Environmental
Admin Record Search

Basic Search

CHINA_LAKE_NAWS

From Date: To Date:
Document Title: Site(s):
Author Affiliation: Keyword(s):
Filter By
Record Type:
  • Correspondence
  • Report
  • Minutes
  • Fact Sheet
  • Public Notice
  • Other
Attachment:
  • Available for Download
  • Request Document
700 Records Found
  • FINAL WORK PLAN FOR SITE 81 PRELIMINARY ASSESSMENT/SITE INSPECTION
    Site(s): SITE 00081
  • LABORATORY DATA PACKAGE - REMEDIAL INVESTIGATION FOR MUNITIONS RESPONSE PROGRAM SITE 2, MOJAVE GUNNERY RANGE, C TARGET 71, SECTION 18
    Site(s): UXO 000002
    • JACOBS ENGINEERING GROUP, INC.
    • 10/31/2018
    • Analytical Data
    • Record#: 002142
    • View Record
  • TRANSMITTAL OF CORRECTION PAGES FOR FINAL REMEDIAL INVESTIGATION ADDENDUM, SITES 9 AND 10, SALT WELLS ASBESTOS TRENCH AND SALT WELLS DISPOSAL TRENCH, DATED 1 JUNE 2018
    Site(s): SITE 00009, SITE 00010
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 08/02/2018
    • Correspondence
    • Record#: 001982
    • View Record
  • TRANSMITTAL OF CORRECTION PAGES FOR FINAL REMEDIAL INVESTIGATION ADDENDUM, SITE 37 GOLF COURSE LANDFILL, DATED 1 MARCH 2018
    Site(s): SITE 00037
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 07/26/2018
    • Correspondence
    • Record#: 001985
    • View Record
  • TRANSMITTAL OF FINAL SITE INSPECTION FOR LANDFILL OPERABLE UNIT AREAS OF CONCERN 85, 99, 113, 118, 124, 206, 235, 239, 242, AND 243, DATED 1 JULY 2018
    Site(s): SITE 00009
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 07/10/2018
    • Correspondence
    • Record#: 001979
    • View Record
  • FINAL SITE INSPECTION FOR LANDFILL OPERABLE UNIT AREAS OF CONCERN 85, 99, 113, 118, 124, 206, 235, 239, 242, AND 243
    Site(s): SITE 00009
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 07/01/2018
    • Report
    • Record#: 001980
    • View Record
  • FINAL FOCUSED FEASIBILITY STUDY FOR SITE 29, C-1 EAST DISPOSAL AREA
    Site(s): SITE 00029
  • TRANSMITTAL OF FINAL REMEDIAL INVESTIGATION ADDENDUM, SITES 9 AND 10, SALT WELLS ASBESTOS TRENCH AND SALT WELLS DISPOSAL TRENCH, DATED 1 JUNE 2018
    Site(s): SITE 00009, SITE 00010
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 06/26/2018
    • Correspondence
    • Record#: 001981
    • View Record
  • TRANSMITTAL OF DRAFT SITE INSPECTION FOR SITE 34, LAURITSEN ROAD LANDFILL, DATED 1 JUNE 20018
    Site(s): SITE 00034
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 06/25/2018
    • Correspondence
    • Record#: 001965
    • View Record
  • FINAL REMEDIAL INVESTIGATION ADDENDUM, SITES 9 AND 10, SALT WELLS ASBESTOS TRENCH AND SALT WELLS DISPOSAL TRENCH
    Site(s): SITE 00009, SITE 00010
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 06/01/2018
    • Report
    • Record#: 001983
    • View Record
  • MONTHLY COMPLIANCE REPORT FOR JUNE 2018 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM, ARMITAGE FIELD OPERABLE UNIT (PUBLIC DOCUMENT)
    Site(s): SITE 00001
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 06/01/2018
    • Report
    • Record#: 002028
    • View Record
  • TRANSMITTAL OF FINAL SITE INSPECTION REPORT FOR AREAS OF CONCERN 166, 230, AND 235, DATED 01 MAY 2018
    Site(s): BASEWIDE
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 05/31/2018
    • Correspondence
    • Record#: 001880
    • View Record
  • TRANSMITTAL OF REPLACEMENT PAGES FOR FINAL DATA REPORT GROUNDWATER AND SOIL INVESTIGATION SITES 22, 23, 31, 32, 43, AND PROPULSION LABORATORY OPERABLE UNIT, DATED 29 JANUARY 2018
    Site(s): SITE 00008, SITE 00011, SITE 00022, SITE 00023, SITE 00031, SITE 00032, SITE 00043, SITE 00046, SITE 00049
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 05/30/2018
    • Correspondence
    • Record#: 001947
    • View Record
  • MONTHLY COMPLIANCE REPORT FOR APRIL 2018 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM, ARMITAGE FIELD OPERABLE UNIT (PUBLIC DOCUMENT)
    Site(s): SITE 00001
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 05/19/2018
    • Report
    • Record#: 002015
    • View Record
  • FINAL RESPONSE TO COMMENTS ON THE DRAFT FINAL FOCUSED FEASIBILITY STUDY, SITE 29, C-1 EAST DISPOSAL AREA
    Site(s): SITE 00029
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 05/01/2018
    • Correspondence
    • Record#: 002105
    • View Record
  • FINAL SITE INSPECTION FOR AREAS OF CONCERN 166, 230, AND 235
    Site(s): BASEWIDE
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 05/01/2018
    • Report
    • Record#: 001881
    • View Record
  • MONTHLY COMPLIANCE REPORT FOR MAY 2018 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM, ARMITAGE FIELD OPERABLE UNIT (PUBLIC DOCUMENT)
    Site(s): SITE 00001
    • CE2 - KLEINFELDER, JOINT VENTURE
    • 05/01/2018
    • Report
    • Record#: 002027
    • View Record
  • RESPONSE TO COMMENTS FROM MULTIPLE AGENCIES ON DRAFT REMEDIAL INVESTIGATION ADDENDUM, SITES 9 AND 10, SALT WELLS ASBESTOS TRENCH AND SALT WELLS DISPOSAL TRENCH, DATED 1 MAY 2017
    Site(s): SITE 00009, SITE 00010
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 03/29/2018
    • Correspondence
    • Record#: 002103
    • View Record
  • RESPONSE TO COMMENTS FROM MULTIPLE AGENCIES ON DRAFT FINAL (REDLINE) REMEDIAL INVESTIGATION ADDENDUM SITES 9 AND 10, SALT WELLS ASBESTOS TRENCH AND SALT WELLS DISPOSAL TRENCH
    Site(s): SITE 00009, SITE 00010
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 03/29/2018
    • Correspondence
    • Record#: 002100
    • View Record
  • TRANSMITTAL OF FINAL REMEDIAL INVESTIGATION ADDENDUM, SITE 37 GOLF COURSE LANDFILL, DATED 1 MARCH 2018
    Site(s): SITE 00037
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 03/26/2018
    • Correspondence
    • Record#: 001984
    • View Record
  • RESPONSE TO COMMENTS FROM MULTIPLE AGENCIES ON DRAFT SITE INVESTIGATION, AREAS OF CONCERN 85, 99, 113, 118, 124, 206, 235, 239, 242, 243, DATED 1 OCTOBER 2017
    Site(s): SITE 00037
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 03/21/2018
    • Correspondence
    • Record#: 002102
    • View Record
  • COMMENTS ON DRAFT FINAL FOCUSED FEASIBILITY STUDY SITE 29, LANDFILL OPERABLE UNIT, DATED 1 JANUARY 2018
    Site(s): SITE 00029
    • DTSC - SACRAMENTO, CA
    • 03/16/2018
    • Correspondence
    • Record#: 001992
    • View Record
  • FINAL REMEDIAL INVESTIGATION ADDENDUM, SITE 37 GOLF COURSE LANDFILL
    Site(s): SITE 00037
  • COMMENTS ON DRAFT FINAL FOCUSED FEASIBILITY STUDY SITE 29, LANDFILL OPERABLE UNIT, DATED 1 JANUARY 2018
    Site(s): SITE 00029
    • CRWQCB - SOUTH LAKE TAHOE, CA
    • 02/09/2018
    • Correspondence
    • Record#: 001991
    • View Record
  • TRANSMITTAL OF FINAL DATA REPORT GROUNDWATER AND SOIL INVESTIGATION SITES 22, 23, 31, 32, 43, AND PROPULSION LABORATORY OPERABLE UNIT, DATED 29 JANUARY 2018
    Site(s): SITE 00008, SITE 00011, SITE 00022, SITE 00023, SITE 00031, SITE 00032, SITE 00043, SITE 00046, SITE 00049
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/30/2018
    • Correspondence
    • Record#: 001946
    • View Record
  • FINAL DATA REPORT GROUNDWATER AND SOIL INVESTIGATION SITES 22, 23, 31, 32, 43, AND PROPULSION LABORATORY OPERABLE UNIT
    Site(s): SITE 00008, SITE 00011, SITE 00022, SITE 00023, SITE 00031, SITE 00032, SITE 00043, SITE 00046, SITE 00049
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/29/2018
    • Report
    • Record#: 001948
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN, ADDITIONAL INVESTIGATION FOR LANDFILL OPERABLE UNIT LATE STATE SITES
    Site(s): SITE 00019, SITE 00022, SITE 00024, SITE 00026, SITE 00029, SITE 00030, SITE 00040
  • FINAL ACCIDENT PREVENTION PLAN ADDITION INVESTIGATION FOR LANDFILL OPERABLE UNIT EARLY STAGE SITES
    Site(s): SITE 00009, SITE 00010, SITE 00023, SITE 00027, SITE 00034, SITE 00037, SITE 00067, SITE 00084
  • RESPONSE TO COMMENTS FROM CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE-SACRAMENTO ON DRAFT FINAL REMEDIAL INVESTIGATION ADDENDUM, SITE 37, DATED 1 OCTOBER 2017
    Site(s): SITE 00037
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/05/2018
    • Correspondence
    • Record#: 002101
    • View Record
  • RESPONSE TO COMMENTS FROM MULTIPLE AGENCIES ON DRAFT REMEDIAL INVESTIGATION ADDENDUM, INSTALLATION RESTORATION PROGRAM SITE 37, GOLF COURSE LANDFILL, DATED 1 MAY 2017
    Site(s): SITE 00037
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/01/2018
    • Correspondence
    • Record#: 001754
    • View Record
  • COMMENTS ON DRAFT REMEDIAL INVESTIGATION ADDENDUM, SITE 37, GOLF COURSE LANDFILL, DATED 1 MAY 2017
    Site(s): SITE 00037
  • NOTICE OF DTSC PROJECT MANAGER CHANGE
    Site(s): BASEWIDE
  • FINAL REMEDIATION SYSTEM EVALUATION WORK PLAN, SITES 1 AND 44, ARMITAGE FIELD OPERABLE UNIT (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044
  • FINAL SEMI-ANNUAL REPORT (OCTOBER 2016 - MARCH 2017) FOR THE OPERATION AND MAINTENANCE OF THE SOIL VAPOR EXTRACTION SYSTEM, THE MOBILE PRODUCT RECOVERY SYSTEMS, AND THE SOLAR FREE PRODUCT RECOVERY SYSTEMS (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070
  • CONCURRENCE WITH RESPONSE TO COMMENTS ON REVISED DRAFT FOCUSED FEASIBILITY STUDY SITE 29, LANDFILL OPERABLE UNIT, DATED 1 SEPTEMBER 2016
    Site(s): SITE 00029
    • DTSC - SACRAMENTO, CA
    • 11/16/2017
    • Correspondence
    • Record#: 001993
    • View Record
  • TRANSMITTAL OF DRAFT WORK PLAN REMEDIAL INVESTIGATION FOR LANDFILL OPERABLE UNIT EARLY STAGE SITES, DATED 6 OCTOBER 2017
    Site(s): SITE 00009, SITE 00010, SITE 00023, SITE 00027, SITE 00034, SITE 00037, SITE 00084
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 10/10/2017
    • Correspondence
    • Record#: 001967
    • View Record
  • TRANSMITTAL OF DRAFT SITE INSPECTION FOR LANDFILL OPERABLE UNIT, AREAS OF CONCERN 85, 99, 113, 118, 124, 206, 235, 239, 242, AND 243, DATED 1 OCTOBER 2017
    Site(s): SITE 00034
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 10/10/2017
    • Correspondence
    • Record#: 001735
    • View Record
  • RESPONSE TO COMMENTS FROM MULTIPLE AGENCIES ON REVISED DRAFT FOCUSED FEASIBILITY STUDY SITE 29, C-1 EAST DISPOSAL AREA, DATED 1 SEPTEMBER 2016
    Site(s): SITE 00029
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 10/10/2017
    • Correspondence
    • Record#: 001725
    • View Record
  • MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 26 SEPTEMBER 2017
    Site(s): SITE 00006, SITE 00009, SITE 00010, SITE 00012, SITE 00037
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 09/26/2017
    • Minutes
    • Record#: 001737
    • View Record
  • COMMENTS FROM DTSC - SACRAMENTO AND CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE, DATED 5 JULY 2017 ON DRAFT REMEDIAL INVESTIGATION ADDENDUM, SITE 37, GOLF COURSE LANDFILL, DATED 1 MAY 2017
    Site(s): SITE 00037
  • COMMENTS ON DRAFT REMEDIAL INVESTIGATION ADDENDUM, SITE 37, GOLF COURSE LANDFILL, DATED 1 MAY 2017
    Site(s): SITE 00037
  • COMMENTS FROM DTSC - SACRAMENTO AND HUMAN AND ECOLOGICAL RISK OFFICE, DATED 7 SEPTEMBER 2017 ON DRAFT REMEDIAL INVESTIGATION ADDENDUM, SITES 9 AND 10, SALT WELLS ASBESTOS TRENCH AND SALT WELLS
    Site(s): SITE 00009, SITE 00010
  • COMMENTS ON DRAFT REMEDIAL INVESTIGATION ADDENDUM, SITE 37, GOLF COURSE LANDFILL, DATED 1 MAY 2017
    Site(s): SITE 00037
  • TRANSMITTAL OF FINAL FOCUSED FEASIBILITY STUDY SITE 22, PILOT PLAN ROAD LANDFILL, DATED 1 SEPTEMBER 2017
    Site(s): SITE 00022
    • NAVFAC - SOUTHWEST
    • 09/18/2017
    • Correspondence
    • Record#: 001694
    • View Record
  • TRANSMITTAL OF FINAL GEOPHYSICAL INVESTIGATION REPORT, SITE 20, 24, 25, AND 26, DATED 1 AUGUST 2017
    Site(s): SITE 00020, SITE 00024, SITE 00025, SITE 00026
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 09/08/2017
    • Correspondence
    • Record#: 001997
    • View Record
  • FINAL FOCUSED FEASIBILITY STUDY SITE 22, PILOT PLAN ROAD LANDFILL
    Site(s): SITE 00022
  • FINAL EXPLANATION OF SIGNIFICANT DIFFERENCES TO THE RECORD OF DECISION/REMEDIAL ACTION PLAN FOR SITE 6 T-RANGE DISPOSAL AREA (UNSIGNED COPY)
    Site(s): SITE 00006
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 09/01/2017
    • Report
    • Record#: 001793
    • View Record
  • TRANSMITTAL OF DRAFT SITE INSPECTION FOR AREAS OF CONCERN 166, 230, AND 235, DATED 1 AUGUST 2017
    Site(s): SITE 00082, SITE 00083, SITE 00084
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 08/22/2017
    • Correspondence
    • Record#: 001729
    • View Record
  • FINAL THIRD FIVE-YEAR REVIEW OF REMEDIAL ACTIONS AT SITES 6, 12, AND THE ARMITAGE FIELD OPERABLE UNIT
    Site(s): SITE 00006, SITE 00012
  • FINAL GEOPHYSICAL INVESTIGATION REPORT, SITE 20, 24, 25, AND 26
    Site(s): SITE 00020, SITE 00024, SITE 00025, SITE 00026
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 08/01/2017
    • Report
    • Record#: 001998
    • View Record
  • MEETING MINUTES FOR FINAL RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 25 JULY 2017
    Site(s): SITE 00009, SITE 00010, SITE 00037, SITE 00067, UXO 000002
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 07/25/2017
    • Minutes
    • Record#: 001706
    • View Record
  • COMMENTS FROM CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE - SACRAMENTO ON REVISED DRAFT FOCUSED FEASIBILITY STUDY SITE 29, C-1 EAST DISPOSAL AREA, DATED 1 SEPTEMBER 2016
    Site(s): SITE 00029
    • CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE - SACRAMENTO, CA
    • 07/19/2017
    • Correspondence
    • Record#: 001722
    • View Record
  • COMMENTS FROM CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE - SACRAMENTO ON DRAFT REMEDIAL INVESTIGATION ADDENDUM, INSTALLATION RESTORATION PROGRAM SITE 37, GOLF COURSE LANDFILL, DATED 1 MAY 2017
    Site(s): SITE 00037
    • CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE - SACRAMENTO, CA
    • 07/05/2017
    • Correspondence
    • Record#: 001751
    • View Record
  • TRANSMITTAL OF DRAFT REMEDIAL INVESTIGATION ADDENDUM, INSTALLATION RESTORATION PROGRAM SITES 9 AND 10, SALT WELLS ASBESTOS TRENCH AND SALT WELLS DISPOSAL TRENCH, DATED 1 MAY 2017
    Site(s): SITE 00009, SITE 00010
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 05/31/2017
    • Correspondence
    • Record#: 001755
    • View Record
  • TRANSMITTAL OF DRAFT REMEDIAL INVESTIGATION ADDENDUM, INSTALLATION RESTORATION PROGRAM SITE 37, GOLF COURSE LANDFILL, DATED 1 MAY 2017
    Site(s): SITE 00037
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 05/31/2017
    • Correspondence
    • Record#: 001741
    • View Record
  • REVISED FINAL ACCIDENT PREVENTION PLAN, LANDFILL OPERABLE UNIT (CD COPY ENCLOSED) [SEE RECORD # 1540 - FINAL ACCIDENT PREVENTION PLAN, LANDFILL OPERABLE UNIT]
    Site(s): AOC 000113, AOC 000235, AOC 000243, SITE 00009, SITE 00010, SITE 00027, SITE 00034, SITE 00037
  • FINAL ADDENDUM 01 TO THE FINAL WORK PLAN LANDFILL OPERABLE UNIT (CD COPY ENCLOSED) [SEE RECORD # 1572 - FINAL WORK PLAN LANDFILL OPERABLE UNIT]
    Site(s): SITE 00027, SITE 00034
  • MEETING MINUTES FOR FINAL RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 28 MARCH 2017
    Site(s): AOC 000021, AOC 000070, AOC 000102, AOC 000106, SITE 00080
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 03/28/2017
    • Minutes
    • Record#: 001705
    • View Record
  • COMMENTS ON REVISED DRAFT FOCUSED FEASIBILITY STUDY SITE 29, C-1 EAST DISPOSAL AREA, DATED 1 SEPTEMBER 2016
    Site(s): SITE 00029
  • TRANSMITTAL OF DRAFT FOCUSED FEASIBILITY STUDY FOR SITE 40 RANDSBURG WASH NO. 1, DATED 1 FEBRUARY 2017 (ENCLOSURE IS RECORD # 1677)
    Site(s): SITE 00040
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 02/27/2017
    • Correspondence
    • Record#: 001676
    • View Record
  • FINAL WORK PLAN GROUNDWATER AND SOIL INVESTIGATION AT INSTALLATION RESTORATION PROGRAM SITES 22, 23, 31, 32, 43, AND PROPULSION LABORATORY OPERABLE UNIT AND SOIL INVESTIGATION AT AREAS OF CONCERN 166, 230, AND 235
    Site(s): SITE 00022, SITE 00023, SITE 00031, SITE 00032, SITE 00043
  • FINAL ACCIDENT PREVENTION PLAN ADDITIONAL INVESTIGATION FOR INSTALLATION RESTORATION PROGRAM SITES 28, 42, 48, 52, AND 54
    Site(s): SITE 00028, SITE 00042, SITE 00048, SITE 00052, SITE 00054
  • RESPONSE TO COMMENTS FROM MULTIPLE REGULATORS ON THE DRAFT ADDENDUM 01 TO THE FINAL WORK PLAN LANDFILL OPERABLE UNIT (CD COPY ENCLOSED)
    Site(s): SITE 00024, SITE 00027, SITE 00034
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 02/01/2017
    • Correspondence
    • Record#: 001675
    • View Record
  • RESPONSES TO COMMENTS ON THE DRAFT ADDENDUM 01 TO THE FINAL WORK PLAN LANDFILL OPERABLE UNIT (CD COPY ENCLOSED)
    Site(s): SITE 00024, SITE 00027, SITE 00034
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 02/01/2017
    • Correspondence
    • Record#: 001668
    • View Record
  • FINAL MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 24 JANUARY 2017
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00006, SITE 00008, SITE 00011, SITE 00012, SITE 00044, SITE 00045, SITE 00046, SITE 00049, SITE 00050, SITE 00058
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/24/2017
    • Minutes
    • Record#: 002088
    • View Record
  • COMMENTS ON REVISED DRAFT FEASIBILITY STUDY FOR MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT, DATED 2 MAY 2014
    Site(s): SITE 00007, SITE 00013, SITE 00033, SITE 00047, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072
  • TRANSMITTAL OF FINAL SUPPLEMENTAL SITE INSPECTION REPORT MOJAVE AERIAL GUNNERY RANGE C TARGET 71 (SECTION 18), DATED 22 DECEMBER 2016
    Site(s): BASEWIDE
    • AMEC FOSTER WHEELER ENVIRONMENT AND INFRASTRUCTURE, INC.
