
    • ENGINEERING/REMEDIATION RESOURCES GROUP, INC.
    • 05/05/2011
    • Report
    • Record#: 004260
    • View Record
  • TRANSMITTAL OF THE FINAL REMEDIAL INVESTIGATION/FEASIBILITY STUDY REPORT (ENCLOSURE IS RECORD # 4237)
    Site(s): PARCEL E2
  • TRANSMITTAL OF THE REPLACEMENT PAGES FOR THE FINAL RADIOLOGICAL ADDENDUM TO THE REMEDIAL INVESTIGATION/FEASIBILITY STUDY REPORT DATED 04 MARCH 2011 (ENCLOSURE IS RECORD # 4260)
    Site(s): PARCEL E2
  • TRANSMITTAL OF THE FINAL PROJECT WORK PLAN, REVISION 1 (ENCLOSURE IS RECORD # 2769)
    Site(s): PARCEL D-1
  • TRANSMITTAL OF THE MEMORANDUM: GROUNDWATER ANALYTICAL RESULTS EXCEEDING REMEDIATION GOALS OR TRIGGER LEVELS, FIRST QUARTER 2011 (CD COPY ENCLOSED) [ENCLOSURE IS RECORD # 2774]
    Site(s): BASEWIDE
    • BRAC PMO WEST
    • 05/04/2011
    • Correspondence
    • Record#: 002772
    • View Record
  • MEMORANDUM: GROUNDWATER ANALYTICAL RESULTS EXCEEDING REMEDIATION GOALS OR TRIGGER LEVELS, FIRST QUARTER 2011 (CD COPY ENCLOSED) [SEE RECORD # 2772 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC1, PARCEL UC2, SITE 00007, SITE 00018
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 05/03/2011
    • Correspondence
    • Record#: 002774
    • View Record
  • FINAL REMEDIAL INVESTIGATION /FEASIBILITY STUDY REPORT, VOLUMES I THROUGH III OF III (INCLUDES PUBLIC SUMMARY ON THE DRAFT FINAL FEASIBILITY STUDY REPORT; AND CD COPY)
    Site(s): PARCEL E2
    • ENGINEERING/REMEDIATION RESOURCES GROUP, INC.
    • 05/01/2011
    • Report
    • Record#: 004237
    • View Record
  • FINAL COMMUNITY INVOLVEMENT PLAN (CD COPY ENCLOSED) [SEE RECORD # 2908 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL B, PARCEL C, PARCEL D, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC1, PARCEL UC2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 05/01/2011
    • Report
    • Record#: 002910
    • View Record
  • FINAL AMENDED SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN) FOR BASEWIDE GROUNDWATER MONITORING PROGRAM (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC2
  • COMMENTS ON DRAFT FINDING OF SUITABILITY TO TRANSFER (FOST) FOR PARCELS UC-1 AND UC-2, DATED 11 FEBRUARY 2011 (PUBLIC DOCUMENT)
    Site(s): PARCEL UC1, PARCEL UC2
    • DEPARTMENT OF PUBLIC HEALTH - SAN FRANCISCO, CA
    • 03/29/2011
    • Correspondence
    • Record#: 004728
    • View Record
  • COMMENTS ON DRAFT FINDING OF SUITABILITY TO TRANSFER (FOST) FOR PARCELS UC-1 AND UC-2, DATED 11 FEBRUARY 2011 (PUBLIC DOCUMENT)
    Site(s): PARCEL UC1, PARCEL UC2
    • U.S. EPA - SAN FRANCISCO, CA
    • 03/29/2011
    • Correspondence
    • Record#: 004725
    • View Record
  • 23 MARCH 2011 COMMUNITY INFORMATIONAL MEETING SUMMARY (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 03/23/2011
    • Minutes
    • Record#: 005237
    • View Record
  • FINAL PROJECT WORK PLAN, REVISION 1, STORM DRAIN AND SANITARY SEWER REMOVAL (INCLUDES SAMPLING AND ANALYSIS PLAN, AND CD COPY) [SEE RECORD # 2768 - BRAC PMO WEST TRANSMITTAL LETTER, AND RECORD # 2078 - FINAL PROJECT WORK PLAN]
    Site(s): PARCEL D-1
    • SHAW ENVIRONMENTAL, INC.
