NAVAL STATION ROTA, Spain (Nov. 17, 2020) Members of Public Works Department Rota and UTE Castellano-Cobra work through the night in order to install two new transformers and conduct a standard lift procedure in order to provide inter-connection to the transformers and to the existing overhead medium-voltage pole in support of Galley Utilities Replacement project (N33191-15-D-0826 TO N33191-18-F-4498). The purpose of this $4 million project is to replace and upgrade existing plumbing, sewer, electrical, fire protection/alarm system, and kitchen ventilation systems at the NAVSTA Rota Galley, Building 38. (U.S. Navy photo by Lt. Chanhan Lee)