    • 12/22/2016
    • Correspondence
    • Record#: 001890
    • Request for Record
  • FINAL SUPPLEMENTAL SITE INSPECTION REPORT MOJAVE AERIAL GUNNERY RANGE C TARGET 71 (SECTION 18)
    Site(s): BASEWIDE
    • AMEC FOSTER WHEELER ENVIRONMENT AND INFRASTRUCTURE, INC.
    • 12/22/2016
    • Report
    • Record#: 001891
    • View Record
  • FINAL 2015 DISPOSAL AREA COVER ANNUAL INSPECTION REPORT, SITE 6 (PUBLIC DOCUMENT)
    Site(s): SITE 00006
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 12/21/2016
    • Report
    • Record#: 001761
    • View Record
  • FINAL THIRD ANNUAL REPORT, MONITORED NATURAL ATTENUATION REMEDY, ARMITAGE FIELD OPERABLE UNIT (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00044, SITE 00045, SITE 00050, SITE 00058
  • FINAL FOURTH ANNUAL REPORT, MONITORED NATURAL ATTENUATION REMEDY, ARMITAGE FIELD OPERABLE UNIT (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00044, SITE 00045, SITE 00050, SITE 00058
  • FINAL 2013 ANNUAL GROUNDWATER MONITORING REPORT, AREA R OPERABLE UNIT
    Site(s): SITE 00015, SITE 00055
  • FINAL 2014 ANNUAL GROUNDWATER MONITORING REPORT, AREA R OPERABLE UNIT
    Site(s): SITE 00015, SITE 00055
  • TRANSMITTAL OF FINAL ACTION MEMORANDUM NON-TIME-CRITICAL REMOVAL ACTION PROPULSION LABORATORY OPERABLE UNIT, DATED 1 DECEMBER 2016
    Site(s): AOC 000079, SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 12/06/2016
    • Correspondence
    • Record#: 001698
    • View Record
  • COMMENTS FROM DTSC - CLOVIS ON DRAFT ADDENDUM 01 TO THE FINAL WORK PLAN, LANDFILL OPERABLE UNIT, DATED 17 MARCH 2017
    Site(s): SITE 00027, SITE 00034
    • DTSC - CLOVIS, CA
    • 12/02/2016
    • Correspondence
    • Record#: 001734
    • View Record
  • FINAL ACTION MEMORANDUM NON-TIME-CRITICAL REMOVAL ACTION PROPULSION LABORATORY OPERABLE UNIT
    Site(s): AOC 000079, SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 12/01/2016
    • Report
    • Record#: 001699
    • View Record
  • TRANSMITTAL OF THE FINAL REMOVAL ACTION WORK PLAN, PROPULSION LABORATORY OPERABLE UNIT (ENCLOSURE IS RECORD # 1647)
    Site(s): AOC 000079, SITE 00006, SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • NAVFAC - SOUTHWEST
    • 11/23/2016
    • Correspondence
    • Record#: 001646
    • View Record
  • TRANSMITTAL OF DRAFT EXPLANATION OF SIGNIFICANT DIFFERENCES TO THE RECORD OF DECISION/REMEDIAL ACTION PLAN FOR SITE 6, T-RANGE DISPOSAL AREA, DATED 1 NOVEMBER 2016
    Site(s): SITE 00006
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 11/18/2016
    • Correspondence
    • Record#: 001716
    • View Record
  • COMMENTS FROM DTSC - SACRAMENTO ON REVISED DRAFT FOCUSED FEASIBILITY STUDY SITE 29, C-1 EAST DISPOSAL AREA, DATED 1 SEPTEMBER 2016
    Site(s): SITE 00029
    • DTSC - SACRAMENTO, CA
    • 11/18/2016
    • Correspondence
    • Record#: 001723
    • View Record
  • TRANSMITTAL OF REPLACEMENT PAGES FOR FINAL BASEWIDE GROUNDWATER SAMPLING PROGRAM AND IMPLEMENTATION WORK PLAN, DATED 3 NOVEMBER 2016
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00012, SITE 00013, SITE 00015, SITE 00033, SITE 00043, SITE 00044, SITE 00045, SITE 00047, SITE 00049, SITE 00050, SITE 00051, SITE 00055, SITE 00056, SITE 00058, SITE 00059, SITE 00072
    • AECOM - ENVIROCON, JOINT VENTURE
    • 11/17/2016
    • Correspondence
    • Record#: 001849
    • View Record
  • FINAL REMOVAL ACTION WORK PLAN, PROPULSION LABORATORY OPERABLE UNIT (CD COPY ENCLOSED) [SEE RECORD # 1646 - NAVFAC SW TRANSMITTAL LETTER]
    Site(s): AOC 000079, SITE 00006, SITE 00008, SITE 00011, SITE 00046, SITE 00049
  • FINAL BASEWIDE GROUNDWATER SAMPLING PROGRAM AND IMPLEMENTATION WORK PLAN
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00007, SITE 00012, SITE 00013, SITE 00015, SITE 00033, SITE 00043, SITE 00044, SITE 00045, SITE 00047, SITE 00049, SITE 00051, SITE 00056, SITE 00058, SITE 00059, SITE 00071, SITE 00072
  • TRANSMITTAL OF FINAL BASEWIDE GROUNDWATER SAMPLING PROGRAM AND IMPLEMENTATION WORK PLAN, DATED 3 NOVEMBER 2016
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00012, SITE 00013, SITE 00015, SITE 00033, SITE 00043, SITE 00044, SITE 00045, SITE 00047, SITE 00049, SITE 00050, SITE 00051, SITE 00055, SITE 00056, SITE 00058, SITE 00059, SITE 00072
    • AECOM - ENVIROCON, JOINT VENTURE
    • 11/03/2016
    • Correspondence
    • Record#: 001848
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN PROPULSION LABORATORY OPERABLE UNIT (CD COPY ENCLOSED)
    Site(s): AOC 000079, SITE 00006, SITE 00008, SITE 00011, SITE 00046, SITE 00049
  • REVIEW AND COMMENTS ON THE DRAFT 2014 ANNUAL GROUNDWATER MONITORING REPORT, MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT (SEE RECORD # 1598 - DRAFT 2014 ANNUAL GROUNDWATER MONITORING REPORT, MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT)
    Site(s): AOC 000234, SITE 00007, SITE 00013, SITE 00033, SITE 00047, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072
    • CRWQCB - LAKE TAHOE, CA
    • 10/14/2016
    • Correspondence
    • Record#: 001662
    • View Record
  • COMMENTS FROM DTSC - SACRAMENTO ON REVISED DRAFT FOCUSED FEASIBILITY STUDY SITE 29, C-1 EAST DISPOSAL AREA, DATED 1 SEPTEMBER 2016
    Site(s): SITE 00029
    • DTSC - SACRAMENTO, CA
    • 10/12/2016
    • Correspondence
    • Record#: 001724
    • View Record
  • COMMENTS FROM CRWQCB - LAKE TAHOE ON DRAFT ADDENDUM 01 TO THE FINAL WORK PLAN, LANDFILL OPERABLE UNIT, DATED 17 MARCH 2017
    Site(s): SITE 00027, SITE 00034
    • CRWQCB - LAKE TAHOE, CA
    • 10/07/2016
    • Correspondence
    • Record#: 001733
    • View Record
  • MEETING MINUTES FOR FINAL RESTORATION ADVISORY BOARD MEETING HELD ON 17 MAY 2016 (INCLUDES PRESENTATION; DOCUMENT TRACKING SHEET; AND CD COPY)
    Site(s): AOC 000166, AOC 000230, AOC 000235, SITE 00006, SITE 00012, SITE 00022, SITE 00023, SITE 00031, SITE 00032, SITE 00043
  • FINAL WORK PLAN OPERATION AND MAINTENANCE OF THE SOIL VAPOR EXTRACTION SYSTEM, THE MOBILE PRODUCT RECOVERY SYSTEM, AND THE SOLAR FREE PRODUCT RECOVERY SYSTEM (PUBLIC DOCUMENT)
    Site(s): BASEWIDE
  • FINAL MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 27 SEPTEMBER 2016
    Site(s): SITE 00001, SITE 00006, SITE 00012, SITE 00028, SITE 00029, SITE 00042, SITE 00043, SITE 00044, SITE 00048, SITE 00054, SITE 00070, SITE 00080
  • TRANSMITTAL OF REVISED DRAFT FOCUSED FEASIBILITY STUDY FOR SITE 29, C-1 EAST DISPOSAL AREA, DATED 1 SEPTEMBER 2016
    Site(s): SITE 00029
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 09/20/2016
    • Correspondence
    • Record#: 001727
    • View Record
  • TRANSMITTAL OF THE DRAFT REMOVAL ACTION WORK PLAN, PROPULSION LABORATORY (ENCLOSURE IS RECORD # 1631)
    Site(s): AOC 000079, SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • NAVFAC - SOUTHWEST
    • 09/19/2016
    • Correspondence
    • Record#: 001630
    • View Record
  • TRANSMITTAL OF THE DRAFT FINAL WORK PLAN, ADDITIONAL INVESTIGATION (ENCLOSURE IS RECORD # 1643)
    Site(s): SITE 00014, SITE 00016, SITE 00017, SITE 00018, SITE 00028, SITE 00048, SITE 00063, SITE 00074, SITE 00076, SITE 00078
    • RORE, INC.
    • 09/14/2016
    • Correspondence
    • Record#: 001642
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT ACTION MEMORANDUM, NON-TIME CRITICAL REMOVAL ACTION, PROPULSION LABORATORY OPERABLE UNIT (SEE RECORD # 1626 - DRAFT ACTION MEMORANDUM, NON-TIME CRITICAL REMOVAL ACTION, PROPULSION LABORATORY OPERABLE UNIT)
    Site(s): AOC 000079, SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • CRWQCB - LAKE TAHOE, CA
    • 09/02/2016
    • Correspondence
    • Record#: 001660
    • View Record
  • REVISED FINAL ACCIDENT PREVENTION PLAN GEOPHYSICAL INVESTIGATION SITES 20, 24, 25, AND 26
    Site(s): SITE 00020, SITE 00024, SITE 00025, SITE 00026
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 07/06/2016
    • Report
    • Record#: 001774
    • View Record
  • REVISED FINAL GEOPHYSICAL INVESTIGATION WORK PLAN FOR SITES 20, 24, 25, AND 26
    Site(s): SITE 00020, SITE 00024, SITE 00025, SITE 00026
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 07/01/2016
    • Report
    • Record#: 001708
    • View Record
  • REVIEW AND COMMENTS ON THE REVISED DRAFT RECORD OF DECISION/REMEDIAL ACTION PLAN (SEE RECORD # 1574 - REVISED DRAFT RECORD OF DECISION/REMEDIAL ACTION PLAN)
    Site(s): OU AREA R, SITE 00015, SITE 00051, SITE 00055, SITE 00056, SITE 00057, SITE 00064
    • CRWQCB - LAKE TAHOE, CA
    • 06/30/2016
    • Correspondence
    • Record#: 001658
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT 2014 ANNUAL GROUNDWATER MONITORING REPORT, MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT (SEE RECORD # 1598 - DRAFT 2014 ANNUAL GROUNDWATER MONITORING REPORT, MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT)
    Site(s): AOC 000234, SITE 00007, SITE 00013, SITE 00033, SITE 00047, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072
  • TRANSMITTAL OF THE REVISED DRAFT FINAL FOCUSED FEASIBILITY STUDY, PILOT PLANT ROAD LANDFILL (ENCLOSURE IS RECORD # 1629)
    Site(s): SITE 00022
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 06/08/2016
    • Correspondence
    • Record#: 001628
    • View Record
  • PUBLIC NOTICE - NOTICE OF AVAILABILITY AND 30 DAY PUBLIC COMMENT PERIOD FOR DRAFT ACTION MEMORANDUM FOR NON-TIME CRITICAL REMOVAL ACTION, SITES 8, 11, 46, AND 49, AND AREA OF CONCERN 79, PROPULSION LABORATORY OPERABLE UNIT, DATED 1 MAY 2016
    Site(s): SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • ROCKETEER - CHINA LAKE, CA
    • 05/26/2016
    • Public Notice
    • Record#: 002024
    • View Record
  • PUBLIC NOTICE - NOTICE OF AVAILABILITY AND 30 DAY PUBLIC COMMENT PERIOD FOR DRAFT ACTION MEMORANDUM FOR NON-TIME CRITICAL REMOVAL ACTION, SITES 8, 11, 46, AND 49, AND AREA OF CONCERN 79, PROPULSION LABORATORY OPERABLE UNIT, DATED 1 MAY 2016
    Site(s): SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • RIDGECREST DAILY INDEPENDENT - RIDGECREST, CA
    • 05/25/2016
    • Public Notice
    • Record#: 002023
    • View Record
  • REVIEW AND COMMENTS ON THE 1) DRAFT 2013 ANNUAL GROUNDWATER MONITORING REPORT; AND 2) DRAFT 2014 ANNUAL GROUNDWATER MONITORING REPORT
    Site(s): OU AREA R, SITE 00015, SITE 00051, SITE 00055, SITE 00056, SITE 00057, SITE 00064
    • CRWQCB - LAKE TAHOE, CA
    • 05/24/2016
    • Correspondence
    • Record#: 001656
    • View Record
  • TRANSMITTAL OF THE DRAFT ACTION MEMORANDUM, NON-TIME CRITICAL REMOVAL ACTION, PROPULSION LABORATORY OPERABLE UNIT (ENCLOSURE IS RECORD # 1626)
    Site(s): AOC 000079, SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 05/23/2016
    • Correspondence
    • Record#: 001625
    • View Record
  • REVIEW AND COMMENTS ON THE DRAFT WORK PLAN, ADDITIONAL INVESTIGATION (SEE RECORD # 1539 - DRAFT WORK PLAN, ADDITIONAL INVESTIGATION)
    Site(s): SITE 00014, SITE 00016, SITE 00017, SITE 00018, SITE 00028, SITE 00048, SITE 00063, SITE 00074, SITE 00076, SITE 00078
    • CRWQCB - LAKE TAHOE, CA
    • 05/19/2016
    • Correspondence
    • Record#: 001654
    • View Record
  • MEETING MINUTES FOR FINAL RESTORATION ADVISORY BOARD MEETING HELD ON 26 JANUARY 2016
    Site(s): AOC 000085, AOC 000099, AOC 000113, AOC 000118, AOC 000124, AOC 000206, AOC 000235, AOC 000239, AOC 000242, AOC 000243, SITE 00006, SITE 00012, SITE 00057, SITE 00064, SITE 00076
  • COMMENTS ON DRAFT RECORD OF DECISION/REMEDIAL ACTION PLAN, PROPULSION LABORATORY OPERABLE UNIT, DATED 1 JUNE 2014
    Site(s): SITE 00008, SITE 00011, SITE 00046, SITE 00049
  • TRANSMITTAL OF DRAFT ADDENDUM 01 TO THE FINAL WORK PLAN, LANDFILL OPERABLE UNIT, DATED 17 MARCH 2016
    Site(s): SITE 00027, SITE 00034
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 03/18/2016
    • Correspondence
    • Record#: 001731
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN FOR GROUNDWATER MONITORING AND SOIL SAMPLING AT MULTIPLE SITES, SITE 6 AND SITE 12 POST-CLOSURE ACTIVITIES, AND SITE INSPECTION AT HIGH PRIORITY AREAS OF CONCERN (PUBLIC DOCUMENT)
    Site(s): SITE 00006, SITE 00012
  • TRANSMITTAL OF FINAL WORK PLAN GROUNDWATER AND SOIL INVESTIGATION AT INSTALLATION RESTORATION PROGRAM SITES 22, 23, 31, 32, 43, AND PROPULSION LABORATORY OPERABLE UNIT AND SOIL INVESTIGATION AT AREAS OF CONCERN 166, 230, AND 235, DATED 25 FEBRUARY 2016
    Site(s): SITE 00022, SITE 00023, SITE 00031, SITE 00032, SITE 00043
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 02/29/2016
    • Correspondence
    • Record#: 001766
    • View Record
  • MONTHLY COMPLIANCE REPORT FOR JANUARY 2016 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • REVIEW AND COMMENTS ON THE DRAFT BASIS FOR NO FURTHER ACTION DETERMINATION (INCLUDES COMMENTS BY HUMAN AND ECOLOGICAL RISK OFFICE, DATED 16 AND 30 JULY 2015; AND CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE, DATED 27 OCTOBER 2015)
    Site(s): SITE 00004, SITE 00035, SITE 00036, SITE 00038, SITE 00039, SITE 00052, SITE 00053, SITE 00059, SITE 00061, SITE 00065, SITE 00066, SITE 00073, SITE 00075, SITE 00077
    • DTSC - CLOVIS, CA
    • 02/10/2016
    • Correspondence
    • Record#: 001651
    • View Record
  • TRANSMITTAL OF THE FINAL FEASIBILITY STUDY, FIRE DIVISION CARRIER DECK FIRE FACILITY (ENCLOSURE IS RECORD # 1619)