    • 03/21/2011
    • Report
    • Record#: 002769
    • View Record
  • FINAL RADIOLOGICAL WORK PLAN, REVISION 1 (INCLUDES FINAL SAMPLING AND ANALYSIS PLAN, AND CD COPY)
    Site(s): PARCEL D-1
    • SHAW ENVIRONMENTAL, INC.
    • 03/21/2011
    • Report
    • Record#: 002767
    • View Record
  • TRANSMITTAL OF THE MEMORANDUM: GROUNDWATER ANALYTICAL RESULTS EXCEEDING REMEDIATION GOALS OR TRIGGER LEVELS, FOURTH QUARTER 2010 (CD COPY ENCLOSED) [ENCLOSURE IS RECORD # 2541]
    Site(s): BASEWIDE
    • BRAC PMO WEST
    • 03/10/2011
    • Correspondence
    • Record#: 002540
    • View Record
  • COMMENTS ON DRAFT FINDING OF SUITABILITY TO TRANSFER (FOST) FOR PARCELS UC-1 AND UC-2, DATED 11 FEBRUARY 2011 (PUBLIC DOCUMENT)
    Site(s): PARCEL UC1, PARCEL UC2
    • DTSC - BERKELEY, CA
    • 03/10/2011
    • Correspondence
    • Record#: 004726
    • View Record
  • COMMENTS FROM DTSC-BERKELEY ON FINAL LAND USE CONTROL REMEDIAL DESIGN, DATED 5 JULY 2011 (PUBLIC DOCUMENT)
    Site(s): PARCEL B
    • DTSC - BERKELEY, CA
    • 03/09/2011
    • Correspondence
    • Record#: 003305
    • View Record
  • COMMENTS ON DRAFT FINDING OF SUITABILITY TO TRANSFER (FOST) FOR PARCELS UC-1 AND UC-2, DATED 11 FEBRUARY 2011 (PUBLIC DOCUMENT)
    Site(s): PARCEL UC1, PARCEL UC2
    • CRWQCB - OAKLAND, CA
    • 03/09/2011
    • Correspondence
    • Record#: 004727
    • View Record
  • TRANSMITTAL OF THE DRAFT COMMUNITY INVOLVEMENT PLAN (ENCLOSURE IS RECORD # 2562)
    Site(s): BASEWIDE
  • TRANSMITTAL OF THE FINAL RADIOLOGICAL ADDENDUM TO THE REMEDIAL INVESTIGATION/FEASIBILITY STUDY REPORT (ENCLOSURE IS RECORD # 4260)
    Site(s): PARCEL E2
  • MEMORANDUM: GROUNDWATER ANALYTICAL RESULTS EXCEEDING REMEDIATION GOALS OR TRIGGER LEVELS, FOURTH QUARTER 2010 (CD COPY ENCLOSED) [SEE RECORD # 2540 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL C, PARCEL D-1, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC1, PARCEL UC2
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 03/04/2011
    • Correspondence
    • Record#: 002541
    • View Record
  • TRANSMITTAL OF THE DRAFT GROUNDWATER TREATABILITY STUDY TECHNICAL REPORT (ENCLOSURE IS RECORD # 2437)
    Site(s): PARCEL E
  • REVIEW AND COMMENTS ON THE RESPONSES TO COMMENTS ON THE DRAFT FINAL RADIOLOGICAL ADDENDUM TO THE REMEDIAL INVESTIGATION/FEASIBILITY STUDY REPORT (CD COPY ENCLOSED)
    Site(s): PARCEL E2
    • CALIFORNIA DEPARTMENT OF PUBLIC HEALTH - SACRAMENTO, CA
    • 02/11/2011
    • Correspondence
    • Record#: 002743
    • View Record
  • SEMIANNUAL GROUNDWATER MONITORING REPORT (APRIL - SEPTEMBER 2010) [CD COPY ENCLOSED]
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC1, PARCEL UC2, SITE 00007, SITE 00018
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 02/01/2011
    • Report
    • Record#: 002744
    • View Record
  • TRANSMITTAL OF THE DRAFT IN SITU ANAEROBIC BIOREMEDIATION TREATABILITY STUDY COMPLETION REPORT (ENCLOSURE IS RECORD # 3538)
    Site(s): BASEWIDE
  • TRANSMITTAL OF THE FINAL EXECUTION PLAN, BASEWIDE RADIOLOGICAL SUPPORT (ENCLOSURE IS RECORD # 2537)
    Site(s): BASEWIDE
  • FINAL EXECUTION PLAN, BASEWIDE RADIOLOGICAL SUPPORT (CD COPY ENCLOSED) [SEE RECORD # 2536 - BRAC PMO WEST TRANSMITTAL LETTER; AND RECORD # 4387 - FINAL EXECUTION PLAN, REVISION 1, BASEWIDE RADIOLOGICAL SUPPORT]
    Site(s): BASEWIDE
    • TETRA TECH EC, INC.
