Environmental
Admin Record Search

Basic Search

LEMOORE_NAS

From Date: To Date:
Document Title: Site(s):
Author Affiliation: Keyword(s):
Filter By
Record Type:
  • Correspondence
  • Report
  • Minutes
  • Fact Sheet
  • Public Notice
  • Other
Attachment:
  • Available for Download
  • Request Document
120 Records Found
  • FINAL 2018 POST-CLOSURE MONITORING REPORT, SITE 1 LANDFILL (PUBLIC DOCUMENT)
    Site(s): SITE 00001
    • MULTIMEDIA ENVIRONMENTAL COMPLIANCE GROUP
    • 07/16/2019
    • Report
    • Record#: 001260
    • View Record
  • FINAL LAND USE CONTROL REMEDIAL DESIGN FOR SITE 17 (PUBLIC DOCUMENT)
    Site(s): SITE 00017
  • FINAL FIELD CHANGE REQUEST 1
    Site(s): SITE 00005, SITE 00009, SITE 00014
  • FINAL ACCIDENT PREVENTION PLAN GROUNDWATER AND INDOOR AIR SAMPLING AT SITES 5/9 AND 14
    Site(s): SITE 00005, SITE 00009, SITE 00014
  • TRANSMITTAL OF FINAL PRELIMINARY ASSESSMENT/SITE INSPECTION REPORT FOR SITE 18, DATED 12 SEPTEMBER 2018
    Site(s): SITE 00018
    • MULTIMEDIA ENVIRONMENTAL COMPLIANCE GROUP
    • 09/12/2018
    • Correspondence
    • Record#: 001247
    • View Record
  • FINAL PRELIMINARY ASSESSMENT/SITE INSPECTION REPORT FOR SITE 18
    Site(s): SITE 00018
  • TRANSMITTAL OF FINAL PRELIMINARY ASSESSMENT/SITE INSPECTION REPORT FOR SITE 18, DATED 12 SEPTEMBER 2018
    Site(s): SITE 00018
    • MULTIMEDIA ENVIRONMENTAL COMPLIANCE GROUP
    • 09/12/2018
    • Correspondence
    • Record#: 001246
    • View Record
  • FINAL WORK PLAN, UNDERGROUND STORAGE TANK INVESTIGATION AND SITE CHARACTERIZATION, UNDERGROUND STORAGE TANK 3, NEX GAS STATION
    Site(s): UST 000003
  • TRANSMITTAL OF FINAL WORK PLAN, UNDERGROUND STORAGE TANK INVESTIGATION AND SITE CHARACTERIZATION, UNDERGROUND STORAGE TANK 3, NEX GAS STATION, DATED 26 JULY 2018
    Site(s): UST 000003
    • BRADY GCE II
    • 07/26/2018
    • Correspondence
    • Record#: 001243
    • View Record
  • TRANSMITTAL OF FINAL WORK PLAN, UNDERGROUND STORAGE TANK INVESTIGATION AND SITE CHARACTERIZATION, UNDERGROUND STORAGE TANK 3, NEX GAS STATION, DATED 26 JULY 2018
    Site(s): UST 000003
    • BRADY GCE II
    • 07/26/2018
    • Correspondence
    • Record#: 001244
    • View Record
  • TRANSMITTAL OF FINAL WORK PLAN, UNDERGROUND STORAGE TANK INVESTIGATION AND SITE CHARACTERIZATION, UNDERGROUND STORAGE TANK 3, NEX GAS STATION, DATED 26 JULY 2018
    Site(s): UST 000003
    • BRADY GCE II
    • 07/26/2018
    • Correspondence
    • Record#: 001242
    • View Record
  • FINAL VAPOR INTRUSION SUMMARY TABLES, 2017 AND 2018, SITES 5, 9 (BUILDING 58), AND 14 (BUILDINGS 170, 177, 180, AND 188)
    Site(s): SITE 00005, SITE 00009, SITE 00014
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 07/01/2018
    • Report
    • Record#: 001238
    • View Record
  • TRANSMITTAL OF DRAFT PRELIMINARY ASSESSMENT/SITE INSPECTION REPORT FOR SITE 18, DATED 15 MAY 2018
    Site(s): SITE 00018
    • MULTIMEDIA ENVIRONMENTAL COMPLIANCE GROUP
    • 05/15/2018
    • Correspondence
    • Record#: 001235