    Site(s): SITE 00043
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/18/2016
    • Correspondence
    • Record#: 001618
    • View Record
  • MONTHLY COMPLIANCE REPORT FOR DECEMBER 2015 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • REVIEW AND COMMENTS ON THE DRAFT BASIS FOR NO FURTHER ACTION DETERMINATION (SEE RECORD # 1556 - DRAFT BASIS FOR NO FURTHER ACTION DETERMINATION)
    Site(s): SITE 00004, SITE 00035, SITE 00036, SITE 00038, SITE 00039, SITE 00052, SITE 00053, SITE 00059, SITE 00061, SITE 00065, SITE 00066, SITE 00073, SITE 00075, SITE 00077
    • CRWQCB - LAKE TAHOE, CA
    • 01/06/2016
    • Correspondence
    • Record#: 001650
    • View Record
  • TRANSMITTAL OF THE ANNUAL REPORT (OCTOBER 2014 - SEPTEMBER 2015) FOR OPERATION AND MAINTENANCE OF SOIL VAPOR EXTRACTION SYSTEM, OF THE FREE PRODUCT RECOVERY SYSTEMS, AND OF THE SOLAR PRODUCT RECOVERY SYSTEMS (ENCLOSURE IS RECORD # 1606)
    Site(s): SITE 00001, SITE 00044, SITE 00070
  • FINAL FEASIBILITY STUDY FOR SITE 43, FIRE DIVISION CARRIER DECK FIRE FACILITY
    Site(s): SITE 00043
  • MONTHLY COMPLIANCE REPORT FOR NOVEMBER 2015 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • MONTHLY COMPLIANCE REPORT FOR OCTOBER 2015 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • FINAL MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 17 NOVEMBER 2015
    Site(s): SITE 00014, SITE 00015, SITE 00016, SITE 00017, SITE 00018, SITE 00022, SITE 00028, SITE 00048, SITE 00055, SITE 00057, SITE 00063, SITE 00064, SITE 00070, SITE 00074, SITE 00076, SITE 00078, SITE 00080
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 11/17/2015
    • Minutes
    • Record#: 002083
    • View Record
  • ANNUAL COMPLIANCE REPORT FOR SOIL VAPOR EXTRACTION SYSTEM OPERATIONS AT THE OLD FUEL FARM AT ARMITAGE FIELD, 1 OCTOBER 2014 - 30 SEPTEMBER 2015 (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • MONTHLY COMPLIANCE REPORT FOR SEPTEMBER 2015 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • TRANSMITTAL OF THE DRAFT 2014 ANNUAL GROUNDWATER MONITORING REPORT, OPERABLE UNIT AREA (ENCLOSURE IS RECORD # 1604)
    Site(s): SITE 00015, SITE 00055
  • TRANSMITTAL OF THE FINAL SITE MANAGEMENT PLAN (ENCLOSURE IS RECORD # 1613)
    Site(s): AOC 000001, AOC 000003, AOC 000007, AOC 000019, AOC 000021, AOC 000022, AOC 000029, AOC 000032, AOC 000036, AOC 000045, AOC 000050, AOC 000059, AOC 000064, AOC 000070, AOC 000079, AOC 000082, AOC 000083, AOC 000085, AOC 000098, AOC 000099, AOC 000102, AOC 000106, AOC 000113, AOC 000118, AOC 000120, AOC 000122, AOC 000124, AOC 000131, AOC 000143, AOC 000154, AOC 000161, AOC 000163, AOC 000166, AOC 000173, AOC 000176, AOC 000180, AOC 000200, AOC 000201, AOC 000202, AOC 000203, AOC 000205, AOC 000206, AOC 000207, AOC 000208, AOC 000211, AOC 000212, AOC 000213, AOC 000217, AOC 000220, AOC 000221, AOC 000227, AOC 000228, AOC 000229, AOC 000230, AOC 000231, AOC 000232, AOC 000234, AOC 000235, AOC 000239, AOC 000241, AOC 000242, AOC 000243, SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017, SITE 00018, SITE 00019, SITE 00020, SITE 00021, SITE 00022, SITE 00023, SITE 00024, SITE 00025, SITE 00026, SITE 00027, SITE 00028, SITE 00029, SITE 00030, SITE 00031, SITE 00032, SITE 00033, SITE 00034, SITE 00035, SITE 00036, SITE 00037, SITE 00038, SITE 00039, SITE 00040, SITE 00041, SITE 00042, SITE 00043, SITE 00044, SITE 00045, SITE 00046, SITE 00047, SITE 00048, SITE 00049, SITE 00050, SITE 00051, SITE 00052, SITE 00053, SITE 00054, SITE 00055, SITE 00056, SITE 00057, SITE 00058, SITE 00059, SITE 00060, SITE 00061, SITE 00062, SITE 00063, SITE 00064, SITE 00065, SITE 00066, SITE 00067, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072, SITE 00073, SITE 00074, SITE 00075, SITE 00076, SITE 00077, SITE 00078, SITE 00079, SITE 00080, UST 0000010
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 10/05/2015
    • Correspondence
    • Record#: 001612
    • View Record
  • FINAL SITE MANAGEMENT PLAN
    Site(s): AOC 000001, AOC 000003, AOC 000007, AOC 000019, AOC 000021, AOC 000022, AOC 000029, AOC 000032, AOC 000036, AOC 000045, AOC 000050, AOC 000059, AOC 000064, AOC 000070, AOC 000079, AOC 000082, AOC 000083, AOC 000085, AOC 000098, AOC 000099, AOC 000102, AOC 000106, AOC 000113, AOC 000118, AOC 000120, AOC 000122, AOC 000124, AOC 000131, AOC 000143, AOC 000154, AOC 000161, AOC 000163, AOC 000166, AOC 000173, AOC 000176, AOC 000180, AOC 000200, AOC 000201, AOC 000202, AOC 000203, AOC 000205, AOC 000206, AOC 000207, AOC 000208, AOC 000211, AOC 000212, AOC 000213, AOC 000217, AOC 000220, AOC 000221, AOC 000227, AOC 000228, AOC 000229, AOC 000230, AOC 000231, AOC 000232, AOC 000234, AOC 000235, AOC 000239, AOC 000241, AOC 000242, AOC 000243, SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017, SITE 00018, SITE 00019, SITE 00020, SITE 00021, SITE 00022, SITE 00023, SITE 00024, SITE 00025, SITE 00026, SITE 00027, SITE 00028, SITE 00029, SITE 00030, SITE 00031, SITE 00032, SITE 00033, SITE 00034, SITE 00035, SITE 00036, SITE 00037, SITE 00038, SITE 00039, SITE 00040, SITE 00041, SITE 00042, SITE 00043, SITE 00044, SITE 00045, SITE 00046, SITE 00047, SITE 00048, SITE 00049, SITE 00050, SITE 00051, SITE 00052, SITE 00053, SITE 00054, SITE 00055, SITE 00056, SITE 00057, SITE 00058, SITE 00059, SITE 00060, SITE 00061, SITE 00062, SITE 00063, SITE 00064, SITE 00065, SITE 00066, SITE 00067, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072, SITE 00073, SITE 00074, SITE 00075, SITE 00076, SITE 00077, SITE 00078, SITE 00079, SITE 00080, UST 0000010
  • MONTHLY COMPLIANCE REPORT FOR AUGUST 2015 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • MONTHLY COMPLIANCE REPORT FOR JULY 2015 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • MONTHLY COMPLIANCE REPORT FOR JUNE 2015 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • TRANSMITTAL OF THE DRAFT FINAL FOCUSED FEASIBILITY STUDY, PILOT PLANT ROAD LANDFILL (ENCLOSURE IS RECORD # 1594)
    Site(s): SITE 00022
  • TRANSMITTAL OF THE DRAFT 2014 ANNUAL GROUNDWATER MONITORING REPORT, MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT (ENCLOSURE IS RECORD # 1598)
    Site(s): AOC 000234, SITE 00007, SITE 00013, SITE 00033, SITE 00047, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 07/13/2015
    • Correspondence
    • Record#: 001597
    • Request for Record
  • TRANSMITTAL OF THE DRAFT FOCUSED FEASIBILITY STUDY, C-1 EAST DISPOSAL AREA (ENCLOSURE IS RECORD # 1592)
    Site(s): SITE 00029
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 06/19/2015
    • Correspondence
    • Record#: 001591
    • Request for Record
  • MONTHLY COMPLIANCE REPORT FOR MAY 2015 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • TRANSMITTAL OF THE FINAL RESOURCE CONSERVATION AND RECOVERY ACT FACILITY ASSESSMENT SAMPLING VISIT REPORT, MAINSITE AREA (ENCLOSURE IS RECORD # 1588)
    Site(s): BASEWIDE
  • FINAL RESOURCE CONSERVATION AND RECOVERY ACT FACILITY ASSESSMENT SAMPLING VISIT REPORT, MAINSITE AREA (CD COPY ENCLOSED) [SEE RECORD # 1587 - NAWS CHINA LAKE TRANSMITTAL LETTER]
    Site(s): BASEWIDE
  • FINAL MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 19 MAY 2015
    Site(s): SITE 00001, SITE 00002, SITE 00014, SITE 00016, SITE 00017, SITE 00018, SITE 00028, SITE 00043, SITE 00044, SITE 00045, SITE 00048, SITE 00063, SITE 00070, SITE 00074, SITE 00076, SITE 00078, UST 0000010
  • MONTHLY COMPLIANCE REPORT FOR APRIL 2015 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • MONTHLY COMPLIANCE REPORT FOR MARCH 2015 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • REVIEW AND COMMENTS ON THE DRAFT RECORD OF DECISION/REMEDIAL ACTION PLAN PROPULSION LABORATORY OPERABLE UNIT (SEE RECORD # 1499 - DRAFT RECORD OF DECISION/REMEDIAL ACTION PLAN PROPULSION LABORATORY OPERABLE UNIT)
    Site(s): AOC 000079, SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • CRWQCB - VICTORVILLE, CA
    • 04/17/2015
    • Correspondence
    • Record#: 001666
    • View Record
  • 24 MARCH 2015 FINAL RESTORATION ADVISORY BOARD (RAB) MEETING MINUTES (INCLUDES VARIOUS HANDOUTS; AND CD COPY)
    Site(s): SITE 00006, SITE 00014, SITE 00016, SITE 00017, SITE 00018, SITE 00028, SITE 00029, SITE 00048, SITE 00070, SITE 00071, SITE 00074, SITE 00076, SITE 00078, UXO 000002
  • TRANSMITTAL OF THE DRAFT RESOURCE CONSERVATION AND RECOVERY ACT FACILITY ASSESSMENT SAMPLING VISIT REPORT, MAINSITE AREA (ENCLOSURE IS RECORD # 1584)
    Site(s): BASEWIDE
  • MONTHLY COMPLIANCE REPORT FOR FEBRUARY 2015 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • REVIEW AND CONCURRENCE WITH THE FINAL BASIS FOR NO FURTHER ACTION DETERMINATION, CT-4 DISPOSAL AREA (SEE RECORD # 1558 - FINAL BASIS FOR NO FURTHER ACTION DETERMINATION, CT-4 DISPOSAL AREA)
    Site(s): SITE 00021
    • DTSC - CLOVIS, CA
    • 03/02/2015
    • Correspondence
    • Record#: 001664
    • View Record
  • TRANSMITTAL OF THE FINAL BASIS FOR NO FURTHER ACTION DETERMINATION, CT-4 DISPOSAL AREA (ENCLOSURE IS RECORD # 1558)
    Site(s): SITE 00021
  • MONTHLY COMPLIANCE REPORT FOR JANUARY 2015 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • FINAL BASIS FOR NO FURTHER ACTION DETERMINATION, CT-4 DISPOSAL AREA (INCLUDES REGULATORY CONCURRENCE LETTERS FOR CLOSURE OF THIS SITE; AND CD COPY) [SEE RECORD # 1557 - NAVFAC SW TRANSMITTAL LETTER]
    Site(s): SITE 00021
  • MONTHLY COMPLIANCE REPORT FOR DECEMBER 2014 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • FINAL MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 27 JANUARY 2015
    Site(s): SITE 00070, UXO 000002
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/27/2015
    • Minutes
    • Record#: 002082
    • View Record
  • TRANSMITTAL OF THE FINAL WORK PLAN LANDFILL OPERABLE UNIT (ENCLOSURE IS RECORD # 1572)
    Site(s): AOC 000085, AOC 000099, AOC 000113, AOC 000118, AOC 000124, AOC 000154, AOC 000206, AOC 000211, AOC 000235, AOC 000239, AOC 000242, AOC 000243, SITE 00009, SITE 00010, SITE 00021, SITE 00027, SITE 00029, SITE 00034, SITE 00037, SITE 00040, SITE 00041
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 01/22/2015
    • Correspondence
    • Record#: 001571
    • Request for Record
  • FINAL WORK PLAN LANDFILL OPERABLE UNIT
    Site(s): AOC 000085, AOC 000099, AOC 000113, AOC 000118, AOC 000124, AOC 000154, AOC 000206, AOC 000211, AOC 000235, AOC 000239, AOC 000242, AOC 000243, SITE 00009, SITE 00010, SITE 00021, SITE 00027, SITE 00029, SITE 00034, SITE 00037, SITE 00040, SITE 00041
  • MONTHLY COMPLIANCE REPORT FOR NOVEMBER 2014 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • FINAL ACCIDENT PREVENTION PLAN LANDFILL OPERABLE UNIT (CD COPY ENCLOSED) [SEE RECORD # 1688 - REVISED FINAL ACCIDENT PREVENTION PLAN, LANDFILL OPERABLE UNIT]
    Site(s): AOC 000113, AOC 000235, AOC 000243, SITE 00009, SITE 00010, SITE 00027, SITE 00034, SITE 00037
  • TRANSMITTAL OF THE DRAFT REPORT OF SITE CHARACTERIZATION AND ANALYSIS PENETROMETER SYSTEM INVESTIGATION OF THE WESTERN EXTENT OF PETROLEUM HYDROCARBONS (ENCLOSURE IS RECORD # 1576)
    Site(s): SITE 00070
  • MONTHLY COMPLIANCE REPORT FOR OCTOBER 2014 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • 18 NOVEMBER 2014 FINAL RESTORATION ADVISORY BOARD (RAB) MEETING MINUTES (INCLUDES VARIOUS HANDOUTS, AND CD COPY)
    Site(s): SITE 00006, SITE 00012, SITE 00014, SITE 00015, SITE 00016, SITE 00017, SITE 00018, SITE 00020, SITE 00024, SITE 00025, SITE 00026, SITE 00028, SITE 00048, SITE 00051, SITE 00055, SITE 00057, SITE 00063, SITE 00074, SITE 00076, SITE 00078
  • TRANSMITTAL OF THE REVISED DRAFT RECORD OF DECISION/REMEDIAL ACTION PLAN (ENCLOSURE IS RECORD # 1574)
    Site(s): SITE 00015, SITE 00051, SITE 00055, SITE 00056, SITE 00057, SITE 00064
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 11/13/2014
    • Correspondence
    • Record#: 001573
    • Request for Record
  • COMMENTS ON REVISED DRAFT FEASIBILITY STUDY FOR MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT, DATED 2 MAY 2014
    Site(s): SITE 00007, SITE 00013, SITE 00033, SITE 00047, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072
  • TRANSMITTAL OF THE DRAFT REPORT OF JUNE 2014 GROUNDWATER MONITORING (ENCLOSURE IS RECORD # 1562)
    Site(s): SITE 00070
  • TRANSMITTAL OF THE DRAFT WORK PLAN, ADDITIONAL INVESTIGATION (ENCLOSURE IS RECORD # 1539)
    Site(s): SITE 00014, SITE 00016, SITE 00017, SITE 00018, SITE 00028, SITE 00048, SITE 00063, SITE 00074, SITE 00076, SITE 00078
  • ANNUAL COMPLIANCE REPORT FOR SOIL VAPOR EXTRACTION SYSTEM OPERATIONS AT THE OLD FUEL FARM AT ARMITAGE FIELD, 1 OCTOBER 2013 - 30 SEPTEMBER 2014 (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • MONTHLY COMPLIANCE REPORT FOR SEPTEMBER 2014 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • TRANSMITTAL OF DRAFT REMEDIAL DESIGN REPORT, SOIL EXCAVATION AND CORRECTIVE ACTION MANAGEMENT UNIT, PROPULSION LABORATORY OPERABLE UNIT, DATED 1 OCTOBER 2014 (PUBLIC DOCUMENT)
    Site(s): SITE 00006, SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 10/16/2014
    • Correspondence
    • Record#: 001536
    • View Record
  • COMMENTS ON DRAFT RECORD OF DECISION/REMEDIAL ACTION PLAN, PROPULSION LABORATORY OPERABLE UNIT, DATED 1 JUNE 2014