    • 01/21/2011
    • Report
    • Record#: 002537
    • View Record
  • FINAL EXECUTION PLAN, 500 SERIES AREA RADIOLOGICAL REMEDIATION AND SUPPORT
    Site(s): PARCEL E
  • TRANSMITTAL OF THE FINAL EXECUTION PLAN, 500 SERIES AREA RADIOLOGICAL REMEDIATION AND SUPPORT (ENCLOSURE IS RECORD # 2535)
    Site(s): PARCEL E
  • COMMENTS FROM SAN FRANCISCO CITY AND COUNTY DEPARTMENT OF PUBLIC HEALTH-SAN FRANCISCO ON FINAL LAND USE CONTROL REMEDIAL DESIGN, DATED 5 JULY 2011 (PUBLIC DOCUMENT)
    Site(s): PARCEL B
    • SAN FRANCISCO CITY AND COUNTY DEPARTMENT OF PUBLIC HEALTH - SAN FRANCISCO, CA
    • 01/12/2011
    • Correspondence
    • Record#: 003304
    • View Record
  • TRANSMITTAL OF THE MEMORANDUM: GROUNDWATER ANALYTICAL RESULTS EXCEEDING REMEDIATION GOALS OR TRIGGER LEVELS, THIRD QUARTER 2010 (CD COPY ENCLOSED) [ENCLOSURE IS RECORD # 2539]
    Site(s): BASEWIDE
    • BRAC PMO WEST
    • 01/10/2011
    • Correspondence
    • Record#: 002538
    • View Record
  • TRANSMITTAL OF THE FINAL PIER DEMOLITION WORK PLAN (ENCLOSURE IS RECORD # 2293)
    Site(s): BASEWIDE
  • FINAL ACCIDENT PREVENTION PLAN/SITE SAFETY AND HEALTH PLAN, BASEWIDE RADIOLOGICAL SUPPORT (CD COPY ENCLOSED)
    Site(s): BASEWIDE
    • TETRA TECH EC, INC.
    • 01/07/2011
    • Report
    • Record#: 002448
    • View Record
  • TRANSMITTAL OF THE DRAFT WORK PLAN FOR GEOTECHNICAL INVESTIGATION (ENCLOSURE IS RECORD # 2345)
    Site(s): SITE 00001, SITE 00021, SITE 00026
  • FACT SHEET: REMEDIAL ACTION (CD COPY ENCLOSED)
    Site(s): PARCEL B, SITE 00007, SITE 00018
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/01/2011
    • Fact Sheet
    • Record#: 005232
    • View Record
  • FACT SHEET: COMMUNITY PARTNERING (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL C, PARCEL D-1, PARCEL D-2, PARCEL E, PARCEL E2, PARCEL F, PARCEL G, PARCEL UC1, PARCEL UC2
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/01/2011
    • Fact Sheet
    • Record#: 005231
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN/SITE SAFETY AND HEALTH PLAN, 500 SERIES AREA RADIOLOGICAL REMEDIATION AND SUPPORT (CD COPY ENCLOSED)
    Site(s): PARCEL E
  • TRANSMITTAL OF THE FINAL WORK PLAN FOR SOIL GAS INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT (ENCLOSURE IS RECORD # 3544)
    Site(s): PARCEL B, PARCEL D-1, PARCEL G, PARCEL UC2
    • BRAC PMO WEST
    • 12/17/2010
    • Correspondence
    • Record#: 003543
    • View Record
  • RESPONSES TO COMMENTS ON THE DRAFT FINAL RECORD OF DECISION
    Site(s): PARCEL C, PARCEL G
    • CHADUX - TT, JOINT VENTURE
    • 12/10/2010
    • Correspondence
    • Record#: 002121
    • View Record
  • FINAL WORK PLAN FOR SOIL GAS INVESTIGATION IN SUPPORT OF VAPOR INTRUSION ASSESSMENT (CD COPY ENCLOSED)
    Site(s): PARCEL B, PARCEL D-1, PARCEL G, PARCEL UC2
    • SEALASKA ENVIRONMENTAL SERVICES, LLC
    • 12/01/2010
    • Report
    • Record#: 003544
    • View Record