    • View Record
  • TRANSMITTAL OF DRAFT PRELIMINARY ASSESSMENT/SITE INSPECTION REPORT FOR SITE 18, DATED 15 MAY 2018
    Site(s): SITE 00018
    • MULTIMEDIA ENVIRONMENTAL COMPLIANCE GROUP
    • 05/15/2018
    • Correspondence
    • Record#: 001236
    • View Record
  • FACT SHEET - FINAL INDOOR AIR POST SAMPLING BUILDINGS 58, 170, 177, 180, AND 188 SITES 5, 9 AND 14
    Site(s): SITE 00005, SITE 00009, SITE 00014
  • REVISED FINAL TECHNICAL MEMORANDUM, RAPID RESPONSE PLAN FOR THE VAPOR INTRUSION INVESTIGATION FOR SITES 5, 9, AND 14, BUILDINGS 58, 170, 177, 180, AND 188
    Site(s): SITE 00005, SITE 00009, SITE 00014
  • TRANSMITTAL OF FINAL REMEDIAL INVESTIGATION ADDENDUM FOR SITE 14, DATED 12 SEPTEMBER 2017
    Site(s): SITE 00014
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 09/27/2017
    • Correspondence
    • Record#: 001225
    • View Record
  • REVISED FINAL ACCIDENT PREVENTION PLAN VAPOR INTRUSION INVESTIGATION, SITES 5/9 AND 14
    Site(s): SITE 00005, SITE 00009, SITE 00014
  • FINAL REMEDIAL INVESTIGATION ADDENDUM FOR SITE 14
    Site(s): SITE 00014
  • TRANSMITTAL OF FINAL WORK PLAN, VAPOR INTRUSION INVESTIGATION FOR INSTALLATION RESTORATION SITES 5, 9 (BUILDING 58) AND 14 (BUILDINGS 170, 177, 180, AND 188), DATED 7 JULY 2017
    Site(s): SITE 00005, SITE 00009, SITE 00014
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 07/11/2017
    • Correspondence
    • Record#: 001214
    • View Record
  • FINAL WORK PLAN, VAPOR INTRUSION INVESTIGATION FOR INSTALLATION RESTORATION SITES 5, 9 (BUILDING 58) AND 14 (BUILDINGS 170, 177, 180, AND 188) [CD COPY ENCLOSED] (SEE RECORD # 1214 - CH2M HILL - KLEINFELDER, JOINT VENTURE TRANSMITTAL LETTER)
    Site(s): SITE 00005, SITE 00009, SITE 00014
  • FINAL REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR SITES 5 AND 9
    Site(s): SITE 00005, SITE 00009
  • FINAL TECHNICAL MEMORANDUM RAPID RESPONSE PLAN FOR THE VAPOR INTRUSION INVESTIGATION FOR INSTALLATION RESTORATION SITES 5/9 (BUILDING 58) AND 14 (BUILDINGS 170, 177, 180, AND 188)
    Site(s): SITE 00005, SITE 00009, SITE 00014
  • FACT SHEET - INDOOR AIR FACT SHEET, BUILDINGS 58, 170, 177, 180, AND 188, INSTALLATION RESTORATION PROGRAM SITES 5, 9 AND 14 (CD COPY ENCLOSED)
    Site(s): SITE 00005, SITE 00009, SITE 00014
  • RESPONSE TO COMMENTS FROM MULTIPLE AGENCIES ON DRAFT WORK PLAN, VAPOR INTRUSION INVESTIGATION FOR SITES 5 AND 9, DATED 7 FEBRUARY 2017
    Site(s): SITE 00005, SITE 00009
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2017
    • Correspondence
    • Record#: 001257
    • View Record
  • PUBLIC NOTICE - NOTICE OF THE NAVY CURRENTLY CONDUCTING FIVE-YEAR REVIEW FOR SITES 1, 3, 8, AND 16, DATED 31 MARCH 2017 (CD COPY ENCLOSED) [PUBLIC DOCUMENT]
    Site(s): SITE 00001, SITE 00003, SITE 00008, SITE 00016
    • SENTINEL - HANFORD, CA
    • 03/31/2017
    • Public Notice
    • Record#: 001213
    • View Record
  • TRANSMITTAL OF THE FINAL WORK PLAN FOR PRELIMINARY ASSESSMENT/SITE INSPECTION AND LANDFILL GAS AND MONITORING WELL REPLACEMENT (ENCLOSURE IS RECORD # 1207)