    Site(s): SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • DTSC - SACRAMENTO, CA
    • 10/14/2014
    • Correspondence
    • Record#: 002019
    • View Record
  • COMMENTS ON DRAFT RECORD OF DECISION/REMEDIAL ACTION PLAN, PROPULSION LABORATORY OPERABLE UNIT, DATED 1 JUNE 2014
    Site(s): SITE 00008, SITE 00011, SITE 00046, SITE 00049
  • MONTHLY COMPLIANCE REPORT FOR AUGUST 2014 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • 23 SEPTEMBER 2014 FINAL RESTORATION ADVISORY BOARD (RAB) MEETING MINUTES (INCLUDES VARIOUS HANDOUTS, AND CD COPY)
    Site(s): AOC 000166, AOC 000230, AOC 000235, SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00012, SITE 00021, SITE 00022, SITE 00023, SITE 00031, SITE 00032, SITE 00041, SITE 00043, SITE 00070
  • REVIEW AND CONCURRENCE WITH THE FINAL WORK PLAN/SAMPLING AND ANALYSIS PLAN FOR NEW MONITORING WELLS AT AREA R AND WELL REPAIRS AT THE ARMITAGE FIELD
    Site(s): OU AREA R, SITE 00001, SITE 00002, SITE 00003, SITE 00014, SITE 00044, SITE 00045, SITE 00050, SITE 00051, SITE 00055, SITE 00056, SITE 00057, SITE 00058, SITE 00064
    • DTSC - CLOVIS, CA
    • 09/03/2014
    • Correspondence
    • Record#: 001670
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN, GEOPHYSICAL INVESTIGATION (CD COPY ENCLOSED)
    Site(s): SITE 00020, SITE 00024, SITE 00025, SITE 00026
  • FINAL WORK PLAN/SAMPLING AND ANALYSIS PLAN FOR NEW MONITORING WELLS AT AREA R AND WELL REPAIRS AT THE ARMITAGE FIELD
    Site(s): OU AREA R, SITE 00001, SITE 00002, SITE 00003, SITE 00015, SITE 00044, SITE 00045, SITE 00050, SITE 00051, SITE 00055, SITE 00056, SITE 00057, SITE 00058, SITE 00064
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 08/29/2014
    • Report
    • Record#: 001548
    • View Record
  • TRANSMITTAL OF THE FINAL WORK PLAN/SAMPLING AND ANALYSIS PLAN FOR NEW MONITORING WELLS AT AREA R AND WELL REPAIRS AT THE ARMITAGE FIELD (ENCLOSURE IS RECORD # 1548)
    Site(s): OU AREA R, SITE 00001, SITE 00002, SITE 00003, SITE 00015, SITE 00044, SITE 00045, SITE 00050, SITE 00051, SITE 00055, SITE 00056, SITE 00057, SITE 00058, SITE 00064
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 08/29/2014
    • Correspondence
    • Record#: 001547
    • Request for Record
  • MONTHLY COMPLIANCE REPORT FOR JULY 2014 SOIL VAPOR EXTRACTION SYSTEM OPERATION AT THE OLD FUEL FARM AT ARMITAGE FIELD (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • COMMENTS FROM CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE - SACRAMENTO ON REVISED DRAFT FEASIBILITY STUDY FOR MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT, DATED 2 MAY 2014
    Site(s): SITE 00007, SITE 00013, SITE 00033, SITE 00047, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072
    • CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE - SACRAMENTO, CA
    • 08/14/2014
    • Correspondence
    • Record#: 001745
    • View Record
  • FINAL ADDENDUM 02 TO THE ACCIDENT PREVENTION PLAN FOR BASEWIDE GROUNDWATER SAMPLING
    Site(s): OU AREA R, SITE 00001, SITE 00002, SITE 00007, SITE 00013, SITE 00015, SITE 00033, SITE 00044, SITE 00045, SITE 00047, SITE 00055, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072
  • TRANSMITTAL OF THE DRAFT WORK PLAN, GROUNDWATER INVESTIGATION AND SOIL INVESTIGATION (ENCLOSURE IS RECORD # 1645)
    Site(s): AOC 000166, AOC 000230, AOC 000235, SITE 00022, SITE 00023, SITE 00031, SITE 00032, SITE 00043
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 07/30/2014
    • Correspondence
    • Record#: 001644
    • View Record
  • TRANSMITTAL OF DRAFT WORK PLAN/SAMPLING AND ANALYSIS PLAN FOR NEW WELLS AND WELL REPAIRS AT THE ARMITAGE FIELD OPERABLE UNIT, DATED 17 JULY 2014
    Site(s): OU AREA R
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 07/25/2014
    • Correspondence
    • Record#: 001515
    • View Record
  • 22 JULY 2014 FINAL RESTORATION ADVISORY BOARD (RAB) MEETING MINUTES (INCLUDES VARIOUS HANDOUTS, AND CD COPY)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00009, SITE 00012, SITE 00022, SITE 00043, SITE 00070
  • TRANSMITTAL OF DRAFT SITE MANAGEMENT PLAN, DATED 1 JULY 2014
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00004, SITE 00005, SITE 00006, SITE 00007, SITE 00008, SITE 00009, SITE 00010, SITE 00011, SITE 00012, SITE 00013, SITE 00014, SITE 00015, SITE 00016, SITE 00017, SITE 00018, SITE 00019, SITE 00020, SITE 00021, SITE 00022, SITE 00023, SITE 00024, SITE 00025, SITE 00026, SITE 00027, SITE 00028, SITE 00029, SITE 00030, SITE 00031, SITE 00032, SITE 00033, SITE 00034, SITE 00035, SITE 00036, SITE 00037, SITE 00038, SITE 00039, SITE 00040, SITE 00041, SITE 00042, SITE 00043, SITE 00044, SITE 00045, SITE 00046, SITE 00047, SITE 00048, SITE 00049, SITE 00050, SITE 00051, SITE 00052, SITE 00053, SITE 00054, SITE 00055, SITE 00056, SITE 00057, SITE 00058, SITE 00059, SITE 00060, SITE 00061, SITE 00062, SITE 00063, SITE 00064, SITE 00065, SITE 00066, SITE 00067, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072, SITE 00073, SITE 00074, SITE 00075, SITE 00076, SITE 00077, SITE 00078, SITE 00079, SITE 00080
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 07/16/2014
    • Correspondence
    • Record#: 001534
    • View Record
  • COMMENTS FROM DTSC - SACRAMENTO ON REVISED DRAFT FEASIBILITY STUDY FOR MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT, DATED 2 MAY 2014
    Site(s): SITE 00007, SITE 00013, SITE 00033, SITE 00047, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072
    • DTSC - SACRAMENTO, CA
    • 07/09/2014
    • Correspondence
    • Record#: 001744
    • View Record
  • TRANSMITTAL OF DRAFT SITE 6 POST-CLOSURE MAINTENANCE PLAN, DATED 1 JUNE 2014 (PUBLIC DOCUMENT)
    Site(s): SITE 00006
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 06/30/2014
    • Correspondence
    • Record#: 001530
    • View Record
  • SEMI-ANNUAL REPORT (OCTOBER 2013 - MARCH 2014) FOR OPERATION AND MAINTENANCE OF THE; SOIL VAPOR EXTRACTION SYSTEM, FREE PRODUCT RECOVERY SYSTEMS, AND SOLAR PRODUCT RECOVERY SYSTEMS (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070
  • TRANSMITTAL OF DRAFT RECORD OF DECISION/REMEDIAL ACTION PLAN, PROPULSION LABORATORY OPERABLE UNIT, DATED 1 JUNE 2014
    Site(s): SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 06/16/2014
    • Correspondence
    • Record#: 001498
    • Request for Record
  • TRANSMITTAL OF DRAFT BASIS FOR NO FURTHER ACTION DETERMINATION SITE 21, CT-4 DISPOSAL AREA, DATED 1 MAY 2014
    Site(s): SITE 00021
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 05/30/2014
    • Correspondence
    • Record#: 002106
    • View Record
  • TRANSMITTAL OF FINAL REPORT OF MARCH 2013 GROUNDWATER MONITORING, FORMER PUBLIC WORKS GAS STATION, DATED 1 MAY 2014 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000003
    • RICHARD BRADY AND ASSOCIATES
    • 05/30/2014
    • Correspondence
    • Record#: 001518
    • View Record
  • 27 MAY 2014 RESTORATION ADVISORY BOARD (RAB) MEETING MINUTES (INCLUDES DISCUSSION OF PROPULSION LABORATORY OPERABLE UNIT (PLOU) RECORD OF DECISION UPDATE; VARIOUS HANDOUTS; AND CD COPY)
    Site(s): SITE 00006, SITE 00008, SITE 00049, SITE 00070
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 05/27/2014
    • Minutes
    • Record#: 001514
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN, SITE CHARACTERIZATION AND ANALYSIS PENETROMETER SYSTEMS INVESTIGATION OF THE WESTERN EXTENT OF PETROLEUM HYDROCARBONS AT SITE 70
    Site(s): SITE 00070
  • FINAL REPORT OF MARCH 2013 GROUNDWATER MONITORING, FORMER PUBLIC WORKS GAS STATION (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000003
    • RICHARD BRADY AND ASSOCIATES
    • 05/01/2014
    • Report
    • Record#: 001519
    • View Record
  • FINAL WORK PLAN SITE CHARACTERIZATION AND ANALYSIS PENETROMETER SYSTEM INVESTIGATION OF THE WESTERN EXTEND OF PETROLEUM HYDROCARBONS (CD COPY ENCLOSED) [SEE RECORD # 1509 - RICHARD BRADY AND ASSOCIATES TRANSMITTAL LETTER]
    Site(s): SITE 00070
  • FINAL WORK PLAN FOR OPTIMIZATION, OPERATION, AND MAINTENANCE OF SOIL VAPOR EXTRACTION SYSTEM; OPERATION AND MAINTENANCE OF FREE PRODUCT RECOVERY SYSTEMS; AND OPERATION AND MAINTENANCE OF SOLAR PRODUCT RECOVERY SYSTEM (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070
  • FINAL RESPONSE TO COMMENTS, MEETING MINUTES, AND ADDITIONAL CORRESPONDENCE RELATED TO THE TECHNICAL MEMORANDUM: RISK ASSESSMENT UPDATE AND REMEDIAL ACTION OPTIMIZATION REVIEW (REFERRED TO AS THE OPTIMIZATION REVIEW) PROPULSION LABORATORY OPERABLE UNIT
    Site(s): SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/01/2014
    • Correspondence
    • Record#: 001503
    • View Record
  • 25 MARCH 2014 FINAL RESTORATION ADVISORY BOARD (RAB) MEETING MINUTES (INCLUDES VARIOUS HANDOUTS; AND CD COPY)
    Site(s): AOC 000154, AOC 000211, AOC 000235, AOC 000243, SITE 00001, SITE 00009, SITE 00010, SITE 00021, SITE 00027, SITE 00029, SITE 00034, SITE 00037, SITE 00040, SITE 00041, SITE 00070
  • TRANSMITTAL OF DRAFT MAY 2013 SEMIANNUAL GROUNDWATER MONITORING REPORT FOR NAVAL AIR FIELD GAS STATION, DATED 14 FEBRUARY 2014
    Site(s): BASEWIDE
    • TRIECO - TETRA TECH EM, INC., JOINT VENTURE
    • 02/14/2014
    • Correspondence
    • Record#: 001828
    • View Record
  • COMMENTS ON DRAFT REPORT OF MARCH 2013 GROUNDWATER MONITORING
    Site(s): SITE 00070
  • COMMENTS ON DRAFT WORK PLAN, SITE CHARACTERIZATION AND ANALYSIS PENETROMETER SYSTEM INVESTIGATION OF THE WESTERN EXTENT OF PETROLEUM HYDROCARBONS AT SITE 70, DATED 30 AUGUST 2013
    Site(s): SITE 00008, SITE 00011, SITE 00046, SITE 00049
  • RESPONSE TO REQUEST FOR IDENTIFICATION OF STATE APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS FOR THE FEASIBILITY STUDY AT SITES 7, 13, 33, 47, 68, 69, 70, 71, 72, AND AREA OF CONCERN 234 (MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT), DATED 26 AUGUST 2013
    Site(s): SITE 00007, SITE 00013, SITE 00033, SITE 00047, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072
  • REQUEST FOR IDENTIFICATION OF STATE APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS FOR THE FEASIBILITY STUDY AT SITES 7, 13, 33, 47, 68, 69, 70, 71, AND 72 AND AREA OF CONCERN 234, MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT
    Site(s): SITE 00007, SITE 00013, SITE 00033, SITE 00047, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072
    • CRWQCB - VICTORVILLE, CA
    • 12/13/2013
    • Correspondence
    • Record#: 001749
    • View Record
  • FINAL REMEDIAL ALTERNATIVE ANALYSIS, AREA OF CONCERN 211, SUPERSONIC NAVAL ORDNANCE RESEARCH TRACK DUMP WEST
    Site(s): SITE 00022
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 12/03/2013
    • Report
    • Record#: 002096
    • View Record
  • FINAL REMEDIAL ALTERNATIVES ANALYSIS, AREA OF CONCERN 154, RANDSBURG WASH LAND SITE TRENCHES
    Site(s): SITE 00022
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 12/03/2013
    • Report
    • Record#: 002097
    • View Record
  • ANNUAL COMPLIANCE REPORT FOR SOIL VAPOR EXTRACTION SYSTEM OPERATIONS AT THE OLD FUEL FARM AT ARMITAGE FIELD, 1 OCTOBER 2012 - 30 SEPTEMBER 2013 (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • CONCURRENCE WITH DRAFT WORK PLAN, SITE CHARACTERIZATION AND ANALYSIS PENETROMETER SYSTEM INVESTIGATION OF THE WESTERN EXTENT OF PETROLEUM HYDROCARBONS AT SITE 70, DATED 30 AUGUST 2013
    Site(s): SITE 00070
    • DTSC - CLOVIS, CA
    • 10/16/2013
    • Correspondence
    • Record#: 001486
    • View Record
  • FINAL ADDENDUM 01 TO THE ACCIDENT PREVENTION PLAN FOR BASEWIDE GROUNDWATER SAMPLING
    Site(s): OU AREA R, SITE 00001, SITE 00002, SITE 00007, SITE 00013, SITE 00015, SITE 00033, SITE 00044, SITE 00045, SITE 00047, SITE 00055, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072
  • TRANSMITTAL OF FINAL WORK PLAN, RESOURCE CONSERVATION AND RECOVERY ACT FACILITY ASSESSMENT SAMPLING VISIT, DATED 1 SEPTEMBER 2013
    Site(s): SITE 00002, SITE 00003, SITE 00025, SITE 00054, SITE 00055, SITE 00079
    • RICHARD BRADY AND ASSOCIATES
    • 10/01/2013
    • Correspondence
    • Record#: 001419
    • View Record
  • APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS FOR INSTALLATION RESTORATION SITES 7, 13, 33, 47, 68, 69, 70, 71, 72, AND AREA OF CONCERN 234 WHICH REPRESENT THE MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT
    Site(s): SITE 00007, SITE 00013, SITE 00033, SITE 00047, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072
    • CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE - SACRAMENTO, CA
    • 09/25/2013
    • Correspondence
    • Record#: 001748
    • View Record
  • 18 SEPTEMBER 2013 FINAL RESTORATION ADVISORY BOARD (RAB) MEETING MINUTES (INCLUDES VARIOUS HANDOUTS; AND CD COPY) [DOCUMENT ALSO CONTAINS SENSITIVE STREET LEVEL MAPS]
    Site(s): SITE 00001, SITE 00006, SITE 00012, SITE 00022, SITE 00043, SITE 00044, SITE 00045, SITE 00068, SITE 00070
  • TRANSMITTAL OF DRAFT REPORT OF MARCH 2013 GROUNDWATER MONITORING, SITE 70, DATED 1 SEPTEMBER 2013 (PUBLIC DOCUMENT)
    Site(s): SITE 00070
    • RICHARD BRADY AND ASSOCIATES
    • 09/06/2013
    • Correspondence
    • Record#: 001523
    • View Record