  • FINAL PIER DEMOLITION WORK PLAN (INCLUDES RESPONSES TO COMMENTS ON THE DRAFT PIER DEMOLITION WORK PLAN; 25 AUGUST 2010 ACTION ITEMS PIER DEMOLITION TECHNICAL MEETING; AND CD COPY) [SEE RECORD # 2292 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL F
  • FINAL BASEWIDE DUST CONTROL PLAN, REVISION 1 (CD COPY ENCLOSED) [SEE RECORD # 2223 - BRAC PMO WEST TRANSMITTAL LETTER, AND RECORD # 1599 - FINAL BASEWIDE DUST CONTROL PLAN]
    Site(s): BASEWIDE
  • TRANSMITTAL OF THE FINAL BASEWIDE DUST CONTROL PLAN, REVISION 1 (ENCLOSURE IS RECORD # 2224)
    Site(s): BASEWIDE
  • FINAL STORMWATER POLLUTION PREVENTION PLAN (CD COPY ENCLOSED) [SEE RECORD # 2335 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL C, PARCEL D-1, PARCEL E, PARCEL UC3, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00008, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017, SITE 00025, SITE 00027, SITE 00028, SITE 00029, SITE 00030, SITE 00032, SITE 00035, SITE 00036, SITE 00038, SITE 00039, SITE 00053, SITE 00054, SITE 00055, SITE 00056, SITE 00058, SITE 00063, SITE 00064, SITE 00068, SITE 00069, SITE 00070, SITE 00072, SITE 00073
    • TETRA TECH EC, INC.
    • 11/19/2010
    • Report
    • Record#: 002336
    • View Record
  • TRANSMITTAL OF THE FINAL STORMWATER POLLUTION PREVENTION PLAN (ENCLOSURE IS RECORD # 2336)
    Site(s): BASEWIDE
  • REVIEW AND COMMENTS ON THE DRAFT PIER DEMOLITION WORK PLAN (SEE RECORD # 2244 - DRAFT PIER DEMOLITION WORK PLAN)
    Site(s): BASEWIDE
  • MEMORANDUM: GROUNDWATER ANALYTICAL RESULTS EXCEEDING REMEDIATION GOALS OR TRIGGER LEVELS, THIRD QUARTER 2010 (CD COPY ENCLOSED) [SEE RECORD # 2538 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL B, PARCEL C, PARCEL E, PARCEL E2, PARCEL G, PARCEL UC2, SITE 00007, SITE 00018
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 11/10/2010
    • Correspondence
    • Record#: 002539
    • View Record
  • MEMORANDUM: GROUNDWATER ANALYTICAL RESULTS EXCEEDING REMEDIATION GOALS OR TRIGGER LEVELS, SECOND QUARTER 2010 (CD COPY ENCLOSED)
    Site(s): PARCEL B, SITE 00007, SITE 00018
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 11/10/2010
    • Correspondence
    • Record#: 002113
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT PIER DEMOLITION WORK PLAN (CD COPY ENCLOSED) [SEE RECORD # 2244 - DRAFT PIER DEMOLITION WORK PLAN]
    Site(s): BASEWIDE
    • CRWQCB - SAN FRANCISCO, CA
    • 11/08/2010
    • Correspondence
    • Record#: 002290
    • View Record
  • TRANSMITTAL OF THE FINAL LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2010 POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (ENCLOSURE IS RECORD # 2124)
    Site(s): PARCEL E2
  • FINAL ACCIDENT PREVENTION PLAN BASEWIDE GROUNDWATER MONITORING PROGRAM (CD COPY ENCLOSED) [SEE RECORD # 4326 - REVISED FINAL ACCIDENT PREVENTION PLAN]
    Site(s): BASEWIDE
  • FINAL LANDFILL GAS MONITORING REPORT FOR JULY-SEPTEMBER 2010 POST-REMOVAL ACTION, INDUSTRIAL LANDFILL (CD COPY ENCLOSED) [SEE RECORD # 2123 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL E2, SITE 00001, SITE 00021
    • INNOVATIVE TECHNICAL SOLUTIONS, INC.