    Site(s): SITE 00001
    • MULTIMEDIA ENVIRONMENTAL COMPLIANCE GROUP
    • 01/25/2017
    • Correspondence
    • Record#: 001205
    • View Record
  • TRANSMITTAL OF THE FINAL WORK PLAN FOR PRELIMINARY ASSESSMENT/SITE INSPECTION AND LANDFILL GAS AND MONITORING WELL REPLACEMENT (ENCLOSURE IS RECORD # 1207)
    Site(s): SITE 00001
    • MULTIMEDIA ENVIRONMENTAL COMPLIANCE GROUP
    • 01/25/2017
    • Correspondence
    • Record#: 001206
    • View Record
  • FINAL WORK PLAN FOR PRELIMINARY ASSESSMENT/SITE INSPECTION AND LANDFILL GAS AND MONITORING WELL REPLACEMENT (CD COPY ENCLOSED) [SEE RECORDS # 1205 AND # 1206 - MULTIMEDIA ENVIRONMENTAL COMPLIANCE GROUP TRANSMITTAL LETTERS]
    Site(s): SITE 00001
    • MULTIMEDIA ENVIRONMENTAL COMPLIANCE GROUP
    • 01/20/2017
    • Report
    • Record#: 001207
    • View Record
  • RESPONSE TO COMMENTS FROM MULTIPLE AGENCIES ON DRAFT REMEDIAL INVESTIGATION ADDENDUM FOR SITE 14, DATED 1 APRIL 2016
    Site(s): SITE 00014
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 12/01/2016
    • Correspondence
    • Record#: 001256
    • View Record
  • FINAL SITE MANAGEMENT PLAN (CD COPY ENCLOSED) [SEE RECORDS # 1201 AND # 1202 - MULTIMEDIA ENVIRONMENTAL COMPLIANCE GROUP TRANSMITTAL LETTERS]
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017
    • MULTIMEDIA ENVIRONMENTAL COMPLIANCE GROUP
    • 09/09/2016
    • Report
    • Record#: 001203
    • View Record
  • TRANSMITTAL OF THE FINAL SITE MANAGEMENT PLAN (ENCLOSURE IS RECORD # 1203)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017
    • CRWQCB - FRESNO, CA
    • 09/09/2016
    • Correspondence
    • Record#: 001201
    • View Record
  • TRANSMITTAL OF THE FINAL SITE MANAGEMENT PLAN (ENCLOSURE IS RECORD # 1203)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017
    • DTSC - SACRAMENTO, CA
    • 09/09/2016
    • Correspondence
    • Record#: 001202
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN FOR SITE 1 WELL REPLACEMENT AND SITE 18 PRELIMINARY ASSESSMENT/SITE INSPECTION
    Site(s): SITE 00001, SITE 00018
  • FINAL WORK PLAN POST-CRASH RESPONSE AND SITE RESTORATION ACTION
    Site(s): BASEWIDE
  • TRANSMITTAL OF THE DRAFT REMEDIAL INVESTIGATION ADDENDUM (ENCLOSURE IS RECORD # 1199)
    Site(s): SITE 00014
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/05/2016
    • Correspondence
    • Record#: 001198
    • View Record
  • RESPONSE TO COMMENTS FROM MULTIPLE AGENCIES ON DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY, SITES 5 AND 9, DATED 29 JANUARY 2016
    Site(s): SITE 00005, SITE 00009
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2016
    • Correspondence
    • Record#: 001255
    • View Record
  • FINAL ADDENDUM 1 TO THE FINAL SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN/QUALITY ASSURANCE PROJECT PLAN) FOR ADDITIONAL REMEDIAL INVESTIGATION ACTIVITIES AT SITES 5, 9 AND 14
    Site(s): SITE 00005, SITE 00009, SITE 00014
  • FINAL RECORD OF DECISION/REMEDIAL ACTION PLAN, SITES 2 AND 4