  • FINAL WORK PLAN, RESOURCE CONSERVATION AND RECOVERY ACT FACILITY ASSESSMENT SAMPLING VISIT
    Site(s): SITE 00002, SITE 00003, SITE 00025, SITE 00054, SITE 00055, SITE 00079
  • REQUEST FOR IDENTIFICATION OF STATE APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS FOR THE FEASIBILITY STUDY AT SITES 7, 13, 33, 47, 68, 69, 70, 71, 72, AND AREA OF CONCERN 234 (MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT)
    Site(s): SITE 00007, SITE 00013, SITE 00033, SITE 00047, SITE 00068, SITE 00069, SITE 00070, SITE 00071, SITE 00072
    • NAVFAC - SOUTHWEST
    • 08/26/2013
    • Correspondence
    • Record#: 001491
    • View Record
  • COMMENTS ON DRAFT REMEDIAL ACTION COMPLETION REPORT, SITE 45, DATED 13 JUNE 2013 (PUBLIC DOCUMENT)
    Site(s): SITE 00045
    • DTSC - CLOVIS, CA
    • 08/01/2013
    • Correspondence
    • Record#: 001484
    • View Record
  • TRANSMITTAL OF SEMI-ANNUAL REPORT (OCTOBER 2012-MARCH 2013) FOR OPERATION AND MAINTENANCE OF SOIL VAPOR EXTRACTION SYSTEM, OPERATION AND MAINTENANCE OF THE FREE PRODUCT RECOVERY SYSTEMS, AND OPERATION AND MAINTENANCE OF THE SOLAR PRODUCT RECOVERY SYSTEM, DATED 22 JULY 2013 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070
  • SEMI-ANNUAL REPORT (OCTOBER 2012-MARCH 2013) FOR OPERATION AND MAINTENANCE OF SOIL VAPOR EXTRACTION SYSTEM, OPERATION AND MAINTENANCE OF FREE PRODUCT RECOVERY SYSTEMS, AND OPERATION AND MAINTENANCE OF SOLAR PRODUCT RECOVERY SYSTEM (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070
  • COMMENTS ON DRAFT FEASIBILITY STUDY FOR SITE 43, FIRE DIVISION CARRIER DECK FIRE FACILITY, DATED 1 FEBRUARY 2012
    Site(s): SITE 00043
  • FINAL ADDENDUM 01 TO THE FINAL BASEWIDE GROUNDWATER SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN)
    Site(s): OU AREA R, SITE 00001, SITE 00002, SITE 00007, SITE 00013, SITE 00015, SITE 00033, SITE 00044, SITE 00045, SITE 00055, SITE 00068, SITE 00069
  • COMMENTS ON DRAFT GROUNDWATER MONITORING REPORT, FORMER PUBLIC WORKS GAS STATION, DATED 21 DECEMBER 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000003
    • CRWQCB - VICTORVILLE, CA
    • 05/20/2013
    • Correspondence
    • Record#: 001473
    • View Record
  • COMMENTS ON DRAFT FINAL BASEWIDE GROUNDWATER SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN), DATED 15 FEBRUARY 2013
    Site(s): OU AREA R, SITE 00001, SITE 00002, SITE 00015, SITE 00044, SITE 00045, SITE 00055
  • COMMENTS ON DRAFT FOCUSED FEASIBILITY STUDY FOR SITE 22, PILOT PLANT ROAD LANDFILL, DATED 1 MARCH 2012
    Site(s): SITE 00022
    • CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE - SACRAMENTO, CA
    • 04/19/2013
    • Correspondence
    • Record#: 001471
    • Request for Record
  • FINAL MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 17 APRIL 2013
    Site(s): SITE 00006, SITE 00012, SITE 00068
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 04/17/2013
    • Minutes
    • Record#: 001452
    • View Record
  • CONCURRENCE WITH DRAFT GROUNDWATER MONITORING REPORT, FORMER PUBLIC WORKS GAS STATION, DATED 21 DECEMBER 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000003
    • DTSC - CLOVIS, CA
    • 04/05/2013
    • Correspondence
    • Record#: 001494
    • View Record
  • COMMENTS ON DRAFT GROUNDWATER MONITORING REPORT, SITE 70, DATED 21 DECEMBER 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00070
    • CRWQCB - VICTORVILLE, CA
    • 03/15/2013
    • Correspondence
    • Record#: 001474
    • View Record
  • COMMENTS ON DRAFT FOCUSED FEASIBILITY STUDY FOR SITE 22, PILOT PLANT ROAD LANDFILL, DATED 1 MARCH 2012
    Site(s): SITE 00022
    • DTSC - SACRAMENTO, CA
    • 03/05/2013
    • Correspondence
    • Record#: 001490
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN FOR BASEWIDE GROUNDWATER SAMPLING
    Site(s): SITE 00001, SITE 00002, SITE 00015, SITE 00044, SITE 00045, SITE 00055
  • COMMENTS ON DRAFT FOCUSED FEASIBILITY STUDY FOR SITE 22, PILOT PLANT ROAD LANDFILL, DATED 1 MARCH 2012
    Site(s): SITE 00022
    • DTSC - SACRAMENTO, CA
    • 02/25/2013
    • Correspondence
    • Record#: 001470
    • View Record
  • COMMENTS ON DRAFT FOCUSED FEASIBILITY STUDY FOR SITE 22, PILOT PLANT ROAD LANDFILL, DATED 1 MARCH 2012
    Site(s): SITE 00022
  • FINAL BASEWIDE GROUNDWATER SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN)
    Site(s): SITE 00001, SITE 00002, SITE 00015, SITE 00044, SITE 00045, SITE 00055
  • ANNUAL REPORT (OCTOBER 2011 - SEPTEMBER 2012) FOR OPERATION OF THE SOIL VAPOR EXTRACTION SYSTEM AND FREE PRODUCT RECOVERY SYSTEMS AT NAVAL AIR WEAPONS STATION (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00043, SITE 00044, SITE 00070
  • COMMENTS ON RESPONSE TO COMMENTS ON TECHNICAL MEMORANDUM - RISK ASSESSMENT UPDATE AND REMEDIAL ACTION OPTIMIZATION FOR PROPULSION LABORATORY OPERABLE UNIT, DATED 17 OCTOBER 2012
    Site(s): AOC 000079, SITE 00008, SITE 00011, SITE 00046, SITE 00049
  • COMMENTS ON 1) RESPONSE TO COMMENTS ON TECHNICAL MEMORANDUM-RISK ASSESSMENT UPDATE AND REMEDIAL ACTION OPTIMIZATION FOR PROPULSION LABORATORY OPERABLE UNIT; 2) PATH FORWARD FOR PROPULSION LABORATORY OPERABLE UNIT RECORD OF DECISION BASED ON COMMENTS ON OPTIMIZATION REVIEW; AND 3) CHANGES TO CHEMICALS OF CONCERN AND PLANNED EXCAVATION VOLUME, AND TO REMEDIATION GOALS
    Site(s): AOC 000079, SITE 00008, SITE 00011, SITE 00046, SITE 00049
  • COMMENTS ON TECHNICAL MEMORANDUM - RISK ASSESSMENT UPDATE AND REMEDIAL ACTION OPTIMIZATION FOR PROPULSION LABORATORY OPERABLE UNIT, DATED 17 OCTOBER 2012
    Site(s): AOC 000079, SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • CALIFORNIA DEPARTMENT OF FISH AND WILDLIFE - SACRAMENTO, CA
    • 01/31/2013
    • Correspondence
    • Record#: 001460
    • Request for Record
  • CONCURRENCE WITH DRAFT BASEWIDE GROUNDWATER SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN), DATED 23 JULY 2012
    Site(s): SITE 00001, SITE 00002, SITE 00015, SITE 00044, SITE 00045, SITE 00055
    • DTSC - CLOVIS, CA
    • 01/30/2013
    • Correspondence
    • Record#: 001497
    • View Record
  • COMMENTS ON DRAFT TECHNICAL JUSTIFICATION FOR BENEFICIAL USE CHANGES FOR GROUNDWATER IN SALT WELLS VALLEY AND SHALLOW GROUNDWATER IN EASTERN INDIAN WELLS VALLEY, DATED 25 MAY 2012
    Site(s): BASEWIDE
    • CRWQCB - SOUTH LAKE TAHOE, CA
    • 01/28/2013
    • Correspondence
    • Record#: 001467
    • View Record
  • FINAL SECOND ANNUAL REPORT, MONITORED NATURAL ATTENUATION REMEDY, ARMITAGE FIELD OPERABLE UNIT (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00044, SITE 00045
  • COMMENTS ON DRAFT SUPPLEMENTAL SITE INSPECTION FOR NON-OPERABLE UNIT SITES AND SELECTED AREAS OF CONCERN, DATED 5 JULY 2012
    Site(s): AOC 000003, AOC 000019, AOC 000021, AOC 000022, AOC 000029, AOC 000045, AOC 000050, SITE 00004, SITE 00008, SITE 00010, SITE 00016, SITE 00017, SITE 00019, SITE 00020, SITE 00021, SITE 00023, SITE 00024, SITE 00025, SITE 00026, SITE 00028, SITE 00030, SITE 00035, SITE 00036, SITE 00038, SITE 00040, SITE 00042, SITE 00046, SITE 00052, SITE 00053, SITE 00054, SITE 00059, SITE 00061, SITE 00062, SITE 00063, SITE 00065, SITE 00066, SITE 00067, SITE 00071, SITE 00073, SITE 00074, SITE 00076, SITE 00077, SITE 00078
    • CRWQCB - VICTORVILLE, CA
    • 12/19/2012
    • Correspondence
    • Record#: 001465
    • View Record
  • COMMENTS ON TECHNICAL MEMORANDUM - RISK ASSESSMENT UPDATE AND REMEDIAL ACTION OPTIMIZATION FOR PROPULSION LABORATORY OPERABLE UNIT, DATED 17 OCTOBER 2012
    Site(s): AOC 000079, SITE 00008, SITE 00011, SITE 00046, SITE 00049
  • COMMENTS ON DRAFT SUPPLEMENTAL SITE INSPECTION FOR NON-OPERABLE UNIT SITES AND SELECTED AREAS OF CONCERN, DATED 5 JULY 2012
    Site(s): AOC 000019, AOC 000021, AOC 000022, AOC 000029, AOC 000045, AOC 000050, SITE 00004, SITE 00008, SITE 00010, SITE 00014, SITE 00016, SITE 00017, SITE 00018, SITE 00019, SITE 00020, SITE 00021, SITE 00023, SITE 00024, SITE 00025, SITE 00026, SITE 00028, SITE 00030, SITE 00035, SITE 00036, SITE 00038, SITE 00040, SITE 00042, SITE 00046, SITE 00052, SITE 00053, SITE 00054, SITE 00059, SITE 00061, SITE 00062, SITE 00063, SITE 00065, SITE 00066, SITE 00067, SITE 00071, SITE 00073, SITE 00074, SITE 00076, SITE 00077, SITE 00078
    • CALIFORNIA DEPARTMENT OF FISH AND GAME - SACRAMENTO, CA
    • 12/18/2012
    • Correspondence
    • Record#: 001464
    • View Record
  • COMMENTS FROM DTSC-SACRAMENTO AND HUMAN AND ECOLOGICAL RISK OFFICE ON TECHNICAL MEMORANDUM - RISK ASSESSMENT UPDATE AND REMEDIAL ACTION OPTIMIZATION FOR PROPULSION LABORATORY OPERABLE UNIT, DATED 17 OCTOBER 2012
    Site(s): AOC 000079, SITE 00008, SITE 00011, SITE 00046, SITE 00049
  • ANNUAL COMPLIANCE REPORT FOR SOIL VAPOR EXTRACTION SYSTEM OPERATIONS AT THE OLD FUEL FARM AT ARMITAGE FIELD, 1 OCTOBER 2011 - 30 SEPTEMBER 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • TECHNICAL MEMORANDUM - RISK ASSESSMENT UPDATE AND REMEDIAL ACTION OPTIMIZATION FOR PROPULSION LABORATORY OPERABLE UNIT
    Site(s): SITE 00008, SITE 00011, SITE 00046, SITE 00049
  • FINAL GEOPHYSICAL INVESTIGATION WORK PLAN (INCLUDES RESPONSES TO COMMENTS ON THE DRAFT AS APPENDIX A, DCN: KCH-2622-0038-0022)
    Site(s): SITE 00020, SITE 00024, SITE 00025, SITE 00026
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 10/01/2012
    • Report
    • Record#: 001507
    • View Record
  • CONCURRENCE WITH DRAFT TECHNICAL JUSTIFICATION FOR BENEFICIAL USE CHANGES FOR GROUNDWATER IN SALT WELLS VALLEY AND SHALLOW GROUNDWATER IN EASTERN INDIAN WELLS VALLEY, DATED 25 MAY 2012
    Site(s): BASEWIDE
  • COMMENTS ON DRAFT SUPPLEMENTAL SITE INSPECTION FOR NON-OPERABLE UNIT SITES AND SELECTED AREAS OF CONCERN, DATED 5 JULY 2012
    Site(s): SITE 00004
    • DTSC - SACRAMENTO, CA
    • 09/26/2012
    • Correspondence
    • Record#: 001463
    • View Record
  • COMMENTS ON DRAFT SUPPLEMENTAL SITE INSPECTION FOR NON-OPERABLE UNIT SITES AND SELECTED AREAS OF CONCERN, DATED 5 JULY 2012
    Site(s): SITE 00016, SITE 00052, SITE 00061
    • DTSC - SACRAMENTO, CA
    • 09/20/2012
    • Correspondence
    • Record#: 001466
    • View Record
  • COMMENTS ON 1) DRAFT GEOPHYSICAL INVESTIGATION WORK PLAN SITES 19, 20, 24, 25, 26, AND 30, DATED 1 FEBRUARY 2012; 2) DRAFT GEOPHYSICAL INVESTIGATION WORK PLAN, MOJAVE AERIAL GUNNERY RANGE C TARGET 71 (SECTION 18), DATED 1 FEBRUARY 2012; AND 3) DRAFT SECOND FIVE-YEAR REVIEW OF REMEDIAL ACTIONS, DATED 30 JANUARY 2012
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00006, SITE 00012, SITE 00019, SITE 00020, SITE 00024, SITE 00025, SITE 00026, SITE 00030, SITE 00044, SITE 00045, SITE 00050, SITE 00058
    • PLEISTOCENE FOUNDATION
    • 09/17/2012
    • Correspondence
    • Record#: 001332
    • View Record
  • COMMENTS ON DRAFT SUPPLEMENTAL SITE INSPECTION FOR NON-OPERABLE UNIT SITES AND SELECTED AREAS OF CONCERN, DATED 5 JULY 2012
    Site(s): AOC 000003, AOC 000021, AOC 000022, AOC 000045, AOC 000050, SITE 00004, SITE 00008, SITE 00010, SITE 00014, SITE 00016, SITE 00017, SITE 00018, SITE 00019, SITE 00020, SITE 00021, SITE 00023, SITE 00024, SITE 00025, SITE 00026, SITE 00028, SITE 00030, SITE 00035, SITE 00036, SITE 00038, SITE 00040, SITE 00042, SITE 00046, SITE 00052, SITE 00053, SITE 00054, SITE 00059, SITE 00061, SITE 00062, SITE 00063, SITE 00065, SITE 00066, SITE 00067, SITE 00071, SITE 00073, SITE 00074, SITE 00076, SITE 00077, SITE 00078
  • COMMENTS ON DRAFT BASE WIDE GROUNDWATER SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN), DATED 23 JULY 2012
    Site(s): SITE 00012
    • DTSC - SACRAMENTO, CA
    • 08/24/2012
    • Correspondence
    • Record#: 001320
    • View Record
  • FINAL SECOND FIVE-YEAR REVIEW OF REMEDIAL ACTIONS (CD COPY ENCLOSED) [SEE RECORD # 1342 - TRIECO - TETRA TECH EM, INC. TRANSMITTAL LETTER] (PUBLIC DOCUMENT)
    Site(s): SITE 00006, SITE 00012
  • SEMI-ANNUAL REPORT (OCTOBER 2011 - MARCH 2012) FOR OPERATION OF THE SOIL VAPOR EXTRACTION SYSTEM AND FREE PRODUCT RECOVERY SYSTEMS (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070
  • MEETING MINUTES FOR SITE 43 FEASIBILITY STUDY CONFERENCE CALL HELD ON 10 JULY 2012
    Site(s): SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 07/10/2012
    • Minutes
    • Record#: 002021
    • View Record
  • COMMENTS ON DRAFT AFTER ACTION COMPLETION REPORT, SITE 68, DATED 10 APRIL 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00068
    • DTSC - CLOVIS, CA
    • 06/18/2012
    • Correspondence
    • Record#: 001321
    • View Record
  • COMMENTS ON DRAFT FOCUSED FEASIBILITY STUDY FOR SITE 22, PILOT PLANT ROAD LANDFILL, DATED 1 MARCH 2012
    Site(s): SITE 00022
  • CONCURRENCE WITH TECHNICAL MEMORANDUM TO FILE, JUSTIFICATION FOR NON-SIGNIFICANT OR MINOR POST-RECORD OF DECISION CHANGE, SITE 6, DATED 18 APRIL 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00006
    • CRWQCB - VICTORVILLE, CA
    • 05/23/2012
    • Correspondence
    • Record#: 001346
    • View Record
  • COMMENTS ON DRAFT FEASIBILITY STUDY FOR SITE 43, FIRE DIVISION CARRIER DECK FIRE FACILITY, DATED 1 FEBRUARY 2012
    Site(s): SITE 00043
  • TRANSMITTAL OF DRAFT REMEDIAL ACTION COMPLETION REPORT, SITE 6, DATED 01 MAY 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00006
    • TETRA TECH EC, INC.