    • 10/29/2010
    • Report
    • Record#: 002124
    • View Record
  • COMMENTS FROM U.S. EPA-SAN FRANCISCO ON DRAFT FINDING OF SUITABILITY TO TRANSFER, DATED 30 AUGUST 2010 (PUBLIC DOCUMENT)
    Site(s): PARCEL D-2
    • U.S. EPA - SAN FRANCISCO, CA
    • 10/29/2010
    • Correspondence
    • Record#: 003310
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT PIER DEMOLITION WORK PLAN (INCLUDES REVIEW AND COMMENTS FROM MORGAN, L. - DEPARTMENT OF PUBLIC HEALTH - SACRAMENTO, CA; AND CD COPY) [SEE RECORD # 2244 - DRAFT PIER DEMOLITION WORK PLAN]
    Site(s): BASEWIDE
    • DTSC - BERKELEY, CA
    • 10/26/2010
    • Correspondence
    • Record#: 002291
    • View Record
  • COMMENTS FROM DTSC-BERKELEY ON DRAFT FINDING OF SUITABILITY TO TRANSFER, DATED 30 AUGUST 2010 - INCLUDES COMMENTS FROM CALIFORNIA DEPARTMENT OF PUBLIC HEALTH (PUBLIC DOCUMENT)
    Site(s): PARCEL D-2, PARCEL UC1
    • DTSC - BERKELEY, CA
    • 10/26/2010
    • Correspondence
    • Record#: 003309
    • View Record
  • FINAL EXECUTION PLAN, RADIOLOGICAL REMEDIATION AND SUPPORT (CD COPY ENCLOSED) [SEE RECORD # 2142 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL C
    • TETRA TECH EC, INC.
    • 10/25/2010
    • Report
    • Record#: 002143
    • View Record
  • TRANSMITTAL OF THE FINAL EXECUTION PLAN, RADIOLOGICAL REMEDIATION AND SUPPORT (ENCLOSURE IS RECORD # 2143)
    Site(s): PARCEL C
  • REVIEW AND COMMENTS ON THE DRAFT PIER DEMOLITION WORK PLAN (CD COPY ENCLOSED) [SEE RECORD # 2244 - DRAFT PIER DEMOLITION WORK PLAN]
    Site(s): BASEWIDE
    • DEPARTMENT OF PUBLIC HEALTH - SAN FRANCISCO, CA
    • 10/22/2010
    • Correspondence
    • Record#: 002289
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT PIER DEMOLITION WORK PLAN (CD COPY ENCLOSED) [SEE RECORD # 2244 - DRAFT PIER DEMOLITION WORK PLAN]
    Site(s): BASEWIDE
    • U.S. EPA - SAN FRANCISCO, CA
    • 10/21/2010
    • Correspondence
    • Record#: 002287
    • View Record
  • RESPONSE TO COMMENTS REGARDING THE DRAFT PIER DEMOLITION WORK PLAN HUNTERS POINT NAVAL SHIPYARD CA
    Site(s): BASEWIDE
    • ERS JOINT VENTURE
    • 10/19/2010
    • Correspondence
    • Record#: 005483
    • View Record
  • TRANSMITTAL OF THE FINAL ADDENDUM TO PROJECT WORK PLAN PETROLEUM HYDROCARBON CORRECTIVE ACTION (ENCLOSURE IS RECORD # 2491)
    Site(s): PARCEL B
  • PUBLIC NOTICE REGARDING THE FINAL RECORD OF DECISION PUBLISHED IN THE SAN FRANCISCO EXAMINER (CD COPY ENCLOSED)
    Site(s): PARCEL C
    • SAN FRANCISCO EXAMINER - SAN FRANCISCO, CA
    • 10/15/2010
    • Public Notice
    • Record#: 002096
    • View Record
  • TRANSMITTAL OF THE REPLACEMENT PAGES CONVERTING THE DRAFT FINAL RECORD OF DECISION DATED 13 AUGUST 2010 TO FINAL (ENCLOSURE IS RECORD # 2115)
    Site(s): PARCEL C
  • TRANSMITTAL OF THE DRAFT TECHNICAL MEMORANDUM FOR DATA GAP INVESTIGATION OF SOIL UNDER BUILDINGS (ENCLOSURE IS RECORD # 2042)
    Site(s): PARCEL C
  • FINAL ADDENDUM TO PROJECT WORK PLAN PETROLEUM HYDROCARBON CORRECTIVE ACTION (CD COPY ENCLOSED)
    Site(s): AOC 000046A, AOC 000046B, AOC 000070A, PARCEL B
    • INNOVATIVE TECHNICAL SOLUTIONS, INC.