    Site(s): SITE 00002, SITE 00004
  • FINAL FIVE-YEAR REVIEW FOR SITES 1, 3, 8, AND 16 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00003, SITE 00008, SITE 00016
  • FINAL SITE MANAGEMENT PLAN
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017, UST 000002, UST 000003
  • REVIEW AND COMMENTS ON THE FINAL MEMORANDUM: UPDATED HUMAN HEALTH RISK ASSESSMENT AND RECOMMENDATION FOR NO FURTHER ACTION (SEE RECORD # 1109 - FINAL MEMORANDUM: UPDATED HUMAN HEALTH RISK ASSESSMENT AND RECOMMENDATION FOR NO FURTHER ACTION)
    Site(s): SITE 00002, SITE 00004
  • RESCISSION OF WASTE DISCHARGE REQUIREMENTS (INCLUDES RESCISSION ORDER)
    Site(s): SITE 00001
  • REVIEW AND COMMENTS ON THE DRAFT SITE MANAGEMENT PLAN (SEE RECORD # 1101 - DRAFT SITE MANAGEMENT PLAN)
    Site(s): UST 000001, UST 000002, UST 0000094, UST 0000709
  • CONCURRENCE WITH DRAFT SITE MANAGEMENT PLAN, 20 FEBRUARY 2012
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017, UST 000001, UST 000002, UST 000188-1, UST 000188-2
    • CRWQCB - FRESNO, CA
    • 03/27/2012
    • Correspondence
    • Record#: 001116
    • View Record
  • TRANSMITTAL OF THE DRAFT SITE MANAGEMENT PLAN (ENCLOSURE IS RECORD # 1101)
    Site(s): BASEWIDE
  • PUBLIC NOTICE ANNOUNCING THE REVIEW OF SELECTED REMEDIES
    Site(s): SITE 00001, SITE 00003, SITE 00008, SITE 00016
  • TRANSMITTAL OF THE FINAL MEMORANDUM: UPDATED HUMAN HEALTH RISK ASSESSMENT AND RECOMMENDATION FOR NO FURTHER ACTION (ENCLOSURE IS RECORD # 1109)
    Site(s): SITE 00002, SITE 00004
  • FINAL MEMORANDUM: UPDATED HUMAN HEALTH RISK ASSESSMENT AND RECOMMENDATION FOR NO FURTHER ACTION (CD COPY ENCLOSED) [SEE RECORD 1108 - NAVFAC SW TRANSMITTAL LETTER]
    Site(s): BASEWIDE
  • FINAL GROUNDWATER MONITORING REPORT, ADMINISTRATION AREA NAVY EXCHANGE GAS STATION (CD COPY ENCLOSED) [SEE RECORD # 1097 - NAVFAC SW TRANSMITTAL LETTER]
    Site(s): UST 000003
  • TRANSMITTAL OF THE FINAL GROUNDWATER MONITORING REPORT, ADMINISTRATION AREA NAVY EXCHANGE GAS STATION (ENCLOSURE IS RECORD # 1098)
    Site(s): BASEWIDE
  • REVIEW AND COMMENTS ON THE DRAFT GROUNDWATER MONITORING REPORT, ADMINISTRATION AREA NAVAL EXCHANGE GAS STATION (SEE RECORD # 1087 - DRAFT GROUNDWATER MONITORING REPORT, ADMINISTRATION AREA NAVAL EXCHANGE GAS STATION)
    Site(s): UST 000003
  • FINAL ACCIDENT PREVENTION PLAN FOR SITE 17, MULTI-PHASE EXTRACTION SYSTEM REPAIR, OPERATION AND MAINTENANCE (PUBLIC DOCUMENT)
    Site(s): SITE 00017
  • LETTER REQUESTING DTSC IDENTIFY POTENTIAL STATE CHEMICAL-SPECIFIC, LOCATION-SPECIFIC, AND ACTION-SPECIFIC APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS FOR THE REMEDIAL INVESTIGATION AND FEASIBILITY STUDY AT SITE 5, 9
    Site(s): SITE 00005, SITE 00009
  • RESPONSES TO COMMENTS ON THE REVISED DRAFT ACCIDENT PREVENTION PLAN AND SITE SAFETY AND HEALTH PLAN, MONITORING WELL INSTALLATION AND SAMPLING AT ADMINISTRATION AREA NAVAL EXCHANGE GAS STATION (CD COPY ENCLOSED)
    Site(s): BASEWIDE
    • CHADUX - TT, JOINT VENTURE