    • 05/18/2012
    • Correspondence
    • Record#: 001301
    • View Record
  • COMMENTS ON DRAFT FEASIBILITY STUDY, FIRE DIVISION CARRIER DECK FIRE FACILITY, SITE 43, DATED 1 FEBRUARY 2012
    Site(s): SITE 00043
    • CALIFORNIA DEPARTMENT OF FISH AND GAME - SACRAMENTO, CA
    • 05/15/2012
    • Correspondence
    • Record#: 002045
    • View Record
  • CONCURRENCE WITH DRAFT WORK PLAN, GROUNDWATER MONITORING, PUBLIC WORKS GAS STATION AND SITE 70, DATED 12 MARCH 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00070
    • CRWQCB - VICTORVILLE, CA
    • 05/15/2012
    • Correspondence
    • Record#: 001323
    • View Record
  • COMMENTS ON DRAFT GEOPHYSICAL INVESTIGATION WORK PLAN, SITES 19, 20, 24, 25, 26, AND 30, DATED 1 FEBRUARY 2012
    Site(s): SITE 00019, SITE 00020, SITE 00024, SITE 00025, SITE 00026, SITE 00030
    • CRWQCB - VICTORVILLE, CA
    • 05/04/2012
    • Correspondence
    • Record#: 001329
    • View Record
  • CONCURRENCE WITH DRAFT GEOPHYSICAL INVESTIGATION WORK PLAN, MOJAVE AERIAL GUNNERY RANGE C TARGET 71 (SECTION 18), DATED 1 FEBRUARY 2012
    Site(s): SITE 00019, SITE 00020, SITE 00024, SITE 00025, SITE 00026, SITE 00030
    • DTSC - CLOVIS, CA
    • 05/02/2012
    • Correspondence
    • Record#: 001327
    • View Record
  • COMMENTS ON DRAFT FEASIBILITY STUDY FOR SITE 43, FIRE DIVISION CARRIER DECK FIRE FACILITY, DATED 1 FEBRUARY 2012
    Site(s): SITE 00043
  • COMMENTS ON 1) DRAFT GEOPHYSICAL INVESTIGATION WORK PLAN SITES 19, 20, 24, 25, 26, AND 30, DATED 1 FEBRUARY 2012; 2) DRAFT GEOPHYSICAL INVESTIGATION WORK PLAN, MOJAVE AERIAL GUNNERY RANGE C TARGET 71 (SECTION 18), DATED 1 FEBRUARY 2012; AND 3) DRAFT SECOND FIVE-YEAR REVIEW OF REMEDIAL ACTIONS, DATED 30 JANUARY 2012
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00006, SITE 00012, SITE 00019, SITE 00020, SITE 00024, SITE 00025, SITE 00026, SITE 00030, SITE 00044, SITE 00045, SITE 00050, SITE 00058
    • PUBLIC CITIZEN
    • 04/16/2012
    • Correspondence
    • Record#: 001333
    • View Record
  • COMMENTS ON DRAFT WORK PLAN, GROUNDWATER MONITORING, PUBLIC WORKS GAS STATION AND SITE 70, DATED 12 MARCH 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00070
    • RESTORATION ADVISORY BOARD MEMBER
    • 04/14/2012
    • Correspondence
    • Record#: 001325
    • View Record
  • TRANSMITTAL OF DRAFT AFTER ACTION COMPLETION REPORT, SITE 68, DATED 10 APRIL 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00068
  • CONCURRENCE WITH DRAFT GEOPHYSICAL INVESTIGATION WORK PLAN, MOJAVE AERIAL GUNNERY RANGE C TARGET 71 (SECTION 18), DATED 1 FEBRUARY 2012
    Site(s): BASEWIDE
    • CRWQCB - VICTORVILLE, CA
    • 04/04/2012
    • Correspondence
    • Record#: 001326
    • View Record
  • COMMENTS ON DRAFT TECHNICAL MEMORANDUM TO FILE, JUSTIFICATION FOR NON-SIGNIFICANT OR MINOR POST-RECORD OF DECISION CHANGE, SITE 6, DATED 12 JANUARY 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00006
    • DTSC - CLOVIS, CA
    • 03/29/2012
    • Correspondence
    • Record#: 001376
    • View Record
  • TRANSMITTAL OF RESPONSE TO COMMENTS ON DRAFT TECHNICAL MEMORANDUM TO FILE, JUSTIFICATION FOR NON-SIGNIFICANT OR MINOR POST-RECORD OF DECISION CHANGE, SITE 6, DATED 12 JANUARY 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00006
    • NAVFAC - SOUTHWEST
    • 03/20/2012
    • Correspondence
    • Record#: 002077
    • View Record
  • COMMENTS ON DRAFT SECOND FIVE-YEAR REVIEW OF REMEDIAL ACTIONS, DATED 30 JANUARY 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00006, SITE 00012, SITE 00044, SITE 00045, SITE 00050, SITE 00058
    • CRWQCB - VICTORVILLE, CA
    • 03/16/2012
    • Correspondence
    • Record#: 001289
    • View Record
  • ANNUAL REPORT (OCTOBER 2010 - SEPTEMBER 2011) FOR OPERATION OF THE SOIL VAPOR EXTRACTION SYSTEM AND FREE PRODUCT RECOVERY SYSTEMS (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070
  • OPERATION AND MAINTENANCE MANUAL FOR THE FREE PRODUCT RECOVERY SYSTEMS AT SITE 44 (PUBLIC DOCUMENT)
    Site(s): SITE 00044
  • TRANSMITTAL OF DRAFT WORK PLAN, GROUNDWATER MONITORING, PUBLIC WORKS GAS STATION AND SITE 70, DATED 12 MARCH 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00070
    • RICHARD BRADY AND ASSOCIATES
    • 03/12/2012
    • Correspondence
    • Record#: 001303
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN GROUNDWATER MONITORING, PUBLIC WORKS GAS STATION AND SITE 70
    Site(s): SITE 00070
  • TRANSMITTAL OF DRAFT FOCUSED FEASIBILITY STUDY FOR SITE 22, PILOT PLANT ROAD LANDFILL, DATED 1 MARCH 2012
    Site(s): SITE 00022
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 03/09/2012
    • Correspondence
    • Record#: 001282
    • View Record
  • COMMENTS ON DRAFT TECHNICAL MEMORANDUM TO FILE, JUSTIFICATION FOR NON-SIGNIFICANT OR MINOR POST-RECORD OF DECISION CHANGE, SITE 6, DATED 12 JANUARY 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00006
    • CRWQCB - VICTORVILLE, CA
    • 03/02/2012
    • Correspondence
    • Record#: 001375
    • View Record
  • TRANSMITTAL OF DRAFT FEASIBILITY STUDY FOR SITE 43, FIRE DIVISION CARRIER DECK FIRE FACILITY, DATED 1 FEBRUARY 2012
    Site(s): SITE 00043
    • CH2M HILL - KLEINFELDER, JOINT VENTURE
    • 02/28/2012
    • Correspondence
    • Record#: 001284
    • View Record
  • CONCURRENCE WITH FINAL LAND USE CONTROL ACTIVITIES REPORT YEAR 2010, SNORT ROAD LANDFILL, DATED 1 JUNE 2011 (PUBLIC DOCUMENT)
    Site(s): SITE 00012
  • RESPONSE TO REQUEST FOR EXPLOSIVES SAFETY SUBMISSION DETERMINATION REQUEST FOR DIGITAL GEOPHYSICAL MAPPING AT MOJAVE AERIAL GUNNERY RANGE C TARGET 71, SECTION 18
    Site(s): BASEWIDE
    • NAVAL ORDNANCE SAFETY AND SECURITY ACTIVITY - INDIAN HEAD, MD
    • 02/07/2012
    • Correspondence
    • Record#: 001410
    • View Record
  • TRANSMITTAL OF DRAFT SUMMARY REPORT, RESOURCE CONSERVATION AND RECOVERY ACT FACILITY ASSESSMENT, SAMPLING VISIT ACTIVITIES AT ARMITAGE AIRFIELD, DATED 31 JANUARY 2012
    Site(s): BASEWIDE
    • NAWS CHINA LAKE - CHINA LAKE, CA
    • 01/31/2012
    • Correspondence
    • Record#: 001305
    • View Record
  • TRANSMITTAL OF DRAFT SECOND FIVE-YEAR REVIEW OF REMEDIAL ACTIONS, DATED 30 JANUARY 2012 (PUBLIC DOCUMENT)
    Site(s): SITE 00006, SITE 00012
  • GROUNDWATER MONITORING REPORT FOR FORMER PUBLIC WORKS GAS STATION (PUBLIC DOCUMENT)
    Site(s): UST 000003
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE NAVAL AIR FIELD GAS STATION, DATED 29 NOVEMBER 2011 (PUBLIC DOCUMENT)
    Site(s): BASEWIDE
  • GROUNDWATER MONITORING REPORT FOR NAVAL AIR FIELD GAS STATION (PUBLIC DOCUMENT)
    Site(s): UST 000001
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE FORMER PUBLIC WORKS GAS STATION, DATED 29 NOVEMBER 2011 (PUBLIC DOCUMENT)
    Site(s): BASEWIDE
  • FINAL REMOVAL ACTION WORK PLAN, SITE 68, REVISION 1
    Site(s): SITE 00068
    • CDM FEDERAL PROGRAMS CORP.
    • 11/22/2011
    • Report
    • Record#: 001276
    • View Record
  • FINAL MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 16 NOVEMBER 2011
    Site(s): SITE 00012, SITE 00022, SITE 00043, SITE 00045, SITE 00051, SITE 00055
  • ANNUAL COMPLIANCE REPORT FOR SOIL VAPOR EXTRACTION SYSTEM OPERATIONS AT THE OLD FUEL FARM AT ARMITAGE FIELD, 1 OCTOBER 2010 - 30 SEPTEMBER 2011 (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • COMMENTS ON DRAFT SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN), REMEDIAL DESIGN FOR MONITORED NATURAL ATTENUATION, AREA R OPERABLE UNIT, DATED 1 MARCH 2011 (PUBLIC DOCUMENT)
    Site(s): SITE 00015, SITE 00055, SITE 00056
    • CRWQCB - VICTORVILLE, CA
    • 09/12/2011
    • Correspondence
    • Record#: 001287
    • View Record
  • REQUEST FOR ADDITIONAL INFORMATION ON THE PROPOSED AMENDMENT TO REMOVE MUNICIPAL AND DOMESTIC SUPPLY BENEFICIAL USE DESIGNATION FOR GROUNDWATER IN SALT WELLS VALLEY AND SHALLOW GROUNDWATER IN EASTERN INDIAN WELLS VALLEY
    Site(s): BASEWIDE
    • CRWQCB - VICTORVILLE, CA
    • 08/31/2011
    • Correspondence
    • Record#: 001286
    • View Record
  • REQUEST FOR IDENTIFICATION OF POTENTIAL STATE APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS FOR THE FEASIBILITY STUDY FOR SITE 22, THE PILOT PLANT ROAD LANDFILL
    Site(s): SITE 00022
    • NAVFAC - SOUTHWEST
    • 08/16/2011
    • Correspondence
    • Record#: 001271
    • View Record
  • TRANSMITTAL OF SEMI-ANNUAL REPORT (OCTOBER 2010-MARCH 2011) FOR OPERATION OF THE SOIL VAPOR EXTRACTION SYSTEM AND FREE PRODUCT RECOVERY SYSTEMS, DATED 3 AUGUST 2011 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070
  • SEMI-ANNUAL REPORT (OCTOBER 2010-MARCH 2011), FOR OPERATION OF THE SOIL VAPOR EXTRACTION SYSTEM AND FREE PRODUCT RECOVERY SYSTEMS (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070
  • GROUNDWATER MONITORING REPORT FOR THE FORMER PUBLIC WORKS GAS STATION (PUBLIC DOCUMENT)
    Site(s): UST 000003
  • GROUNDWATER MONITORING REPORT FOR NAVAL AIR FIELD GAS STATION (PUBLIC DOCUMENT)
    Site(s): UST 000001
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE FORMER PUBLIC WORKS GAS STATION, DATED 30 JUNE 2011 (PUBLIC DOCUMENT)
    Site(s): BASEWIDE
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE NAVAL AIR FIELD GAS STATION, DATED 30 JUNE 2011 (PUBLIC DOCUMENT)
    Site(s): BASEWIDE
  • TRANSMITTAL OF FINAL LAND USE CONTROL ACTIVITIES REPORT YEAR 2010, SNORT ROAD LANDFILL, DATED 1 JUNE 2011 (PUBLIC DOCUMENT)
    Site(s): SITE 00012
    • NAVFAC - SOUTHWEST
    • 06/02/2011
    • Correspondence
    • Record#: 001260
    • View Record
  • FINAL LAND USE CONTROL ACTIVITIES REPORT YEAR 2010, SNORT ROAD LANDFILL (PUBLIC DOCUMENT)
    Site(s): SITE 00012
    • BARAJAS AND ASSOCIATES, INC.
    • 06/01/2011
    • Report
    • Record#: 001261
    • View Record
  • INVESTIGATION SUMMARY REPORT, SITE ASSESSMENT FOR PETROLEUM CONTAMINATION AT THE FORMER PUBLIC WORKS GAS STATION
    Site(s): SITE 00001, SITE 00070, UST 000003
  • TRANSMITTAL OF FINAL WORK PLAN SUPPLEMENTAL SITE INSPECTION FOR NON-OPERABLE UNIT SITES AND SELECTED AREAS OF CONCERN, DATED 6 MAY 2011
    Site(s): SITE 00023, SITE 00042, SITE 00054, SITE 00061, SITE 00063, SITE 00066, SITE 00077
    • NAVFAC - SOUTHWEST
    • 05/20/2011
    • Correspondence
    • Record#: 001262
    • View Record
  • TRANSMITTAL OF DRAFT SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN), REMEDIAL DESIGN FOR MONITORED NATURAL ATTENUATION, AREA R OPERABLE UNIT, DATED 1 MARCH 2011 (PUBLIC DOCUMENT)
    Site(s): SITE 00015, SITE 00055
    • CHADUX - TT, JOINT VENTURE
    • 05/10/2011
    • Correspondence
    • Record#: 002075
    • View Record
  • FINAL WORK PLAN SUPPLEMENTAL SITE INSPECTION FOR NON-OPERABLE UNIT SITES AND SELECTED AREAS OF CONCERN
    Site(s): SITE 00023, SITE 00042, SITE 00054, SITE 00061, SITE 00063, SITE 00066, SITE 00077
  • FINAL ACCIDENT PREVENTION PLAN, SUPPLEMENTAL SITE INSPECTION FOR SITES 23, 42, 54, 61, 63, 66, AND 77
    Site(s): SITE 00023, SITE 00042, SITE 00054, SITE 00061, SITE 00063, SITE 00066, SITE 00077
  • FINAL SITE INSPECTION MUNITIONS RESPONSE PROGRAM SITES (INCLUDES RAW ANALYTICAL DATA; AND CD COPY) [SEE RECORD # 1253 - NAVFAC SW TRANSMITTAL LETTER]
    Site(s): BASEWIDE
    • CHADUX - TT, JOINT VENTURE
    • 04/08/2011
    • Report
    • Record#: 001254
    • View Record
  • TRANSMITTAL OF FINAL SITE INSPECTION REPORT, MOJAVE AERIAL GUNNERY RANGE C, TARGET 71 (SECTION 18), DATED 1 APRIL 2011
    Site(s): BASEWIDE
    • NAVFAC - SOUTHWEST
    • 04/08/2011
    • Correspondence
    • Record#: 001255
    • View Record
  • TRANSMITTAL OF FINAL SITE INSPECTION MUNITIONS RESPONSE PROGRAM SITES, DATED 8 APRIL 2011
    Site(s): BASEWIDE
    • NAVFAC - SOUTHWEST
    • 04/08/2011
    • Correspondence
    • Record#: 001253
    • View Record
  • FINAL SITE INSPECTION REPORT, MOJAVE AERIAL GUNNERY RANGE C, TARGET 71 (SECTION 18)
    Site(s): BASEWIDE
  • FINAL ACCIDENT PREVENTION PLAN REMEDIAL DESIGN / REMEDIAL ACTION FOR AREA R AND ARMITAGE AIRFIELD OPERABLE UNITS (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00015, SITE 00044, SITE 00045, SITE 00050, SITE 00055, SITE 00058
  • FINAL WORK PLAN FOR OPERATION OF SOIL VAPOR EXTRACTION SYSTEMS, FREE PRODUCT RECOVERY SYSTEMS, AND GROUNDWATER MONITORING (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070, UST 0000010
  • TRANSMITTAL OF FINAL WORK PLAN FOR OPERATION OF SOIL VAPOR EXTRACTION SYSTEMS, FREE PRODUCT RECOVERY SYSTEMS, AND GROUNDWATER MONITORING, DATED 1 MARCH 2011 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070, UST 000010
  • TRANSMITTAL OF DRAFT FINAL SITE INSPECTION MUNITIONS RESPONSE PROGRAM SITES, DATED 4 FEBRUARY 2011
    Site(s): BASEWIDE
    • NAVFAC - SOUTHWEST
    • 02/04/2011
    • Correspondence
    • Record#: 001245
    • View Record
  • ANNUAL REPORT (NOVEMBER 2009 - SEPTEMBER 2010) FOR OPERATION OF SOIL VAPOR EXTRACTION SYSTEM AND FREE PRODUCT RECOVERY SYSTEMS (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070
  • TRANSMITTAL OF DRAFT FINAL WORK PLAN REMEDIATION OF SOIL, SITES 45 AND 64, DATED 18 JANUARY 2011
    Site(s): SITE 00045, SITE 00064
    • NAVFAC - SOUTHWEST
    • 01/14/2011
    • Correspondence
    • Record#: 001225
    • View Record
  • FINAL ADDENDUM 01 TO THE FINAL SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN/QUALITY ASSURANCE PROJECT PLAN) SITE ASSESSMENT FOR PETROLEUM CONTAMINATION AT THE FORMER PUBLIC WORKS GAS STATION
    Site(s): BASEWIDE
    • RICHARD BRADY AND ASSOCIATES
    • 12/08/2010
    • Report
    • Record#: 001243
    • View Record
  • TRANSMITTAL OF FINAL ADDENDUM 01 TO THE FINAL SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN/QUALITY ASSURANCE PROJECT PLAN) SITE ASSESSMENT FOR PETROLEUM CONTAMINATION AT THE FORMER PUBLIC WORKS GAS STATION, DATED 08 DECEMBER 2010
    Site(s): BASEWIDE
    • NAVFAC - SOUTHWEST
    • 12/08/2010
    • Correspondence
    • Record#: 001242
    • View Record
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE FORMER PUBLIC WORKS GAS STATION, DATED 29 NOVEMBER 2010 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000003
  • GROUNDWATER MONITORING REPORT FOR THE NAVAL AIR FIELD GAS STATION (PUBLIC DOCUMENT)
    Site(s): UST 000001
  • GROUNDWATER MONITORING REPORT FOR FORMER PUBLIC WORKS GAS STATION (PUBLIC DOCUMENT)
    Site(s): UST 000003
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE NAVAL AIR FIELD GAS STATION, DATED 29 NOVEMBER 2010 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000001
  • FINAL MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 17 NOVEMBER 2010 - INCLUDES AGENDA; AND VARIOUS HANDOUTS
    Site(s): SITE 00006, SITE 00022, SITE 00044, SITE 00045, SITE 00064
  • COMMENTS ON RESPONSE TO COMMENTS ON DRAFT FINAL MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT REMEDIAL INVESTIGATION REPORT, DATED 1 NOVEMBER 2008
    Site(s): SITE 00007, SITE 00013, SITE 00033, SITE 00047, SITE 00069, SITE 00070, SITE 00071, SITE 00072
    • CALIFORNIA DEPARTMENT OF FISH AND GAME - SACRAMENTO, CA
    • 11/03/2010
    • Correspondence
    • Record#: 001495
    • Request for Record
  • TRANSMITTAL OF DRAFT FINAL WORK PLAN SUPPLEMENTAL SITE INSPECTION FOR NON-OPERABLE UNIT SITES AND SELECTED AREAS OF CONCERN, DATED 20 SEPTEMBER 2010
    Site(s): SITE 00004, SITE 00008, SITE 00010, SITE 00014, SITE 00016, SITE 00017, SITE 00018, SITE 00019, SITE 00020, SITE 00021, SITE 00023, SITE 00024, SITE 00025, SITE 00026, SITE 00028, SITE 00030, SITE 00035, SITE 00036, SITE 00038, SITE 00040, SITE 00042, SITE 00046, SITE 00052, SITE 00053, SITE 00054, SITE 00059, SITE 00061, SITE 00062, SITE 00063, SITE 00065, SITE 00066, SITE 00067, SITE 00071, SITE 00073, SITE 00074, SITE 00076, SITE 00077, SITE 00078
    • NAVFAC - SOUTHWEST
    • 09/28/2010
    • Correspondence
    • Record#: 000918
    • View Record
  • FINAL MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 22 SEPTEMBER 2010 - INCLUDES AGENDA; AND VARIOUS HANDOUTS
    Site(s): AOC 000064, SITE 00022, SITE 00043, SITE 00044
    • BARAJAS AND ASSOCIATES, INC.
    • 09/22/2010
    • Minutes
    • Record#: 001239
    • View Record
  • GROUNDWATER MONITORING REPORT FOR THE FORMER PUBLIC WORKS GAS STATION (PUBLIC DOCUMENT)
    Site(s): BASEWIDE
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE NAVAL AIR FIELD GAS STATION, DATED 15 SEPTEMBER 2010 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000001
  • SEMI-ANNUAL REPORT (NOVEMBER 2009 - APRIL 2010) FOR OPERATION OF THE SOIL VAPOR EXTRACTION SYSTEM AND FREE PRODUCT RECOVERY SYSTEMS (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070
  • GROUNDWATER MONITORING REPORT FOR NAVAL AIR FIELD GAS STATION (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • FINAL MICHELSON LABORATORY/PUBLIC WORKS REMEDIAL INVESTIGATION REPORT
    Site(s): AOC 000234, SITE 00007, SITE 00013, SITE 00033, SITE 00047, SITE 00069, SITE 00070, SITE 00071, SITE 00072
  • TRANSMITTAL OF FINAL REMEDIAL DESIGN REPORT, ENGINEERED ALTERNATIVE COVERS FOR SITE 6 (T-RANGE DISPOSAL AREA), DATED 1 AUGUST 2010 (PUBLIC DOCUMENT)
    Site(s): SITE 00006
    • NAVFAC - SOUTHWEST
    • 08/20/2010
    • Correspondence
    • Record#: 001214
    • View Record
  • TRANSMITTAL OF DRAFT SITE INSPECTION REPORT, MOJAVE AERIAL GUNNERY RANGE C, TARGET 71, DATED 1 AUGUST 2010
    Site(s): BASEWIDE
    • MALCOLM PIRNIE, INC.