    • 10/01/2010
    • Report
    • Record#: 002491
    • View Record
  • FINAL TECHNICAL MEMORANDUM FOR DATA GAP INVESTIGATION OF SOIL UNDER BUILDINGS (CD COPY ENCLOSED) [SEE RECORD # 2911 - BRAC PMO WEST TRANSMITTAL LETTER]
    Site(s): PARCEL C
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 09/30/2010
    • Report
    • Record#: 002936
    • View Record
  • TRANSMITTAL OF THE FINAL TECHNICAL MEMORANDUM FOR DATA GAP INVESTIGATION OF SOIL UNDER BUILDINGS (ENCLOSURE IS RECORD # 2936)
    Site(s): PARCEL C
  • FINAL RECORD OF DECISION (INCLUDES REPLACEMENT PAGES CONVERTING THE DRAFT FINAL DATED 13 AUGUST 2010 TO FINAL, AND CD COPY) [SEE RECORD # 2114 AND RECORD # 2122 - BRAC PMO WEST TRANSMITTAL LETTERS]
    Site(s): PARCEL C, PARCEL UC2, SITE 00045, SITE 00049, SITE 00050, SITE 00051
    • CHADUX - TT, JOINT VENTURE
    • 09/30/2010
    • Report
    • Record#: 002115
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT FINAL RECORD OF DECISION (SEE RECORD # 2115 - DRAFT FINAL RECORD OF DECISION)
    Site(s): PARCEL C
    • DTSC - BERKELEY, CA
    • 09/28/2010
    • Correspondence
    • Record#: 002117
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT FINAL RECORD OF DECISION (SEE RECORD # 2115 - DRAFT FINAL RECORD OF DECISION)
    Site(s): PARCEL C, PARCEL G
    • DTSC - BERKELEY, CA
    • 09/27/2010
    • Correspondence
    • Record#: 002116
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT FINAL RECORD OF DECISION (SEE RECORD # 2115 - DRAFT FINAL RECORD OF DECISION)
    Site(s): PARCEL C
    • SAN FRANCISCO CITY AND COUNTY DEPARTMENT OF PUBLIC HEALTH - SAN FRANCISCO, CA
    • 09/24/2010
    • Correspondence
    • Record#: 002118
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN/SITE SAFETY AND HEALTH PLAN, SANITARY SEWER AND STORM DRAIN REMOVAL (CD COPY ENCLOSED)
    Site(s): PARCEL C
    • TETRA TECH EC, INC.
    • 09/21/2010
    • Report
    • Record#: 002067
    • View Record
  • TRANSMITTAL OF THE DRAFT PIER DEMOLITION WORK PLAN (ENCLOSURE IS RECORD # 2244)
    Site(s): BASEWIDE
  • TRANSMITTAL OF THE FINAL DEMOLITION PLAN FOR GUN MOLE PIER AND SOUTH PIER BUILDINGS (ENCLOSURE IS RECORD # 2082)
    Site(s): PARCEL D-1
  • TRANSMITTAL OF THE FINAL PROJECT WORK PLAN, STORM DRAIN AND SANITARY SEWER REMOVAL (ENCLOSURE IS RECORD # 2078)
    Site(s): PARCEL D-1
  • TRANSMITTAL OF THE FINAL EXECUTION PLAN FOR THE RADIOLOGICAL REMEDIATION AND SUPPORT (ENCLOSURE IS RECORD # 2084)
    Site(s): PARCEL D-1
    • BRAC PMO WEST
    • 09/10/2010
    • Correspondence
    • Record#: 002083