    • 11/01/2010
    • Correspondence
    • Record#: 000844
    • View Record
  • FINAL ARSENIC CONFIRMATION SAMPLING REPORT (CD COPY ENCLOSED) [SEE RECORD # 1026 - NAVFAC SW TRANSMITTAL LETTER]
    Site(s): SITE 00002, SITE 00004, SITE 00005, SITE 00009, SITE 00017
  • FINAL WORK PLAN, ADDITIONAL REMEDIAL INVESTIGATION ACTIVITIES AT SITES 5, 9 AND 14
    Site(s): SITE 00005, SITE 00009, SITE 00014
  • FINAL SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN/QUALITY ASSURANCE PROJECT PLAN) FOR ADDITIONAL REMEDIAL INVESTIGATION ACTIVITIES AT SITE 5, 9 AND 14
    Site(s): SITE 00005, SITE 00009, SITE 00014
  • FINAL ACCIDENT PREVENTION PLAN, BASEWIDE ENVIRONMENTAL SUPPORT/COORDINATION
    Site(s): BASEWIDE
  • FINAL SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN/QUALITY ASSURANCE PROJECT PLAN) FOR ARSENIC CONFIRMATION SAMPLING
    Site(s): SITE 00002, SITE 00004, SITE 00005, SITE 00009, SITE 00017
  • FINAL BASEWIDE PERCHLORATE INVESTIGATION REPORT
    Site(s): BASEWIDE
  • FINAL SECOND 5-YEAR REVIEW REPORT, SITE 1 LANDFILL (SEE RECORD # 865 - NAVFAC SW TRANSMITTAL LETTER) [PUBLIC DOCUMENT]
    Site(s): SITE 00001
  • FINAL BASEWIDE HEALTH AND SAFETY PLAN
    Site(s): SITE 00001, SITE 00005, SITE 00009, SITE 00014, SITE 00017
  • FINAL COMMUNITY RELATIONS PLAN, REVISION 3
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017
  • FINAL OPERATION, MAINTENANCE, AND MONITORING PLAN, SITE 17, MULTIPHASE EXTRACTION SYSTEM, VOLUMES 1 AND 2 OF 2 (PUBLIC DOCUMENT)
    Site(s): SITE 00017
  • FACT SHEET: FIVE-YEAR REVIEW OF THE FORMER LANDFILL (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • FINAL RECORD OF DECISION/REMOVAL ACTION WORK PLAN, SITES 6 AND 7
    Site(s): SITE 00006, SITE 00007
  • FINAL FOCUSED FEASIBILITY STUDY, SITES 2 AND 4
    Site(s): SITE 00002, SITE 00004
  • REVISED FACT SHEET - UPDATE ABOUT ENVIRONMENTAL RESTORATION
    Site(s): SITE 00005, SITE 00009, SITE 00014, SITE 00017
  • FINAL FIELD SAMPLING PLAN/QUALITY ASSURANCE PROJECT PLAN FOR SECOND ANNUAL GROUNDWATER MONITORING SITES 5, 9 AND 14
    Site(s): SITE 00005, SITE 00009, SITE 00014
  • REVIEW AND COMMENTS ON THE DRAFT FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN FOR SECOND ANNUAL GROUNDWATER MONITORING (SEE RECORD # 608 - DRAFT FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN)
    Site(s): SITE 00005, SITE 00009, SITE 00014
    • CRWQCB - FRESNO, CA
    • 07/23/2001
    • Correspondence
    • Record#: 000628
    • View Record
  • FINAL PROJECT WORK PLAN, SITE 17 MULTIPHASE EXTRACTION SYSTEM - PHASE 1, DISCHARGE PIPE, INFILTRATION GALLERY AND PIEZOMETER
    Site(s): SITE 00017
  • FINAL FIRST ANNUAL GROUNDWATER MONITORING REPORT FOR SITES 5, 9 AND 14, VOLUMES 1 AND 2 OF 2
    Site(s): SITE 00005, SITE 00009, SITE 00014
  • FINAL BASEWIDE TECHNICAL MEMORANDUM, GROUNDWATER BENEFICIAL USE
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017
  • PHASE 2 FIRST-QUARTER GROUNDWATER REPORT, SITES 5, 9 AND 14, VOLUMES 1 AND 2 OF 2