    • 08/06/2010
    • Correspondence
    • Record#: 002072
    • View Record
  • FINAL REMEDIAL DESIGN FOR PRODUCT RECOVERY SYSTEM AT SITE 44 ARMITAGE FIELD OPERABLE UNIT (PUBLIC DOCUMENT)
    Site(s): SITE 00044
  • FINAL REMEDIAL DESIGN REPORT, ENGINEERED ALTERNATIVE COVERS FOR SITE 6 (T-RANGE DISPOSAL AREA) [PUBLIC DOCUMENT]
    Site(s): SITE 00006
  • TRANSMITTAL OF FINAL REMEDIAL DESIGN FOR PRODUCT RECOVERY SYSTEM AT SITE 44 ARMITAGE FIELD OPERABLE UNIT, DATED 4 AUGUST 2010 (PUBLIC DOCUMENT)
    Site(s): SITE 00044
    • NAVFAC - SOUTHWEST
    • 07/30/2010
    • Correspondence
    • Record#: 001251
    • View Record
  • TRANSMITTAL OF FINAL WORK PLAN SITE ASSESSMENT FOR PETROLEUM CONTAMINATION AT THE FORMER PUBLIC WORKS GAS STATION, DATED 4 JUNE 2010
    Site(s): BASEWIDE
    • NAVFAC - SOUTHWEST
    • 06/07/2010
    • Correspondence
    • Record#: 000619
    • View Record
  • FINAL WORK PLAN SITE ASSESSMENT FOR PETROLEUM CONTAMINATION AT FORMER PUBLIC WORKS GAS STATION
    Site(s): UST 000003
    • RICHARD BRADY AND ASSOCIATES
    • 06/04/2010
    • Report
    • Record#: 000627
    • View Record
  • FINAL TECHNICAL MEMORANDUM, AREAS OF CONCERN INVESTIGATION
    Site(s): AOC 000059, AOC 000064, AOC 000070, AOC 000099, AOC 000118, AOC 000166, AOC 000180, AOC 000206, AOC 000211, AOC 000230, AOC 000235, AOC 000239, AOC 000243
    • TETRA TECH EM, INC.
    • 06/04/2010
    • Report
    • Record#: 000576
    • View Record
  • TRANSMITTAL OF INVESTIGATION SUMMARY REPORT, SITE ASSESSMENT FOR PETROLEUM CONTAMINATION AT THE FORMER PUBLIC WORKS GAS STATION, DATED 28 MAY 2011
    Site(s): SITE 00001, SITE 00070, UST 000003
    • RICHARD BRADY AND ASSOCIATES
    • 05/28/2010
    • Correspondence
    • Record#: 002076
    • View Record
  • FINAL MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 19 MAY 2010 - INCLUDES AGENDA; AND VARIOUS HANDOUTS
    Site(s): AOC 000059, AOC 000064, AOC 000070, AOC 000099, AOC 000118, AOC 000166, AOC 000180, AOC 000206, AOC 000211, AOC 000230, AOC 000235, AOC 000239, AOC 000243, SITE 00045, SITE 00064
  • FINAL ACTION MEMORANDUM, NON-TIME-CRITICAL REMOVAL ACTION FOR PUBLIC WORKS TRANSFORMER STORAGE PIT AND HIGH VOLTAGE SHOP STORAGE AREA
    Site(s): SITE 00068
    • SULLIVAN CONSULTING GROUP - TETRA TECH EM, INC., JOINT VENTURE
    • 05/14/2010
    • Report
    • Record#: 001277
    • View Record
  • CLOSURE RECOMMENDATION FOR NAVAL EXCHANGE GAS STATION SITE (PUBLIC DOCUMENT)
    Site(s): UST 000003
  • ANNUAL REPORT (NOVEMBER 2008 - OCTOBER 2009) FOR OPERATION OF THE SOIL VAPOR EXTRACTION SYSTEM AND FREE PRODUCT RECOVERY SYSTEMS (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070
  • TRANSMITTAL OF FINAL REMOVAL ACTION WORK PLAN SITE 68, DATED 6 MAY 2010
    Site(s): SITE 00068
    • NAVFAC - SOUTHWEST
    • 05/06/2010
    • Correspondence
    • Record#: 000613
    • View Record
  • FINAL REMOVAL ACTION WORK PLAN SITE 68
    Site(s): SITE 00068
    • CDM FEDERAL PROGRAMS CORP.
    • 05/06/2010
    • Report
    • Record#: 000606
    • View Record
  • TRANSMITTAL OF DRAFT WORK PLAN SUPPLEMENTAL SITE INSPECTION FOR NON-OPERABLE UNIT SITES AND SELECTED AREAS OF CONCERN, DATED 1 APRIL 2010
    Site(s): SITE 00004, SITE 00008, SITE 00010, SITE 00014, SITE 00016, SITE 00017, SITE 00018, SITE 00019, SITE 00020, SITE 00021, SITE 00023, SITE 00024, SITE 00025, SITE 00026, SITE 00028, SITE 00030, SITE 00035, SITE 00036, SITE 00038, SITE 00040, SITE 00042, SITE 00046, SITE 00052, SITE 00053, SITE 00054, SITE 00059, SITE 00061, SITE 00062, SITE 00063, SITE 00065, SITE 00071, SITE 00073, SITE 00074, SITE 00076, SITE 00077, SITE 00078
    • CHADUX - TT, JOINT VENTURE
    • 04/03/2010
    • Correspondence
    • Record#: 001955
    • View Record
  • FINAL MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 24 MARCH 2010 - INCLUDES AGENDA; AND VARIOUS HANDOUTS
    Site(s): SITE 00023, SITE 00042, SITE 00045, SITE 00054, SITE 00061, SITE 00063, SITE 00064, SITE 00066, SITE 00077
  • FINAL ACCIDENT PREVENTION PLAN SOIL REMEDIATION SITES 45 AND 64
    Site(s): SITE 00045, SITE 00064
    • WESTON SOLUTIONS, INC.
    • 03/18/2010
    • Report
    • Record#: 001824
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN REMOVAL ACTION AT SITE 68
    Site(s): SITE 00068
    • CDM FEDERAL PROGRAMS CORP.
    • 03/12/2010
    • Report
    • Record#: 000494
    • View Record
  • TRANSMITTAL OF DRAFT WORK PLAN, SITE ASSESSMENT FOR PETROLEUM CONTAMINATION AT THE FORMER PUBLIC WORKS GAS STATION, DATED 1 MARCH 2010
    Site(s): BASEWIDE
    • RICHARD BRADY AND ASSOCIATES
    • 03/01/2010
    • Correspondence
    • Record#: 002043
    • View Record
  • TRANSMITTAL OF DRAFT SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN) REMEDIATION OF SOIL, SITES 45 AND 64, DATED 22 FEBRUARY 2010
    Site(s): SITE 00045, SITE 00064
  • TRANSMITTAL OF DRAFT WORK PLAN REMEDIATION OF SOIL SITES 45 AND 64, DATED 2 FEBRUARY 2010
    Site(s): SITE 00045, SITE 00064
  • FINAL MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 13 JANUARY 2010 - INCLUDES AGENDA; AND VARIOUS HANDOUTS
    Site(s): SITE 00006, SITE 00044, SITE 00064
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE NAVAL AIR FIELD GAS STATION, DATED 7 JANUARY 2010 (PUBLIC DOCUMENT)
    Site(s): UST 000001
  • GROUNDWATER MONITORING REPORT FOR FORMER PUBLIC WORKS GAS STATION (PUBLIC DOCUMENT)
    Site(s): UST 000003
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE FORMER PUBLIC WORKS GAS STATION, DATED 7 JANUARY 2010 (PUBLIC DOCUMENT)
    Site(s): UST 000003
  • GROUNDWATER MONITORING REPORT FOR NAVAL AIR FIELD GAS STATION (PUBLIC DOCUMENT)
    Site(s): UST 000001
  • SEMI-ANNUAL REPORT (NOVEMBER 2008 - APRIL 2009) FOR OPERATION OF SOIL VAPOR EXTRACTION SYSTEM AND FREE PRODUCT RECOVERY SYSTEMS (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070, UST 000010
  • TRANSMITTAL OF SEMI-ANNUAL REPORT (NOVEMBER 2008 - APRIL 2009) FOR THE OPERATION OF THE SOIL VAPOR EXTRACTION SYSTEM AND FREE PRODUCT RECOVERY SYSTEMS, DATED 4 AUGUST 2009 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070, UST 000010
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE FORMER PUBLIC WORKS GAS STATION, DATED 22 JUNE 2009 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000003
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE NAVAL EXCHANGE GAS STATION, DATED 22 JUNE 2009 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000003
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE NAVAL AIR FIELD GAS STATION, DATED 22 JUNE 2009 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000001
  • GROUNDWATER MONITORING REPORT FOR THE NAVAL EXCHANGE GAS STATION (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • GROUNDWATER MONITORING REPORT FOR THE NAVAL AIR FIELD GAS STATION (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • GROUNDWATER MONITORING REPORT FOR THE FORMER PUBLIC WORKS GAS STATION (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000003
  • TRANSMITTAL OF FINAL WORK PLAN, SITE INSPECTION AT MUNITIONS CONSTITUENTS AND MUNITIONS EXPLOSIVES OF CONCERN SITES, DATED 18 MAY 2009
    Site(s): BASEWIDE
    • CHADUX - TT, JOINT VENTURE
    • 05/18/2009
    • Correspondence
    • Record#: 002066
    • View Record
  • FINAL WORK PLAN, SITE INSPECTION AT MUNITIONS CONSTITUENTS AND MUNITIONS EXPLOSIVES OF CONCERN SITES
    Site(s): BASEWIDE
    • CHADUX - TT, JOINT VENTURE
    • 05/18/2009
    • Report
    • Record#: 001204
    • View Record
  • TRANSMITTAL OF ANNUAL REPORT (NOVEMBER 2007 - OCTOBER 2008) FOR OPERATION OF THE SOIL VAPOR EXTRACTION SYSTEM AND FREE PRODUCT RECOVERY SYSTEMS, DATED 13 MAY 2009 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070, UST 000010
  • ANNUAL REPORT (NOVEMBER 2007 - OCTOBER 2008) FOR OPERATION OF THE SOIL VAPOR EXTRACTION SYSTEM AND FREE PRODUCT RECOVERY SYSTEMS (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070, UST 0000010
  • FINAL ACCIDENT PREVENTION PLAN FOR SITE INSPECTION AT MUNITIONS CONSTITUENTS AND MUNITIONS EXPLOSIVES OF CONCERN SITES - CHINA LAKE POLICE DEPARTMENT PISTOL RANGE, SIERRA DESERT GUN CLUB SMALL ARMS RANGE, ARMITAGE FIELD SKEET RANGE, AND BORE SITE RANGE/TARGET BUTT
    Site(s): BASEWIDE
  • FINAL HEALTH AND SAFETY PLAN FOR SITE INSPECTION AT MUNITIONS CONSTITUENTS AND MUNITIONS EXPLOSIVES OF CONCERN SITES - CHINA LAKE POLICE DEPARTMENT PISTOL RANGE, SIERRA DESERT GUN CLUB SMALL ARMS RANGE, ARMITAGE FIELD SKEET RANGE, AND BORE SITE RANGE/TARGET BUTT
    Site(s): BASEWIDE
    • CHADUX - TT, JOINT VENTURE
    • 04/01/2009
    • Report
    • Record#: 001206
    • View Record
  • RESPONSE TO COMMENTS ON DRAFT MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT REMEDIAL INVESTIGATION REPORT, DATED 1 MAY 2005
    Site(s): AOC 000234, SITE 00007, SITE 00013, SITE 00033, SITE 00047, SITE 00069, SITE 00070, SITE 00071, SITE 00072
    • BARAJAS AND ASSOCIATES, INC.
    • 03/12/2009
    • Correspondence
    • Record#: 001189
    • View Record
  • FINAL SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN), REMEDIAL DESIGN FOR MONITORED NATURAL ATTENUATION, ARMITAGE FIELD OPERABLE UNIT (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00044, SITE 00045, SITE 00050, SITE 00058
  • MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 14 JANUARY 2009
    Site(s): SITE 00008, SITE 00012, SITE 00045, SITE 00049, SITE 00064
  • FINAL SITE INSPECTION WORK PLAN, MOJAVE AERIAL GUNNERY RANGE C TARGET 71, SECTION 18
    Site(s): BASEWIDE
  • TRANSMITTAL OF FINAL SITE INSPECTION WORK PLAN, MOJAVE AERIAL GUNNERY RANGE C TARGET 71, SECTION 18, DATED 1 JANUARY 2008
    Site(s): BASEWIDE
    • NAVFAC - SOUTHWEST DIVISION
    • 12/23/2008
    • Correspondence
    • Record#: 001200
    • View Record
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE NAVAL AIR FIELD GAS STATION, DATED 12 DECEMBER 2008 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000001
  • TRANSMITTAL OF DRAFT SEMI-ANNUAL REPORT (NOVEMBER 2007 - APRIL 2008) FOR OPERATION OF THE SOIL VAPOR EXTRACTION SYSTEM AND FREE PRODUCT RECOVERY SYSTEMS, DATED 10 DECEMBER 2008 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00044, SITE 00070
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE NAVAL EXCHANGE GAS STATION, DATED 12 DECEMBER 2008 (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • GROUNDWATER MONITORING REPORT FOR THE NAVAL AIR FIELD GAS STATION (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000001
  • GROUNDWATER MONITORING REPORT FOR THE NAVAL EXCHANGE GAS STATION (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • GROUNDWATER MONITORING REPORT FOR THE FORMER PUBLIC WORKS GAS STATION (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000003
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE FORMER PUBLIC WORKS GAS STATION, DATED 12 DECEMBER 2008 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000003
  • TRANSMITTAL OF DRAFT SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN) REMEDIAL DESIGN FOR MONITORED NATURAL ATTENUATION, DATED 1 NOVEMBER 2008 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00002, SITE 00044, SITE 00045
    • TETRA TECH EM, INC.
    • 11/25/2008
    • Correspondence
    • Record#: 002055
    • View Record
  • MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 12 NOVEMBER 2008 - INCLUDES AGENDA; AND VARIOUS HANDOUTS
    Site(s): AOC 000036, SITE 00068
  • TRANSMITTAL OF DRAFT REMEDIAL DESIGN REPORT, ALTERNATIVE COVERS FOR SITE 6 (T-RANGE DISPOSAL AREA) [PUBLIC DOCUMENT]
    Site(s): SITE 00006
    • TETRA TECH EM, INC.
    • 11/04/2008
    • Correspondence
    • Record#: 002056
    • View Record
  • TRANSMITTAL OF DRAFT FINAL MICHELSON LABORATORY/PUBLIC WORKS OPERABLE UNIT REMEDIAL INVESTIGATION REPORT, DATED 1 NOVEMBER 2008
    Site(s): SITE 00007, SITE 00013, SITE 00033, SITE 00047, SITE 00069, SITE 00070, SITE 00071, SITE 00072
    • NAVFAC - SOUTHWEST
    • 11/03/2008
    • Correspondence
    • Record#: 000732
    • View Record
  • TRANSMITTAL OF DRAFT ACTION MEMORANDUM NON-TIME-CRITICAL REMOVAL ACTION FOR PUBLIC WORKS TRANSFORMER STORAGE PIT AND HIGH VOLTAGE SHOP STORAGE AREA, DATED 1 OCTOBER 2008
    Site(s): SITE 00068
    • SULLIVAN CONSULTING GROUP - TETRA TECH EM, INC., JOINT VENTURE
    • 10/31/2008
    • Correspondence
    • Record#: 002054
    • View Record
  • FINAL WORK PLAN, SITE CHARACTERIZATION OF GROUNDWATER, FORMER FUEL PRODUCT RECOVERY PIPING AIRFIELD FUEL FARM
    Site(s): BASEWIDE
  • TRANSMITTAL OF THE FINAL PROPOSED PLAN FOR CLEANUP ACTION PROPULSION LABORATORY (ENCLOSURE IS RECORD # 1174)
    Site(s): BASEWIDE
    • NAVFAC - SOUTHWEST
    • 10/15/2008
    • Correspondence
    • Record#: 001173
    • View Record
  • GROUNDWATER MONITORING REPORT FOR THE NAVAL EXCHANGE GAS STATION (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE FORMER PUBLIC WORKS GAS STATION, DATED 22 SEPTEMBER 2008 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000003
  • GROUNDWATER MONITORING REPORT FOR THE FORMER PUBLIC WORKS GAS STATION (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000003
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE NAVAL AIR FIELD GAS STATION, DATED 22 SEPTEMBER 2008 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000001
  • GROUNDWATER MONITORING REPORT FOR THE NAVAL AIR FIELD GAS STATION (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000001
  • TRANSMITTAL OF GROUNDWATER MONITORING REPORT FOR THE NAVAL EXCHANGE GAS STATION, DATED 22 SEPTEMBER 2008 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, UST 000003
  • FINAL ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) NON-TIME CRITICAL REMOVAL ACTION, PUBLIC WORKS TRANSFORMER STORAGE PIT AND HIGH VOLTAGE SHOP STORAGE AREA
    Site(s): SITE 00068
    • SULLIVAN CONSULTING GROUP - TETRA TECH EM, INC., JOINT VENTURE
    • 09/19/2008
    • Report
    • Record#: 001171
    • View Record
  • TRANSMITTAL OF FINAL ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) NON-TIME CRITICAL REMOVAL ACTION, PUBLIC WORKS TRANSFORMER STORAGE PIT AND HIGH VOLTAGE SHOP STORAGE AREA, DATED 19 SEPTEMBER 2008
    Site(s): SITE 00068
    • NAVFAC - SOUTHWEST
    • 09/19/2008
    • Correspondence
    • Record#: 001170
    • View Record
  • TRANSMITTAL OF DRAFT FINAL SITE INSPECTION WORK PLAN, MOJAVE AERIAL GUNNERY RANGE C TARGET 71, SECTION 18, DATED 18 SEPTEMBER 2008
    Site(s): BASEWIDE
    • NAVFAC - SOUTHWEST
    • 09/18/2008
    • Correspondence
    • Record#: 001195
    • View Record
  • FINAL WORK PLAN, UNDERGROUND STORAGE TANK (UST) SECONDARY CONTAINMENT TESTING AT NAVY EXCHANGE AND PUBLIC WORKS GAS STATIONS AND SUPERSONIC ORDNANCE RESEARCH TRACK
    Site(s): UST 000003
    • INSIGHT ENVIRONMENTAL, ENGINEERING, AND CONSTRUCTION, INC.
    • 09/14/2008
    • Report
    • Record#: 002129
    • Request for Record
  • FINAL LAND-USE CONTROL REMEDIAL DESIGN, ARMITAGE FIELD OPERABLE UNIT (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00044, SITE 00045, SITE 00050, SITE 00058
  • FINAL LAND-USE CONTROL REMEDIAL DESIGN SITE 6 (T-RANGE DISPOSAL AREA) [PUBLIC DOCUMENT]
    Site(s): SITE 00006
    • TETRA TECH EM, INC.
    • 09/10/2008
    • Report
    • Record#: 001166
    • View Record
  • TRANSMITTAL OF FINAL LAND-USE CONTROL REMEDIAL DESIGN, ARMITAGE FIELD OPERABLE UNIT, DATED 12 SEPTEMBER 2008 (PUBLIC DOCUMENT)
    Site(s): BASEWIDE
    • NAVFAC - SOUTHWEST
    • 09/09/2008
    • Correspondence
    • Record#: 001163
    • View Record
  • TRANSMITTAL OF FINAL LAND-USE CONTROL REMEDIAL DESIGN SITE 6 (T-RANGE DISPOSAL AREA), DATED 10 SEPTEMBER 2008 (PUBLIC DOCUMENT)
    Site(s): SITE 00006
    • NAVFAC - SOUTHWEST
    • 09/09/2008
    • Correspondence
    • Record#: 001165
    • View Record
  • REQUEST TO IDENTIFY POTENTIAL ACTION-SPECIFIC STATE APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS FOR A CORRECTIVE ACTION MANAGEMENT UNIT IN THE PROPULSION LAB OPERABLE UNIT
    Site(s): SITE 00006
    • NAVFAC - SOUTHWEST
    • 09/03/2008
    • Correspondence
    • Record#: 001162
    • View Record
  • MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 13 AUGUST 2008 - INCLUDES AGENDA; AND VARIOUS HANDOUTS
    Site(s): SITE 00006
  • TECHNICAL MEMORANDUM SITE 6 PERCHLORATE STUDY (PUBLIC DOCUMENT)
    Site(s): SITE 00006
  • TRANSMITTAL OF DRAFT FINAL ENGINEERING EVALUATION/COST ANALYSIS (EE/CA) NON-TIME CRITICAL REMOVAL ACTION, PUBLIC WORKS TRANSFORMER STORAGE PIT AND HIGH VOLTAGE SHOP STORAGE AREA, DATED 10 JUNE 2008
    Site(s): SITE 00068
  • FINAL TECHNICAL MEMORANDUM, SITE CHARACTERIZATION AND ANALYSIS PENETROMETER SYSTEM LASER INDUCED FLORESCENCE INVESTIGATION FOR FREE PHASE PETROLEUM CONTAMINATION
    Site(s): SITE 00001, SITE 00044, SITE 00070
  • FINAL RESPONSE TO COMMENTS ON DRAFT ACCIDENT PREVENTION PLAN, MONITORED NATURAL ATTENUATION SAMPLING AND REMEDIAL DESIGN ACTIVITIES AT THE ARMITAGE FIELD OPERABLE UNIT, DATED 28 APRIL 2008 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00044, SITE 00045, SITE 00050, SITE 00058
    • TETRA TECH EM, INC.
    • 06/02/2008
    • Correspondence
    • Record#: 001157
    • View Record
  • FINAL RESPONSE TO COMMENTS ON DRAFT HEALTH AND SAFETY PLAN, MONITORED NATURAL ATTENUATION SAMPLING AND REMEDIAL DESIGN ACTIVITIES AT THE ARMITAGE FIELD OPERABLE UNIT, DATED 28 APRIL 2008 (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00044, SITE 00045, SITE 00050, SITE 00058
    • TETRA TECH EM, INC.
    • 06/02/2008
    • Correspondence
    • Record#: 001158
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN, MONITORED NATURAL ATTENUATION SAMPLING AND REMEDIAL DESIGN ACTIVITIES AT THE ARMITAGE FIELD OPERABLE UNIT (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00044, SITE 00045, SITE 00050, SITE 00058
  • FINAL HEALTH AND SAFETY PLAN, MONITORED NATURAL ATTENUATION SAMPLING AND REMEDIAL DESIGN ACTIVITIES AT THE ARMITAGE FIELD OPERABLE UNIT (PUBLIC DOCUMENT)
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00044, SITE 00045, SITE 00050, SITE 00058
  • TRANSMITTAL OF FINAL SUMMARY REPORT, WELL ABANDONMENT AT INSTRUMENTATION OPERATIONS BUILDING GAS STATION, DATED 27 MAY 2008
    Site(s): UST 000005
    • NAVFAC - SOUTHWEST
    • 05/27/2008
    • Correspondence
    • Record#: 001152
    • View Record
  • FINAL SUMMARY REPORT, WELL ABANDONMENT AT INSTRUMENTATION OPERATIONS BUILDING GAS STATION
    Site(s): UST 000005
    • BARAJAS AND ASSOCIATES, INC.
    • 05/27/2008
    • Report
    • Record#: 001153
    • View Record
  • MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 14 MAY 2008 - INCLUDES AGENDA; AND VARIOUS HANDOUTS
    Site(s): SITE 00001, SITE 00003, SITE 00006, SITE 00044, SITE 00045, SITE 00050, SITE 00058
  • MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 9 APRIL 2008 - INCLUDES AGENDA; AND VARIOUS HANDOUTS
    Site(s): AOC 000079, SITE 00008, SITE 00011, SITE 00046, SITE 00049
    • BARAJAS AND ASSOCIATES, INC.
    • 04/09/2008
    • Minutes
    • Record#: 001184
    • View Record
  • TRANSMITTAL OF FINAL PROPOSED PLAN FOR CLEANUP ACTION, AREA R OPERABLE UNIT, DATED 1 MARCH 2008
    Site(s): OU AREA R
    • NAVFAC - SOUTHWEST
    • 04/01/2008
    • Correspondence
    • Record#: 001150
    • View Record
  • FINAL LAND USE CONTROL ACTIVITIES REPORT YEAR 2006-2007, SITE 12, SNORT ROAD LANDFILL (PUBLIC DOCUMENT)
    Site(s): SITE 00012
    • BARAJAS AND ASSOCIATES, INC.
    • 03/26/2008
    • Report
    • Record#: 001142
    • View Record
  • TRANSMITTAL OF FINAL RECORD OF DECISION/REMEDIAL ACTION PLAN, ARMITAGE FIELD OPERABLE UNIT, DATED 28 SEPTEMBER 2007
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00044, SITE 00045, SITE 00050, SITE 00058
    • NAVFAC - SOUTHWEST
    • 03/25/2008
    • Correspondence
    • Record#: 001769
    • View Record
  • TRANSMITTAL OF FINAL LAND USE CONTROL ACTIVITIES REPORT YEAR 2006-2007, SITE 12, SNORT ROAD LANDFILL, DATED 26 MARCH 2008 (PUBLIC DOCUMENT)
    Site(s): SITE 00012
    • NAVFAC - SOUTHWEST
    • 03/25/2008
    • Correspondence
    • Record#: 001141
    • View Record
  • FINAL PROPOSED PLAN FOR CLEANUP ACTION, AREA R OPERABLE UNIT
    Site(s): OU AREA R
  • FINAL FEASIBILITY STUDY FOR THE PROPULSION LABORATORY OPERABLE UNIT
    Site(s): AOC 000079, SITE 00008, SITE 00011, SITE 00046, SITE 00049
  • TRANSMITTAL OF FINAL FEASIBILITY STUDY FOR THE PROPULSION LABORATORY OPERABLE UNIT, DATED 25 FEBRUARY 2008
    Site(s): BASEWIDE
  • TRANSMITTAL OF FINAL FEASIBILITY STUDY REPORT, AREA R OPERABLE UNIT, DATED 15 FEBRUARY 2008
    Site(s): OU AREA R
  • FINAL FEASIBILITY STUDY REPORT, AREA R OPERABLE UNIT
    Site(s): OU AREA R, SITE 00015, SITE 00055, SITE 00064
  • CONCURRENCE WITH DRAFT FINAL FEASIBILITY STUDY FOR THE PROPULSION LABORATORY OPERABLE UNIT, DATED 29 NOVEMBER 2007
    Site(s): BASEWIDE
  • FINAL HEALTH AND SAFETY PLAN, AREAS OF CONCERN INVESTIGATION
    Site(s): AOC 000059, AOC 000064, AOC 000070, AOC 000099, AOC 000118, AOC 000166, AOC 000180, AOC 000206, AOC 000211, AOC 000230, AOC 000235, AOC 000239, AOC 000243
    • TETRA TECH EM, INC.
    • 02/08/2008
    • Report
    • Record#: 001135
    • View Record
  • FINAL WORK PLAN, AREAS OF CONCERN INVESTIGATION
    Site(s): AOC 000059, AOC 000064, AOC 000070, AOC 000099, AOC 000118, AOC 000166, AOC 000180, AOC 000206, AOC 000211, AOC 000230, AOC 000235, AOC 000239, AOC 000243
  • FINAL RESPONSE TO COMMENTS ON DRAFT HEALTH AND SAFETY PLAN, AREAS OF CONCERN INVESTIGATION, DATED 16 JANUARY 2008
    Site(s): BASEWIDE
    • TETRA TECH EM, INC.
    • 02/08/2008
    • Correspondence
    • Record#: 001134
    • View Record
  • FINAL RESPONSE TO COMMENTS ON DRAFT ACCIDENT PREVENTION PLAN, AREAS OF CONCERN INVESTIGATION, DATED 16 JANUARY 2008
    Site(s): BASEWIDE
    • TETRA TECH EM, INC.
    • 02/08/2008
    • Correspondence
    • Record#: 001131
    • View Record
  • FINAL ACCIDENT PREVENTION PLAN, AREAS OF CONCERN INVESTIGATION
    Site(s): AOC 000059, AOC 000064, AOC 000070, AOC 000099, AOC 000118, AOC 000166, AOC 000180, AOC 000206, AOC 000211, AOC 000230, AOC 000235, AOC 000239, AOC 000243
  • FINAL SEMI-ANNUAL REPORT FOR OPERATION OF THE SOIL VAPOR EXTRACTION SYSTEM AND FREE PRODUCT RECOVERY SYSTEMS
    Site(s): SITE 00001
  • FINAL WORK PLAN, WELL ABANDONMENT INSTRUMENTATION OPERATIONS BUILDING GAS STATION
    Site(s): BASEWIDE
  • TRANSMITTAL OF REPLACEMENT PAGES CONVERTING THE DRAFT WORK PLAN FOR GROUNDWATER SAMPLING AND ANALYSIS NAVY EXCHANGE GAS STATION, FORMER PUBLIC WORKS GAS STATION, AND NAVAL AIR FIELD GAS STATION, TO FINAL, DATED 2 JANUARY 2008
    Site(s): BASEWIDE
    • NAVFAC - SOUTHWEST
    • 01/16/2008
    • Correspondence
    • Record#: 001831
    • View Record
  • MEETING MINUTES FOR RESTORATION ADVISORY BOARD (RAB) MEETING HELD ON 9 JANUARY 2008 - INCLUDES AGENDA; AND VARIOUS HANDOUTS
    Site(s): OU PP, SITE 00012
  • FINAL WORK PLAN FOR GROUNDWATER SAMPLING AND ANALYSIS NAVY EXCHANGE GAS STATION, FORMER PUBLIC WORKS GAS STATION, AND NAVAL AIR FIELD GAS STATION (PUBLIC DOCUMENT)
    Site(s): BASEWIDE
  • FINAL TECHNICAL MEMORANDUM, SITE CHARACTERIZATION AND ANALYSIS PENETROMETER SYSTEM DATA GAP INVESTIGATION, NAVAL AIR FACILITIES FUEL FARM
    Site(s): BASEWIDE
  • TRANSMITTAL OF FINAL TECHNICAL MEMORANDUM, SITE CHARACTERIZATION AND ANALYSIS PENETROMETER SYSTEM DATA GAP INVESTIGATION, NAVAL AIR FACILITIES, DATED 14 DECEMBER 2007
    Site(s): BASEWIDE
    • RICHARD BRADY AND ASSOCIATES
    • 12/14/2007
    • Correspondence
    • Record#: 002042
    • View Record
  • TRANSMITTAL OF DRAFT FINAL FEASIBILITY STUDY FOR THE PROPULSION LABORATORY OPERABLE UNIT
    Site(s): BASEWIDE
  • TRANSMITTAL OF DRAFT TECHNICAL MEMORANDUM, SITE CHARACTERIZATION AND ANALYSIS PENETROMETER SYSTEM DATA GAP INVESTIGATION, NAVAL AIR FACILITIES FUEL FARM, DATED 29 NOVEMBER 2007
    Site(s): BASEWIDE
    • RICHARD BRADY AND ASSOCIATES
    • 11/29/2007
    • Correspondence
    • Record#: 002040
    • View Record
  • ANNUAL COMPLIANCE REPORT FOR SOIL VAPOR EXTRACTION SYSTEM OPERATIONS AT THE OLD FUEL FARM AT ARMITAGE FIELD, 31 OCTOBER 2006 - 31 OCTOBER 2007 (PUBLIC DOCUMENT)
    Site(s): SITE 00001
  • TRANSMITTAL OF DRAFT SITE MANAGEMENT PLAN SCHEDULES
    Site(s): SITE 00006, SITE 00012, SITE 00068, UST 000001, UST 000003
    • NAVFAC - SOUTHWEST
    • 10/15/2007
    • Correspondence
    • Record#: 001112
    • View Record
  • FINAL GROUNDWATER INVESTIGATION REPORT, FORMER BOILER PLANT NO. 1 UNDERGROUND STORAGE TANK SITE, FORMER PUBLIC WORKS GAS STATION, AND NAVAL EXCHANGE GAS STATION
    Site(s): BASEWIDE
  • CONCURRENCE WITH FINAL FIRST FIVE-YEAR REVIEW REPORT SITE 12, SNORT ROAD LANDFILL, DATED 23 JANUARY 2007 (PUBLIC DOCUMENT)
    Site(s): SITE 00012
  • FINAL RECORD OF DECISION/REMEDIAL ACTION PLAN, ARMITAGE FIELD OPERABLE UNIT
    Site(s): SITE 00001, SITE 00002, SITE 00003, SITE 00044, SITE 00045, SITE 00050, SITE 00058
  • TRANSMITTAL OF FINAL ADDENDUM 1 TO FINAL SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN/QUALITY ASSURANCE PROJECT PLAN) SITE CHARACTERIZATION AND ANALYSIS PENETROMETER SYSTEM LASER INDUCED FLUORESCENCE INVESTIGATION FOR FREE PHASE PETROLEUM CONTAMINATION
    Site(s): SITE 00044
    • RICHARD BRADY AND ASSOCIATES
    • 09/12/2007
    • Correspondence
    • Record#: 002041
    • View Record
  • FINAL ADDENDUM 1 TO THE FINAL SAMPLING AND ANALYSIS PLAN (FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN) SITE CHARACTERIZATION AND ANALYSIS PENETROMETER SYSTEM LASER INDUCED FLUORESCENCE INVESTIGATION FOR FREE PHASE PETROLEUM CONTAMINATION
    Site(s): SITE 00044
    • RICHARD BRADY AND ASSOCIATES
    • 08/29/2007
    • Report
    • Record#: 001121
    • View Record
  • TRANSMITTAL OF DRAFT SITE INSPECTION WORK PLAN, MOJAVE AERIAL GUNNERY RANGE C TARGET 71, SECTION 18, DATED 1 JUNE 2007
    Site(s): BASEWIDE
    • MALCOLM PIRNIE, INC.
    • 07/03/2007
    • Correspondence
    • Record#: 002063
    • View Record
  • FINAL WORK PLAN, SITE CHARACTERIZATION AND ANALYSIS PENETROMETER SYSTEM INVESTIGATION FOR PETROLEUM CONTAMINATION AT THE WEAPONS SURVIVABILITY LABORATORY
    Site(s): BASEWIDE
  • TRANSMITTAL OF DRAFT FINAL WORK PLAN PERCHLORATE STUDY AT SITE 6, DATED 26 JUNE 2017
    Site(s): SITE 00006
  • FINAL ADDENDUM 3 FINAL WORK PLAN PRELIMINARY ASSESSMENT AND SITE INSPECTION FOR AREAS OF CONCERN
    Site(s): SITE 00056
    • SULLIVAN CONSULTING GROUP - TETRA TECH EM, INC., JOINT VENTURE
    • 06/20/2007
    • Report
    • Record#: 001106
    • View Record
  • FINAL SAMPLING AND ANALYSIS PLAN, FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROJECT PLAN, SITE CHARACTERIZATION AND ANALYSIS PENETROMETER SYSTEM LASER INDUCED FLUORESCENCE INVESTIGATION FOR FREE PHASE PETROLEUM CONTAMINATION
    Site(s): SITE 00001, SITE 00070
    • RICHARD BRADY AND ASSOCIATES
    • 06/18/2007
    • Report
    • Record#: 001117
    • View Record
  • FINAL WORK PLAN, SITE CHARACTERIZATION AND ANALYSIS PENETROMETER SYSTEM DATA GAP INVESTIGATION OF VERTICAL EXTENT OF FUEL IMPACT AT THE NAVAL AIR FACILITIES FUEL FARM
    Site(s): BASEWIDE
  • TRANSMITTAL OF REPLACEMENT PAGES CONVERTING THE DRAFT FINAL ON-SCENE COORDINATOR'S REPORT FOR THE TIME-CRITICAL REMOVAL ACTON TO FINAL AT SITE 23, DATED 1 FEBRUARY 2007
    Site(s): SITE 00023
  • REQUEST FOR THE IDENTIFICATION OF STATE APPLICABLE OR RELEVANT AND APPROPRIATE REQUIREMENTS FOR THE ENGINEERING EVALUATION/COST ANALYSIS NON-TIME CRITICAL REMOVAL ACTION, PUBLIC WORKS TRANSFORMER STORAGE PIT AND HIGH VOLTAGE SHOP STORAGE AREA; AND TRANSMITTAL OF INTERNAL DRAFT ENGINEERING EVALUATION/COST ANALYSIS NON-TIME CRITICAL REMOVAL ACTION, ALTERNATIVES SECTION
    Site(s): SITE 00068
    • NAVFAC - SOUTHWEST
    • 03/07/2007
    • Correspondence
    • Record#: 001137
    • View Record
  • TRANSMITTAL OF REPLACEMENT PAGES CONVERTING THE DRAFT 2004 ANNUAL FENCE LINE GROUNDWATER MONITORING REPORT, DATED 1 JUNE 2006, TO FINAL
    Site(s): SITE 00001, SITE 00012, SITE 00022, SITE 00031, SITE 00069, SITE 00070
    • SULLIVAN CONSULTING GROUP, INC.