    Site(s): SITE 00005, SITE 00009, SITE 00014
  • TECHNICAL MEMORANDUM, PILOT SOIL BORINGS, SITES 5, 9 AND 14
    Site(s): SITE 00005, SITE 00009, SITE 00014
  • PETROLEUM CLEANUP ACTION SUMMARY REPORT, SITE 5
    Site(s): SITE 00005
  • FINAL COMPLETION REPORT PETROLEUM REMOVAL ACTION, SITES 4 AND 5 (PUBLIC DOCUMENT)
    Site(s): SITE 00004, SITE 00005
  • PHASE 2 SAMPLING AND ANALYSIS PLAN, SITE 5 AND 14
    Site(s): SITE 00005, SITE 00014
  • GROUNDWATER SUMMARY REPORT, PHASE 1 - SITES 5 AND 14
    Site(s): SITE 00005, SITE 00014
  • FINAL SITE 1 LANDFILL CLOSURE POST-CONSTRUCTION REPORT (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • FINAL FIELD SAMPLING PLAN, SITE 5 AND 14 PHASE 1
    Site(s): SITE 00005, SITE 00014
  • FINAL REMEDIAL INVESTIGATION REPORT, SITE 14
    Site(s): SITE 00014
  • FINAL BASEWIDE HEALTH AND SAFETY PLAN
    Site(s): BASEWIDE
    • TETRA TECH EM, INC.
    • 02/05/1999
    • Report
    • Record#: 000469
    • View Record
  • COMMENTS ON DRAFT REMEDIAL INVESTIGATION REPORT, SITE 5, DATED 30 OCTOBER 1998
    Site(s): SITE 00005
    • CRWQCB - FRESNO, CA
    • 01/06/1999
    • Correspondence
    • Record#: 000466
    • View Record
  • FINAL REMEDIAL INVESTIGATION REPORT, SITE 2
    Site(s): SITE 00002
  • FINAL REMEDIAL INVESTIGATION REPORT, SITE 4
    Site(s): SITE 00004
  • FINAL ECOLOGICAL SCOPING ASSESSMENT REPORT, SITES 1 THROUGH 17
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017
  • FINAL REMEDIAL INVESTIGATION REPORT, SITE 6
    Site(s): SITE 00006
  • FINAL REMEDIAL INVESTIGATION REPORT, SITE 7
    Site(s): SITE 00007
  • QUARTERLY REPORT, OCTOBER 1997
    Site(s): SITE 00001
  • FINAL POST-CLOSURE REPORT, SITE 1, LANDFILL CLOSURE REMEDIAL ACTION (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • FINAL REMEDIAL INVESTIGATION REPORT, SITE 15
    Site(s): SITE 00015
    • PRC ENVIRONMENTAL MANAGEMENT, INC.
    • 06/10/1997
    • Report
    • Record#: 000400
    • View Record
  • FINAL PETROLEUM CLEANUP ACTION FOR FLOATING PRODUCT AND HYDROCARBON-CONTAMINATED SOIL AT FIRE FIGHTING TRAINING SITES 4 AND 5
    Site(s): SITE 00004, SITE 00005
  • REVISED COMMUNITY RELATIONS PLAN
    Site(s): BASEWIDE
    • PRC ENVIRONMENTAL MANAGEMENT, INC.
    • 05/05/1997
    • Report
    • Record#: 000388
    • View Record
  • WORK PLAN, CONTRACTOR QUALITY CONTROL PLAN, SAMPLING AND ANALYSIS PLAN, SITE HEALTH AND SAFETY PLAN, SITES 4 AND 5 PETROLEUM REMOVAL ACTION
    Site(s): SITE 00004, SITE 00005
  • FINAL RECORD OF DECISION/REMEDIAL ACTION PLAN, SITE 1
    Site(s): SITE 00001
  • FINAL REMEDIAL INVESTIGATION REPORT, GENERAL BASEWIDE
    Site(s): BASEWIDE
  • NOTIFICATION OF CHANGE IN REMEDIAL PROJECT MANAGER (RPM) AND TRANSMITTAL OF THE REVISED TELEPHONE LIST
    Site(s): BASEWIDE
  • FINAL COMMUNITY RELATIONS PLAN
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017
  • 1992 MASTER PLAN
    Site(s): BASEWIDE
  • FEDERAL FACILITY EXPANDED SITE INSPECTION REVIEW
    Site(s): SITE 00001, SITE 00006, SITE 00011
    • URS CONSULTANTS, INC.
    • 12/11/1992
    • Report
    • Record#: 000988
    • View Record
  • MEMORANDUM ON SELECTED SITE MAPS WITH PRELIMINARY SOIL GAS SURVEY RESULTS FOR THE REMEDIAL INVESTIGATION
    Site(s): SITE 00001, SITE 00004, SITE 00005, SITE 00014, SITE 00017
  • REVIEW AND COMMENTS ON THE HYRDOGEOLOGIC ASSESSMENT REPORT (SEE RECORD # 36 - HYDROGEOLOGIC ASSESSMENT REPORT)
    Site(s): SITE 00001
    • DEPARTMENT OF HEALTH SERVICES - SACRAMENTO, CA
    • 06/04/1991
    • Correspondence
    • Record#: 000153
    • View Record
  • HYDROGEOLOGIC ASSESSMENT REPORT, FORMER SLUDGE DRYING POND
    Site(s): SITE 00008
  • REMEDIAL INVESTIGATION/FEASIBILITY STUDY COMMUNITY RELATIONS PLAN (PUBLIC PARTICIPATION PLAN)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017
  • FINAL REMEDIAL INVESTIGATION/FEASIBILITY STUDY WORK PLANS, FIELD SAMPLING PLAN
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00016, SITE 00017
  • FINAL REMEDIAL INVESTIGATION/FEASIBILITY STUDY WORK PLAN
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00010, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017
  • FINAL REMEDIAL INVESTIGATION/FEASIBILITY STUDY HEALTH AND SAFETY PLAN
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017
  • COMMENTS ON SECTIONS OF THE DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY WORK PLAN PERTAINING TO THE HYDROGEOLOGIC ASSESSMENT REPORT FOR THE FORMER INDUSTRIAL WASTE SLUDGE POND
    Site(s): SITE 00009
  • FEDERAL FACILITY PRELIMINARY ASSESSMENT / SITE INSPECTION REVIEW
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012, SITE 00013
    • ECOLOGY AND ENVIRONMENT, INC.
    • 08/31/1989
    • Report
    • Record#: 000967
    • View Record
  • AMENDMENT TO THE APRIL 1987 PLAN OF ACTION CONFIRMATION STUDY (SEE RECORD # 8 - PLAN OF ACTION CHARACTERIZATION PHASE CONFIRMATION STUDY)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00012
  • PLAN OF ACTION, CHARACTERIZATION PHASE CONFIRMATION STUDY
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00012
  • PLAN OF ACTION, CHARACTERIZATION PHASE CONFIRMATION STUDY
    Site(s): SITE 00001, SITE 00005, SITE 00006
  • VERIFICATION PHASE CONFIRMATION STUDY REPORT
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012
  • FINAL REPORT OF INVESTIGATION, PRELIMINARY ENGINEERING STUDY ON INDUSTRIAL WASTE TREATMENT FACILITY
    Site(s): SITE 00005, SITE 00009
  • HEALTH AND SAFETY PLAN CONFIRMATION STUDY VERIFICATION PHASE
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012
    • AQUA TERRA TECHNOLOGIES, INC.
    • 07/01/1985
    • Report
    • Record#: 000004
    • View Record
  • PLAN OF ACTION CONFIRMATION STUDY VERIFICATION PHASE
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012
  • FINAL INITIAL ASSESSMENT STUDY
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00011, SITE 00012, SITE 00013
  • TRANSMITTAL OF FIELD AND LABORATORY TESTING SERVICES FOR EXISTING INDUSTRIAL WASTE SLUDGE POND, DATED 8 SEPTEMBER 1981
    Site(s): SITE 00001, SITE 00009

1322 Patterson Ave. SE, Suite 1000, Washington Navy Yard, D.C. 20374-5065

  • Please read this Privacy Policy
  • GILS NUMBER DOD-USN-000702
Connect with Us